使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主
Stewart Bailey - SVP IR
Good morning, ladies and gentlemen, and welcome to our presentation of AngloGold Ashanti's results for the second quarter which is the three months to June 30. We've -- you'll notice we have a new member of our Executive Committee for the first time, Mr. Chris Sheppard, who's our Chief Operating Officer for the South African region. It's his maiden outing; be gentle with him.
All right, as is usual I'm just going to kick off with our Safe Harbor Statement. Certain statements contained in this document, other than statements of historical fact, including without limitation those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects and the outlook of our operations individually or in the aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of our exploration and production projects and completion of acquisitions, dispositions or joint venture transactions, AngloGold Ashanti's liquidity and capital resources and capital expenditures and the outcome and consequence of any potential or pending litigation or regulatory proceedings or environmental health and safety issues are forward looking statements regarding AngloGold Ashanti's operations, economic performance and financial operations - financial condition. That is, by the way, the most complex sentence ever written.
These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to differ materially from the anticipated results performance or achievements expressed or implied in these forward-looking statements. Although we believe that these expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in forward-looking statements as a result of amongst other factors changes in the economic, social and political and market conditions, the success of business and operating initiatives, changes in the regulatory environment and other government actions including environmental approvals, fluctuations in gold price and exchange rates, the outcome of pending or future litigation proceedings and business operational risk management. Sorry that one was.
For a discussion of such factors refer to our annual reports on Form 20-F filed with the US SEC. These factors are not necessarily all of the important factors that could cause our actual results to differ materially from those expressed in forward-looking statements. Other unknown or unpredictable factors could have material adverse effects on future results and consequently you are cautioned not to place undue reliance on forward-looking statements. We undertake no obligation to update publicly or release revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by these cautionary statements.
This communication may contain certain non-GAAP financial measures. We utilize these non-GAAP measures in managing our business. Non-GAAP financial measures should be viewed in addition to and not as an alternative for the reported operating results or cash flow from operations or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies use. We post the information that is important to investors on the website under the Investors tab and you should review it regularly.
As normal, Venkat is going to kick off with some highlights from the quarter and a general overview of our operations. Christine will then talk through the -- Chris will talk through the South African operations, Ron will talk through the international portfolio, Graham through planning and exploration, Christine the financials and then Venkat will wrap up with some concluding remarks. Venkat?
Srinivasan Venkatakrishnan - CEO
Good morning, everyone. Apologies for my throat; it's completely passed out. It happened since yesterday, I don't know why, and talking since this morning hasn't helped either. But don't worry; it will improve during the course of the day. Firstly, thank you, Stuart, and good morning, everyone. We're very pleased to present another set of strong results from AngloGold Ashanti and a continued delivery of our strategy. As you know, as an industry we're going through pretty rough times currently, but the rougher it gets, the more our determination becomes to see through it and fight harder.
To recap on our strategy, which is around sustainable cash flow improvements, it's built on five pillars. Getting the foundation right, which is around safety, sustainability and people; getting the financial flexibility to manage through both the good and the bad times in the cycle; operational excellence, which is around production, cost and capital, and we use all-in sustaining cost and all-in cost as measures to calculate how we're doing in that regard; enhancing the portfolio quality as we have done over the last two, two and a half years; and finally, preserving our long-term optionality going into the future.
From AngloGold Ashanti what you see is a committed and reliable team. Our philosophy is very simple. We say what we are going to do; we do it; we then come back and say that we have done it. So what you see is really what you get.
Now if I can focus on the highlights. Another strong performance in terms of improvements across most metrics. Our free cash flow increased to $71m, and Christine will unpack that during the course of her presentation. The production levels in terms of guidance were well above guidance. We came in north of guidance; the guidance was between 960,000 to about 1m ounces. We came in at 1.007m, which is quite positive.
In terms of cash cost, there's a 14% reduction year on year at $718 an ounce that again compares favorably to our quarterly guidance. Our adjusted headline earnings came in at $26m and the key metric we monitor, which is around all-in sustaining cost, came in at $928 an ounce across the Group, which is a 12% improvement year on year.
Now unpacking the portfolio, the international division, which is around -- comprises of Continental Africa, comprises of Australia and Americas -- delivered a very strong performance. The normalized production went up by about 5% compared to the same quarter last year and the same quarter last year had the benefit of Obuasi's production which has since gone into a limited operating phase, and it also benefited from the production at Navachab.
But importantly, all-in sustaining cost came in at 16% better than the same quarter in the previous year and it shows a very strong performance from the international region. Ron has got a slide that unpacks it better in terms of where we are located in the cost curve.
The South African region, although it was lower year on year, the production improved by 9% as compared to the first quarter and Mponeng, the problem child in Q1, improved production by about 34%. And that accounted -- South Africa as a region accounted for about 26% of the Group's production.
From the balance sheet perspective, we completed the sale of Cripple Creek and Victor. The proceeds arrived post quarter-end and that has helped us on a pro forma basis to get our net debt to EBITDA to the range where we want, which is around 1.5 times through the cycle. And that we achieved without any dilution to our shareholders.
Turning onto safety, the quarter was going very well until the very last day where we had one fatality at Kopanang. It was a fall-of-ground fatality where we lost one of our colleagues. But the metrics improved quarter on quarter, whether you look at all-injury frequency rate, fatality injury frequency rate and lost-time injury frequency rate. Continental Africa again continued to deliver a spectacular performance when it comes to its safety statistics and in terms of South Africa, in West Wits TauTona for the first time has gone two years without a single fatality, and you know it's quite a complex mining area with a lot of seismicity. Moab Khotsong again achieved 2m fatality free shifts, again for the first time. And our focus continues on improving our safety performance across the Group.
Turning to the key metrics, the decline in production on a full -- including continuing and discontinued operations, the discontinued operations being CC&V, did fall along with the gold price, and that was largely due to the reduction in SA production year on year and not including the Navachab sale, and also Obuasi going into limited operating phase.
But notwithstanding these, our cost metrics improved on every count. The small swing you see in the corporate cost is purely because of reversal of some recharges to one of our joint venture mines, but on a year-to-date basis it's flat as compared to the previous year.
But our all-in sustaining cost and our all-in cost both improved by 12% as compared to the same time last year, and importantly, our adjusted EBITDA and free cash flow went up year on year by quite a considerable amount, despite the fall in gold price and despite the reduction in the units of production. This goes on to the key element of our strategy where we are focused on high margin ounces rather than chasing ounces for ounces' sake.
So with those introductory comments I would welcome Chris Sheppard to do his maiden presentation of AngloGold Ashanti South African region results.
Chris Sheppard - COO South Africa
Thank you, Venkat, and good morning, ladies and gentlemen. As you no doubt are aware, given the introductions from Stewart, I've officially taken over from Mike O'Hare as of June 1. It's important to note that there's been a very well-structured handover over the last two months because with the criticality of the South African region it's important that that does take place.
My immediate focus areas in the short term is -- clearly the first one is safety. Whether we embark from a journey to zero harm perspective or we address it from the debilitating effect that the Section 54 stoppages are having on our operations, either way it's important that we get a better handle on our safety in the immediate future.
We also need to improve our face length flexibility and by that I mean the face length mineable. In doing so, it will assist us in improving our volumes and increasing our mining flexibility.
The third and most important one is the delivery of Mponeng below 120 project.
Turning then if I may to the West Wits operations. TauTona delivered to expectation with a year-on-year improvement in cash costs of some 8%, and, as commented on by Venkat, achieved 2m fatality-free shifts during the period. We are seeing pleasing progress with the reef boring project with the latest Mark IV machine being imminently commissioned onsite and the current machines that are onsite operating are approaching the blueprint cycle times.
Furthermore, the ultra-high-strength backfill project has seen some pleasing development in the quarter under review with the achievement of the first 1,000 meter pumping being done successfully.
Turning to Mponeng, performance was impacted on two fronts. Firstly, the Section 54 stoppages in Quarter 1 that ended up impacting on the Quarter 2 performance, as well as stoppages that took place during Quarter 2. And then during the last three quarters we've executed a derisk plan which was a direct consequence of increased seismicity and ventilation constraints that impacted on production in the early part of this year. I'm pleased to say that this plan has addressed those issues and we're seeing a steady performance going forward.
Having said that, West Wits operations cash costs have improved quarter on quarter by some 19% with quarter-on-quarter production improving by some 22% for the West Wits operation.
Expanding then further on Mponeng on the next slide, Mponeng's broader challenges in essence relate to the delay in the delivery of the below 120 project on both 123 and 126 level. On an above 120 level, as indicated on my previous slide, production is constricted by the previously mentioned seismicity and ventilation issues, coupled with the extended lateral distances to the working places and coupled with less effective face times.
Turning to the 120 project, completion of the infrastructure and associated operational readiness is a clear current management focus. Secondly, the completion of significant secondary ground support is necessary to facilitate the full infrastructure commissioning to support the medium term ore reserve development program and the production ramp-up.
Fleet availability challenges have been addressed by the introduction of redundant fleet ex-Obuasi, the constructive engagement with the original equipment manufacturer to provide the requisite aftersales service, and then the improvement in the overall operating underground environment.
If we can turn to Vaal River, production was significantly impacted by safety-related stoppages. The Moab grade was adversely impacted by mining mix which resulted from higher grade production areas having to be reduced due to seismicity and production shifting to lower grade areas as a result. Great Noligwa Shaft has been placed on care and maintenance with all the logistics and equipment and men and material being delivered through the Moab Shaft system.
It must be noted that Kopanang is a lower grade operation that has to deliver volume in order to deliver the required margin.
Lastly, the consolidation of the Vaal River district continues and we have seen a pleasing $18m reduction in costs as a direct result if measured on a year-to-year basis.
If we can turn to ore reserve development on the next slide, the ore reserve development has been negatively impacted by safety stoppages and therefore it is a priority area for us. We will get a better safety performance once we've actually got our ore reserve development sorted out there and we will have increased mining flexibility.
I think you can see from our graphic that the ore reserve position is stable with one caveat, that we still need to get Mponeng to move up into the range of 20 to 24 months of ore (technical difficulty).
I think if you look at the bottom left-hand graphic you'll also notice on Kopanang that we are faced with pinching out ore reserves and we do have a challenge with the overall grade of the ore body. And hence, as I said, we need to get our volumes to the requisite levels to get the margin right.
Turning over the page to surface operations, if we look at the hard rock portion of surface sources with regard to production, increased volumes are being mined from the lower grade Kopanang marginal ore dump. We also have had challenges which have been rectified regarding the surface rail infrastructure and optimizing the throughput through that surface rail infrastructure by the introduction of road transportation which has provided for increased flexibility.
Lastly, the plant availability associated with the hard rock operations has been addressed and we have seen the requisite volumes now coming through. This ultimately led to the unit cost being -- increasing in Quarter 2, as indicated on the slide.
With respect to mine waste solutions, Quarter 2 volumes were impacted by the late commissioning of pumping facilities. Recovery challenges in the floatation circuits continue to receive focused management attention along with improved carbon management.
Lastly, I need to touch on the current wage negotiations. All the unions have rejected the final offer, that is the ZAR1,000 per month for entry level, with no added benefits I might add, which essentially gets entry level employees to the ZAR13,200 per month level in the third year of the agreement. NUM have registered a dispute with the CCMA for statutory mediation and we remain of the view that we have made a fair and generous offer which is sustainable for our business and also for the broader gold industry. And then a reminder that our offer requires all parties to accept the offer that's been made.
Importantly, we will continue to keep open communications at all times and it should be noted that with the rejection of our final offer that we have reverted to our previous firm offer of ZAR750 per month, which includes benefits. And that's for each of the three years of the agreement.
Thank you, ladies and gentlemen. I'll now hand over to Ron Largent, COO International. Ron, over to you.
Ron Largent - COO International
Thank you, Chris, and good morning to everybody. I guess I would like to provide some detail around Quarter 2 operating results for Continental Africa, Australia and Americas region, and also discuss some of the critical work streams that are underway to develop the optionality of this portfolio. As usual, I will not dig into the nitty-gritty of each operation as these details are contained within the quarterly report.
Before I get into each region outcome for Quarter 2, I'd like to reflect on some of the trends that we've seen in the international portfolio over the past two plus years since we embarked on our drive to improve efficiency and not only navigate a volatile low gold price environment but to prove that we could actually thrive in this environment. For the past two years I've asked you guys to watch or monitor the cost numbers on a quarterly basis and to draw your own conclusions around the effectiveness and sustainability of this cost work.
We set ourselves a challenging list of objectives in early 2013 for this work. We communicated during the quarterly results that the primary outcome was to remove $500m out of the operating cost within an 18-month period. On slide 17 I think you'll agree that this slide tells a compelling story around this team's ability to achieve the work around the operations and the relentless drive of the efficiencies. Now with more than two years of data to support us, we can illustrate not only the effectiveness but the sustainability of the process.
The first step change occurred in early 2013 when we took our all-in sustaining cost down to around $1,200 an ounce. We worked hard at capital allocation and also addressing the other cost elements including overhead at the operating level. And by the end of 2013 and for all of 2014 another step change was completed that produced all-in sustaining costs of around $1,000 an ounce.
Now the first two quarters of 2015 have ended with all-in costs -- all-in sustaining costs around $850 an ounce. So overall the international operations account for about 70% of the total AngloGold Ashanti production. We've continued to improve margins, even with the reduced gold price. The Group continues to work on efficiencies that will maintain and improve our outcomes into the future. I will reiterate that this work is all inclusive, including stay-in-business capital, direct operating costs and working capital.
But this effort isn't only around cost reduction. We're devoting significant effort into analyzing our mining methods, looking at our ore body options, process optimizations and scrutinizing procurement and contracts, looking for how to best fit our labor efficiencies. Everyone is aware of the challenges we face in the industry but we must not lose sight of the fact that we see significant opportunities in the portfolio.
Slide 18, the next slide is utilized internally in my group to create a competition within my management team and the peers in the industry. This data comes from publicly available information. As you can see, it's been a transformational move for the Company, especially for the portfolio of the international assets. We've moved from the top quartile in 2013 to the lower quartile in the first half of this year.
I guess the emphasis on this is to show that what we've been talking about for the past two and a half years, going through the process quarterly and then trying to summarize how we did -- how we've done compared to the gold price and secondarily what we've done with our industry peers. So the international operations has managed to remove about $300 per ounce off the AISC from a 2013 base.
So for the quarter the international Group performed well on all production metrics during the quarter. Production totaled 746,000 ounces compared to 713,000 in Quarter 2 2014 with an associated 12% reduction in all-in sustaining costs.
As for Continental Africa, production for Quarter 2 was 368,000 at a cash cost of $638 per ounce. Although the ounce production reduced on a year-on-year comparison, this reduction is due to the planned reductions at Obuasi and our anticipated grade and throughput reductions at Siguiri mine.
To highlight the Geita operations, it produced 132,000 ounces at a cash cost of $405 per ounce and this improvement can be attributed to some higher grades from the Nyankanga ore body and cost reduction through efficiency and planning with an improved throughput of the mill of 8% in the quarter. The Kibali mine, operated by Randgold, had another strong quarter, producing 75,000 attributable ounces with an associated cash cost of $547.
The Americas region, production for Quarter 2 was 239,000 ounces at $662 per ounce compared to $729 an ounce in Quarter 2 2014. The production in Brazil was impacted by timing of available stopes at Cuiaba mine which will be mined in Quarter 3, but cash costs were down 10% compared to Quarter 2 2014. In Cerro Vanguardia production was up 13% year-on-year comparison and costs slightly improved, even in the inflationary pressures in the country of Argentina.
In Australia production for Quarter 2 was 139,000 ounces at a cash cost of [$772] compared to $850 in Quarter 2 2014. I think it's critical that we watch the Sunrise Dam operation as the annualized underground ore production has increased to 2.75m tonnes per year. This is in line with the plans and it's critical as we turn this thing from an open pit to an underground operation. The site is working diligently on ore grade reconciliation as we change mining methods.
Tropicana produced 81,000 attributable ounces at $533 per ounce. This asset is at plan and at designed operating costs and production.
The last slide I want to touch on is just -- I won't go through I guess in totality but it's really priority work streams. It's individual assets in the portfolio and these are the things that are being completed, analyzed or implemented as we continue to push down the path to maximize each asset within the portfolio. I touched on Sunrise Dam, on the work around the underground mining efficiencies. Mining costs have been reduced over the past two years due to a change in the mining method from around $75 a tonne to a little bit below $40 a tonne. That's been a big key driver and we brought the tonnage way up. Now we've got to keep moving tonnage up as the mill has a capacity of 3.6m tonnes per annum and it all will be based on exploration drilling and converting the Vogue ore body into something mineable.
At Tropicana it's really around the regional exploration work to fulfill the life of mine requirements as we move through this operation. Siguiri, a lot of work on access into Area 1 which is a community and government affairs priority. The pre-feasibility has been completed on what we call the combination plant to process hard rock and the work continues on the ore bodies that we've talked about previously called Koun Koun and Saraya.
At Geita the underground contractor for the Star and Comet ore body will be mobilized by year-end and it will be our first movement into underground mining at the Geita operation. Iduapriem, got some exploration work going and we've confirmed the spent heap leach has a resource and now we just have to see how it fits into the overall processing plan.
Some excitement in Serra Grande in the northern part of Brazil with the development of the Inga ore body and the definition of the new high grade quartz Palmeiras Sul ore body to the south. Those are key to change in the overall grade as we move through -- if people are familiar with Serra Grande, it used to run at 10 plus grams; we're mining at 3 grams now and it was because we've lost what we call the Mina III ore body and these are sister ore bodies to the Mina III so the high grade quartz veins that we're developing now.
And last but not least, in Colombia we will continue to reduce holding cost while maintaining the optionality. We're completing the conceptual study at Quebradona and the Colosa pre-feasibility is in a phased approach so we can manage the level of spend. And in Gramalote the EIA has been submitted, comments received from Federal Government, and the pre-feasibility has been updated.
I just throw those out because I think these are key to the portfolio as we move forward and the work that has to be done.
So as you can see, there's tremendous options, opportunities and outcomes will be coming in the near future. So with that said, thank you and I'll now hand it over to Graham Ehm.
Graham Ehm - EVP Planning and Technical
Thank you, Ron. Today I'd like to provide an update on Kibali and Obuasi, share some of our thinking around business and mine planning and share some of the good results coming from exploration.
Firstly in regard to Kibali, I've commented previously that phase one of Kibali's development has been completed. There are two remaining elements and that's two hydropower stations and completion of the shaft that are ongoing. The Ambarau hydropower station is about 70% complete -- that's the photograph in the slide -- and will commence power generation in Quarter 3. Detailed design of the third power station at Azambi has just commenced and will be built during 2016.
The three hydro stations will have an installed capacity of 44 megawatts and generate power at a cost of a $0.015 per kilowatt hour. Compared with the cost of diesel in a remote place like Kibali, that's a considerable saving.
Shaft bottom at 760 meters that was reached on July 23, about three months ahead of schedule. Fit-out will take until Quarter 1 2016 and that will be followed by construction of the crusher chamber and the load level leading to ore hoisting in mid-2017.
At Obuasi the limited operating phase remains on track and producing gold from retreatment of tailings and from remnant stockpiles. The team is very focused and are doing well. They produced 14,000 ounces last quarter and 31,000 ounces year to date. Development of the decline is progressing according to plan and the feasibility study is also on track for completion by the year-end.
The study reached an interim milestone with the completion of the draft study this quarter. Even at today's spot price this is sufficiently encouraging to warrant us continuing to optimize the study and think through the execution planning and risk management with such a project. We have commenced engagement with the Government of Ghana on the key issues on which we would need to align for any future redevelopment of Obuasi.
I'll spend a little bit of time on this next chart. This chart illustrates AngloGold's portfolio in terms of annual production, all-in sustaining cost and reserve size shown in the bubbles. You can see that several of the operations are below $800 an ounce in all-in sustaining cost terms. A few are between $900 and $1,000 and some are still above $1,000.
In Ron's presentation you would have noted the results of the very good and effective work that has been done to improve the all-in sustaining costs over the last two years. Having made significant progress through cost reductions and a range of efficiency improvements, the next step is achieved through working the mine plans to achieve a low cost mine configuration.
Each mine has a unique set of characteristics, driven by the ore body capability, that drives the achievable range in production capacity and cost. Our aim is to move the all-in sustaining cost of all the operations to at least below $1,000 and preferably below $900. Every ounce produced needs a healthy margin at today's spot and should be resilient to a lower gold price.
To get the next tranche of cost reductions we need to look to the mine plans and we need to think outside the box. I'll use a few examples to share what we are doing. Before I move off this chart, you'll note on the chart where we think Obuasi will land in a similar position to the Geita operation.
In Tanzania, Geita's costs are very good and we certainly want to keep it that way. Cutbacks are expensive and if you are not careful can introduce high cost ounces into the production schedule. At Geita we have reworked the mine plan for the next six to seven years; we are considering an option to remove two of the higher cost cutbacks, cutbacks 9 and 10, and have redesigned cutback 8 to reduce short-term exposure to a lower gold price, retain a low all-in sustaining cost and improve medium-term cash flows.
With this approach, ore that was scheduled to be mined via cutback 9 and 10 would still be available in the future via underground methods or a cutback, should gold prices resume a higher price.
Turning to Sunrise Dam, we've been in operation at Sunrise Dam for almost two decades and transitioned to solely underground mining last year. You'll note that on the portfolio slide Sunrise Dam's costs are above our target. Driving costs down can be more challenging in an underground environment where there's often less flexibility.
The Sunrise Dam team have been successful in delivering a plan to progressively lift underground ore production through the application of intensive geological work which has utilized RC grade control drilling and bulk mining methods, complemented by improvements in mining productivity. They are currently running at the rate of 2.75m tonnes per annum and have reduced the ore mining costs substantially, as shown in the chart on the slide.
Over the next few years mining will progress into the Vogue area which is progressively deeper than the current ore bodies. To improve costs, the team is aiming to increase the production rate above 3m tonnes per annum and they're examining an incline conveyor system to reduce ore haulage costs.
At Tropicana we are continuing to look at ways to improve the site's performance and reduce costs. A grade streaming approach has been used in the first three years of the operation to leverage the payback period and therefore returns. As we approach 2017, the focus is on offsetting the gradual drop in grade by optimizing the performance of the process plant, targeted exploration and through mine design.
Exploration has been successful in demonstrating the down-dip continuity of the ore body at the contiguous Havana, Tropicana and Boston Shaker pits. Down-dip presents a challenge with the cost and scheduling of conventional cutbacks. We're studying an alternative low-cost approach by adapting the strip mining method that is commonly used in coal and sand mining.
This work is considering a smarter -- sorry, a starter pit, followed by strip-mining of a large cutback with the progressive backfilling of the mined-out areas. This approach -- the cutback could go as deep as 400 meters, and with this approach, it would extend the mine life, would reduce the stripping costs substantially due to the in-pit dumping and shorter haul distances. Peak cash flows are much lower compared with the traditional approach of a major cutback.
I'd like to make a few comments on brownfield exploration results. Firstly, at Geita, all the main ore bodies at Nyankanga, Geita Hill and at Star and Comet, continue down-dip. At Star and Comet, brownfield results on the high grade loads have been sufficiently encouraging to justify a small decline at the base of the pit and to enable underground exploration and trial mining. And this is expected to commence towards the end of this year.
This quarter, deeper drilling at Geita Hill returned encouraging intersections with grades of 16.5 meters at 1.45 grams and 3.7 meters at 31.8 meters.
Now I seem to have lost a page, so I'll have to wing it from here. If I go to Kibali, exploration this quarter has been at Gorumbwa. Gorumbwa is a small pit adjacent to the main KCD pit. It's an old pit that had been mined by the Belgians in the past. The results at Gorumbwa have been quite encouraging. And with 12 meters at 24 grams and 30 meters at 3.7 grams, and identified a new load.
At Pakaka is an area also not too far away from the existing pit and quite close to the airstrip. And further drilling there has presented a number of intercepts, with grades ranging from 4 grams to 11 grams.
Thanks very much. And with that, I'll pass on to Christine.
Christine Ramon - CFO
Thank you, Graham. And good morning, everyone. As you can see from another strong set of results, our second quarter's performance reflects sustained operational delivery again meeting market consensus views. These numbers reflect the strength of our portfolio and continue to differentiate AngloGold Ashanti from the majority of our peer group. The global macroeconomic environment remains volatile, with downside risk. The proceeds received from the sale of CC&V enhances our liquidity and reduces our net debt, providing the much-needed buffer for volatility.
I'll now talk through the detail of our second quarter performance, concluding on the third-quarter and full-year outlook.
Moving on, AngloGold Ashanti is uniquely positioned compared to our peers, due to our geographic diversification and our exposure to a basket of currencies. Our basket of currencies cushioned the drop in the US dollar gold price in 2015. The US dollar per ounce gold price dropped by approximately 8%, whilst on a production-weighted basis, AGA was positively impacted by 2%.
Weakening currencies in South Africa, Brazil, Argentina, and Australia cushioned the drop, the US dollar drop in the gold price. Given its production rating and the rand depreciation, South Africa comprises roughly one-third of the currency basket. This benefited our results, in addition to the positive impact of lower oil prices, which helped lower costs, particularly in Continental Africa and Australia.
Moving on to the quarterly financial and operating metrics. As we heard from Venkat, we've delivered ahead of guidance on our overall production and cost targets, despite the safety stoppages that affected our South African region, due to good performance from our international operations that Ron spoke to. Notwithstanding an 8% weaker gold price and an 8% lower production, we continued to deliver a strong cost performance, underpinned by a 12% reduction in all-in sustaining costs.
The $124 per ounce reduction in all-in sustaining costs was well supported by improved operational delivery, our cost optimization initiatives, whilst we saw significant benefit from weaker currencies and lower oil prices. In addition, while there has been a lag in sustaining capital compared to last year, due to the safety stoppages in South Africa, there has also been positive currency fix on capital expenditure.
We remain sensitive to the oil price and currencies and confirm our sensitivities at budgeted oil and exchange rate assumptions, which we always issue with a health warning. Just to recap, for every $10 per barrel change in the average Brent crude oil price, that will positively impact, so a weakening in the Brent crude oil price will positively impact our cash costs by approximately $8 an ounce, while a 1% weakening in our currency basket will positively impact cash cost by approximately $6 an ounce.
Adjusted EBITDA was solid at $391m for quarter two, despite the lower gold price and the lower ounces sold. We saw free cash flow before financing costs at $130m compared to last year's $98m. The big swing in free cash flow from last year was due to the positive impact of working capital movements as a result of a decrease in receivables resulting from tax recoveries in Continental Africa, and an increase in payables due to timing of expenditures.
Our net debt levels increased marginally to approximately just below $3.1b at the end of June compared to the levels in June 2014. However, when we compare the net debt levels against March 2015, it reduced by $74m and that resulted from the improved free cash flow generation. Well, actually, from free cash flow generation, because we were actually negative at the last quarter. And as Venkat alluded to, that following the proceeds of CC&V on August 3, it does reduce our net debt position on a pro forma basis to approximately $2.3b.
Moving on to the next slide, all-in sustaining costs shows steady improvement over the past five quarters, and as we've heard from both Ron, Chris and Graham, is that we remain focused on increasing margins over this period through a focus on cost discipline, portfolio improvements, and operational excellence, even in a depressed gold price environment.
We've reduced all-in costs by over $1,100 per ounce from the quarterly peak since 2012. And we've also reduced all-in sustaining costs again from the highest levels to where we are now by approximately $625 per ounce. This has largely been driven by the improvement in the cost performance in the international operations, which Ron spoke to earlier. The extent of this reduction relative to where we were and our ability to absorb pressures and sustain this over 10 quarters stands out in our peer group.
Moving on to further discuss cost performance, despite the overall lower production levels in the Group due to Obuasi's transition to the limited operations phase, and the disposal of Navachab as well as the safety-related stoppages in South Africa, we were able to reduce all-in sustaining costs per ounce by $124 per ounce in quarter two.
The reduction in the all-in sustaining costs comprised a number of different factors. There were efficiency improvements, as the slide reflects, of approximately $73 per ounce, and that did include oil price benefits of $25 per ounce. In addition to that, there were currency benefits of $87 per ounce, as well as lower inventory levels of $27 per ounce. These benefits were offset in part by inflation and volume and grade issues.
We also see that sustaining capital is down by $20 per ounce, and that mainly relates to Obuasi now being in limited operations, the regulatory safety stoppages in South Africa, as well as changes in the mine plan at Iduapriem. We also saw some currency benefits come through in the second quarter, and actually, we also alluded to that when we made our first quarter presentation.
So in terms of the outlook for the rest of the year, we are certainly expecting some catch up in sustaining CapEx in the coming quarters that follow, due to the timing of some expenditures, and increased stay in business CapEx at Geita in particular. And both Graham and Ron actually spoke to that.
However, we do expect to remain within the overall capital expenditure guidance range that we did put out. And within that, we are expecting to bank on some weakening currency impacts on CapEx. And those will be then banked as permanent savings. And our full year guidance on capital expenditure, as we've stated in in the announcement, has been reduced due to the CC&V disposal and the impact of that, or the reduced impact of that is about $100m.
Moving on to the year-on-year adjusted headline earning movements, we see that normalized adjusted headline earnings declined by $50m compared to last year, and that was mainly as a result of the lower ounces sold. As we can see from the slide, the positive currency effects more than compensated for the drop in the gold price and inflationary pressures.
Special operating items mainly relate to the Obuasi care and maintenance charges. In particular, we do refer to the higher amortization charge in the previous quarter, resulting due to deferred stripping at Geita, and I think the two factors to point out there, the one is that it does relate to a timing issue, so we do expect to see the impacts on the effect of timing in the year, and secondly, there has been a change in accounting due to the accounting standards. Previously these charges were amortized over the life of mine. However, now we have to accounts on the component accounting basis, and that does introduce more volatility into the income statement.
Moving on to the next slide, which deals with our financial flexibility, as we stated, our net debt to EBITDA ratio at the end of June was 1.94 times, and on a pro forma basis, reduces to 1.44 times following the receipt of the CC&V cash proceeds. So we've achieved our medium-term leveraged target of 1.5 times, which certainly compares very favorably to our peers, and positions the Company well to withstand the gold price volatility as well as production disruptions within reason.
So just to contextualize the potential impacts of a production disruption in the South African region, bear in mind that on an annualized basis, at least 72% of our EBITDA, and that's based on the 2014 actuals, is currently generated by our international operations. For Q2, approximately 84% of our EBITDA was generated from international operations. Hence the geographic diversification of our portfolio certainly continues to enhance our resilience to deal with this balance sheet risk.
As we can see from the slide, our liquidity of $2.5b has strengthened, and that was due to the $819.4m that we received in cash on the disposal of CC&V. In addition, we've increased our rand RCF facilities, by ZAR1.4b posted this quarter end to provide additional liquidity in the event of a production disruption in South Africa.
We certainly continue to maintain significant covenant headroom, and our debt maturity profile remains long dated with no material bond maturities until 2020. We certainly continue to see the redemption of the high yield bond as an opportunity, bearing in mind that the issuer's call can only be exercised from July 2016 onwards, at our discretion.
Cash is king in the current environment. We have ring-fenced the CC&V proceeds for debt reduction, and we will continue to focus on optimizing the financing costs in the Group. Our credit ratings remain unchanged at BAA3 rating with a negative outlook by Moody's, and a BB+ with a negative outlook by S&P.
So finally, moving on to the outlook. The slide talks to the outlook for quarter three and the full-year guidance for 2015, which has been rebased for CC&V. Overall, we are maintaining the cost guidance for the year, despite reducing the production outlook due to the CC&V disposal, which is effective from August 1, 2015.
On the quarter-three guidance, it does include one month of CC&V's production, and the range is 900,000 ounces to 950,000 ounces for Q3. The cost guidance remains -- is unchanged compared to Q2 at $770 to $820 per ounce, and that does take into account improved production in the SA region, given the recent safety stoppages that we saw in Q2, as well as higher winter power tariffs in South Africa and timing of expenditure.
Our annual production guidance has been revised to 3.8m ounces to 4.1m ounces for 2014. And as I said previously, it excludes CC&V from August 2015 onwards. However, the cash costs remain and the all-in sustaining cost guidance remain unchanged at $770 to $820 per ounce for cash costs and $1,000 to $1,050 per ounce for all-in sustaining costs. We've made no provision for power-related stoppages in South Africa and Ghana, or any unforeseen operational disruptions.
In terms of our capital guidance, it excludes CC&V from July 2015 onwards, and that has been reduced to $900m to $1b, and of that, 77% relates to sustaining CapEx.
In conclusion, we've consistently delivered on our production and cost targets, and we'll certainly look for improvements on our key drivers going forward. And on that positive note, I will now hand over to Venkat.
Srinivasan Venkatakrishnan - CEO
Thank you, Christine. In wrapping up, as the slide will show you, we have had a very good track record which we have built in terms of consistency and delivering against all of the production and our quarterly guidance when it comes to costs. We have either met them or we have beaten them quarter on quarter since the current team took charge in early 2013.
We are into our 10th consecutive quarter of consistent delivery, and that is despite numerous headwinds coming at us in the sector. However, as I reiterate, every quarter, mining is a long-term game, and we may miss a quarter here or there. But so far we have banked all of the quarters to date and the trends certainly look in the right direction.
The concluding slide, we are now into our 46th month of falling gold prices since they peaked in September 2011. We are into our fourth year of bear market. So at some stage, this is going to turn for the better. But having said that, we have not banked on the improvement in prices, but every step of the way we have been proactive but importantly, decisive, in each step in terms of delivery of our potential measures to mitigate the fall in the gold price. Overarching comments, our production and our cost initiatives will continue unabated. At the same time, we are uniquely positioned with favorable currency and oil prices, which will provide a natural cushion for lower gold prices in the event we actually test those.
And to recap, if you look at the actions to date, we have highlighted a number of actions on that slide, whether it's in terms of cost, whether in terms of mine planning and importantly, how we have moved proactively on the balance sheet and also retained a sharp cost focus through the entire period.
Now going forward, the areas we'd focus would be on South Africa to improve the safety performance so that we can recover on volume, improve our efforts of efficiencies across all of the portfolio, we look at rationalizing some of our longer-dated exploration and reef boring costs and as and when appropriate, will pull down the holding costs in terms of Columbia and look at the redevelopment schedule at Obuasi as well. And in one or two instances of short-term mine lives, we'll look at actually postponing some of the capital expenditure to harvest them for cash until the price has improved.
So with those concluding remarks, very happy to take questions.
Kane Slutzkin - Analyst
Good morning, it's Kane Slutzkin, UBS. Just for Chris, you guys mentioned, I don't know, about $18m of savings from consolidating. I remember about six months ago, the target was about 15% deficiency improvement. So maybe we can just talk in context of that $18m. How does that fit in with that 15% improvement in totality?
And then maybe just one for Venkat and Christine. Your cost structure certainly changed somewhat, and so obviously with free cash generation should be more robust over time. How do you store -- have you identified a gold price or a level of gold price or free cash flow, where you start thinking about dividends again? Just to hear your thoughts on that.
Srinivasan Venkatakrishnan - CEO
Okay. Firstly, if I can make an introductory comment before I pass it over to Chris, with Chris coming in, firstly, there has been ongoing work which is in progress, which is in terms of pulling down the cost with the consolidation in Vaal River. And as you will have seen, that consolidation, following that we have had certainly one fatality in terms of Kopanang.
So one of the briefs which I've given Chris is to look at it completely cold, as a newcomer, to say how best he actually repositions the South African region going out into the future. And he's identified two key areas, which is around safety, and also in terms of getting adequate volume and face length actually moving within the Company.
We are pleased that we have banked the savings in terms of the first round of restructure. We'll continue to look at it in terms of delivering additional savings. But we are not going to be boxed into a particular path which we have painted without looking at alternative other moving parts. Chris?
Chris Sheppard - COO South Africa
I think, just to verify that that $18m number really consists of a labor reduction, labor cost reductions, there is a key element there of exchange rate that factors in there positively. And in there obviously are the requisite efficiency improvements that come around with the restructuring. I can't say that the restructuring to quarter one mine district instead of three different mines has taken effect. And I think there's still -- not I think, there is still room for improvement going forward.
Srinivasan Venkatakrishnan - CEO
Okay, if I could pick up the second question here. Really, in terms of any targets around free cash flow, gold price, etc., we don't put out targets. And we have seen companies put out gold price-related dividends and get into trouble subsequently, etc. Our approach is as stated, in terms of dividend policy, it's a fluid dividend policy. We look at cash generation from within the business when we make the recommendation to the Board. Ultimately, it's the Board's call, but it's a prioritization at getting the balance right between the extent of debt, because it comes at a high cost, and that's one way of actually freeing up cash flow to the shareholders.
The second area is around near-term and longer-term growth but at the same time, recognition that our shareholders have not had a dividend for a fair while. So certainly there's a clear desire to move back into dividend territory, but it's obviously a function of the gold price, and also in terms of capital expenditure.
Stewart Bailey - SVP IR
Patrick?
Patrick Mann - Analyst
Hi, good morning. It's Patrick Mann from Deutsche Bank. Two questions, please. Could you just touch a little bit more on the kind of liquidity management strategies? So you've now got $2.5b to deploy, obviously there's short term uncertainty ahead with the wage negotiations with the gold price volatility. You mention is that the CC&V proceeds are ring-fenced. But you've obviously also got Obuasi, Colombia, in the portfolio, also the high cost debt is an opportunity. Just how are you ranking and thinking about these opportunities?
And then the second one just relates to wage negotiations. The offer that was made conditional that all the unions accept. Are you seeing the unions kind of acknowledging that they're going to have to sign a joint deal? Or is it still difficult to get them on the same page? Thank you very much.
Srinivasan Venkatakrishnan - CEO
Let me pick up the second question, and then Christine can come in on the first one in terms of the liquidity question you raised. Firstly, with regard to the approach to the wage negotiations, Patrick, the way we approach the wage negotiations obviously was different than the previous occasions. We went in by saying we don't have the correct approach in terms of positional bargaining, starting with below-inflation increases rising one step at a time doesn't actually work.
We took as the four companies involved at that stage, which is ourselves, Harmony, Sibanye and Pan-African view, that to sustain the industry in the longer term, it requires an economic and social compact. We were willing to make the moves and we also said that there is a trade-off here in terms of pain and gain sharing.
So the entry level increases we offered there around 13% in our case, and I think it was about 11% in Sibanye's case, or lower, in case of Harmony. And what we also offered, after opening up our financial models, was a 3.5% effective, complete free cash flow gain share.
And we did say that it was essential that we have to have all of the four unions actually accepting the wage offer. And it's quite relevant, given the fact that we want stability going out over the three-year wage negotiation period. So that hasn't changed. So as far as we are concerned, the offer out there on the table currently, which is the offer of ZAR750 rolled into basics, certainly requires acceptance on the part of all of the unions.
Christine Ramon - CFO
Okay. And as regard the question on the liquidity management, I think, just bear in mind that the $2.5b really relates to un-drawn facilities as well as the cash on hand. And I think importantly is that the cash does provide us the liquidity that we need in the current environment. The environment is hugely volatile. We also look at managing the balance sheet by testing for downside risks, which include production disruptions as well as a drop in the gold price. We've made the point that we do have a natural hedge in terms of the currency exposure. We're also -- in low gold price environment, you do see low inflation, and clearly lower oil prices, which actually positively benefit us.
I would certainly see us looking at how we can optimize the interest bill in the Group. What we have done post-quarter end is also in terms of managing counterparty risks, is we've actually repaid the US dollar RCF facilities. And we also look at other ways of also managing, or certainly optimizing interest costs in the Group -- as you're aware, the US dollar are CF drawn facility is approximately about $200m -- at the quarter end. And we've repaid that.
I think quite importantly is it's important to maintain, so even though we've repaid the facilities, we've still got the access to that, so it doesn't actually affect the overall liquidity situation in the Group.
I would certainly see Obuasi and Columbia in go-forward decisions linked to JVs. And clearly, that will address the funding strategy going forward. And as Venkat spoke to you, it is about looking at how we can actually minimize spend, in particular in Colombia going forward. So I would not see the liquidity that we actually currently have being prejudiced because of those strategies.
Stewart Bailey - SVP IR
We'll start with Derryn and then come back.
Derryn Maade - Analyst
Good morning, everyone. It's Derryn Maade from HSBC. Just two quick questions. First one is, really, over the last two quarters we've heard a lot of more talk, not only from yourselves, but within the industry, of safety stoppages and the impact that that's having on the businesses across South Africa. Maybe you could just update us on why you think this is now ramping up again and the relationship with the TM are, and how that stands, please?
And then the second one is just related to the self-help measures, the asset sales side. I note that the Sadiola and Yatela talks have been suspended. Can you just update us on that as a policy for the Company? What's your thinking on -- how do you see these progress? Do you still need to sell further assets after ceasing the -- what's the current thinking about that, please?
Srinivasan Venkatakrishnan - CEO
Okay. Let's me pick up both those questions, Derryn. Firstly, around safety stoppages. I think, yes, there has been an increase in the debate here, but also what we want to make very clear is that safety remains our first value. If a mine is actually unsafe, we will proactively stop that part of the mine until we can actually get comfort around safety.
And I think the comments you have seen, as you referred to from other industry players as well, firstly, there is no deterioration in terms of the relationship with the DMR in that regard. We talk to the DMR, Chris and myself speak to the Chief Inspector and Principal Inspectors on a regular basis, even when there is no fatality, on a quarterly basis. We report back to the CIM, the PI, in terms of what improvements we have done within the business, what incidents we have had, not just in relation to safety, but even in terms of health, environment, etc.
The real issue in the debates around the safety-related stoppages comes around what happens in the event that there is a non-compliance issue or when there is a safety issue? It's like having an accident or roadworks in one part of the motorway. There are two approaches you can take. You can shut the entire motorway down, or you can ring-fence the area where there is a problem and address that particular problem.
So what you're hearing the industry say is effectively identify the area where there is a problem and let's deal with it, rather than taking one approach across the entire industry. We had a very successful incident similar to that at Mponeng, where we worked with the DMR, and they identified and ring-fenced the stoppage to that particular area of the mine. So there are successes in that regard as well.
The second area which comes to in respect of your asset sales ones, if you recall, we actually said, our approach to generating free cash flow and in terms of balance sheet was twofold. It is around joint ventures in respect of Obuasi and Columbia. They are two different type of projects. One is in its early stages, other was an operating mine. And there, the focus is really on getting cash in for our 50% share. So that hasn't changed.
The main balance sheet deleveraging strategy and the asset sale was around CC&V. We have delivered on that one, so we don't need any asset sales to basically address the balance sheet. So that is done.
With regard to Sadiola and Yatela, we saw an opportunity to effectively rationalize our capital allocation. Accordingly, where we could either put the money into expanding Sadiola sulfites, or there was a joint venture partner, who potentially expressed an interest to buy our share. So the negotiations were advanced, but unfortunately, at that point the gold price did fall, and Iamgold re-looked at their capital plans, but not in isolation.
What both joint venture partners saw is that there is potential to improve the oxide mining going into 2016 and beyond. That also caused a change in heart. So the approach we have taken now is let's look at exploiting sulfites in due course. We can come back and look at it from a different model, but let's focus on carrying out mining the oxides in the near term. So that's been the change, that's all.
Derryn Maade - Analyst
Thanks so much.
Stewart Bailey - SVP IR
And the final question from here in the third row, please. Sir?
Francis Daniels - Analyst
Francis Daniels, Anibok Investment. With the change in the oil price for your guidance and the change in currencies, why is the total cash cost and all-in sustaining cost guidance unchanged? What are the offsetting increases which have resulted in your deciding to keep the guidance unchanged? Thank you.
Stewart Bailey - SVP IR
Thank you.
Christine Ramon - CFO
Well, I think what's quite important is the assumptions that we actually make on exchange rates and commodity prices for the rest of the year. So we do actually -- we're a conservative management team, so we do factor in a buffer for that. Because clearly, we don't know, we are still halfway through the year, and there's another six months to go.
But what's this also does take into account is the lag that we actually see in our capital expenditure as well, which does in particular, fit all-in sustaining costs on the CapEx expenditure. And I've actually said to you that we're still lagging the spend there, and we are expecting quite a big catch up in the second half of the year. So, in short, that's the answer.
Stewart Bailey - SVP IR
All right, I think we'll take a final one from Adrian and then we'll call it.
Adrian Hammond - Analyst
Adrian Hammond of Standard Bank. Just a quick one for Chris, please. Just on -- as a new Head of South African operations, could you just -- apart from safety, and your key concerns and opportunities following the few months that you've been with AngloGold, and with that, could you answer when you expect production from Phase II at Mponeng, and how do you plan on achieving higher volumes at Kopanang in the future, please? Thanks.
Chris Sheppard - COO South Africa
Right, I think, Adrian, first point is, as my introductory remarks went around the safety piece for the reasons that I gave, that's a given. I think the key issue is volume. And we're going to get volume right by improving on not only ore reserve development, but also the equipped face length, as such. Because that's going to bring the necessary flexibility, it'll give us a better, consistent outcome or performance going forward. Those are the two key things at this point in time, which occupy my mind most.
I think as I also said to you, Mponeng below 120 is key to us. I also mentioned the Phase I project. We obviously are busy with the ore reserve development and the operational readiness around the infrastructure of that project. And at this stage, it's on track.
Adrian Hammond - Analyst
Phase II production, when do you expect that?
Chris Sheppard - COO South Africa
Bit early to say at this point in time, with the events taking place within the industry and with the gold price where it's at, I don't want to make any forward-looking statements in that regard. But I think one has to be conservative about that medium-term project at this stage. So I think we would rather get back to you, probably in the New Year in that regard.
Adrian Hammond - Analyst
Thanks.
Stewart Bailey - SVP IR
Thanks very much. Venkat?
Srinivasan Venkatakrishnan - CEO
Thank you very much, ladies and gentlemen. Once again, apologies for my throat, but it's not happened for over 10 years. So I must have had something on Sunday. But thank you once again, and we hope to deliver a good quarter going into the September quarter results. Thank you.
Stewart Bailey - SVP IR
Thank you.