Stewart Bailey - SVP IR
Morning, ladies and gentlemen, and welcome to AngloGold Ashanti's presentation of the results for the first quarter through March 30. (Conference Instructions)
Certain statements contained in this document other than statements of historical fact including without limitation those concerning the economic outlook for the gold mining industry; expectations regarding gold prices, production cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results; return on equity; productivity improvements; growth prospects and outlook of AngloGold Ashanti's operations individually or in their aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of AngloGold Ashanti's exploration and production projects and completion of acquisitions, dispositions or joint venture transactions; our liquidity and capital resources and capital expenditures and the outcome and consequence of any potential or pending litigation or regulatory proceedings or environmental health and safety issues are forward-looking statements regarding our operations, economic performance and financial condition.
These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to differ materially from the anticipated results, performance or achievements expressed or implied in these forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in forward-looking statements as a result of amongst other factors changes in economic, social and political and market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings and business and operational risk management. For a discussion of these factors refer to our annual reports on Form 20-F filed with the US SEC. These factors are not necessarily all of the important factors that could cause our actual results to differ from those expressed in forward-looking statements, other unknown or unpredictable factors that could have material adverse effects on future results. Consequently, you are cautioned not to place undue reliance on forward-looking statements.
We undertake no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by these statements.
This communication may contain certain non-GAAP financial measures. We use these measures and ratios in managing our business. Non-GAAP measures should be viewed in addition to and not as an alternative for the reported operating results or cash flow from operations or any other measures of performance prepared in accordance with IFRS.
In addition, the presentation of these measures may not be comparable to similarly titled measures other companies may use. We post information important to investors on the main page of our website at AngloGoldAshanti.com and you should refer to that.
As usual today we'll have a full lineup. Venkat will offer some introductory remarks; Mike O'Hare will then talk to the performance of the South African region followed by Ron Largent talking to our international portfolio. Graham Ehm will give an update on key projects and exploration and then Christine will give detail on our earnings performance for the quarter. Venkat will then sum up with some concluding remarks. Venkat?
Srinivasan Ventakrishnan - CEO
Thank you, Stewart. Good morning, ladies and gentlemen. It's now around 43 months since the gold price started to fall from its peak in September 2011 and we forget this quite easily. So we are into 43 months of grind mode. And in this challenging backdrop we are pleased to report another strong set of results which are a good set of results. But having said that, we still see scope for further improvement which is encouraging.
Twenty-four months ago when I stood before you and we articulated our strategy which is built on five simple building blocks to drive sustainable cash flow improvement and returns. To recap, there were five pillars, the foundation which is around safety, people and sustainability; the second around ensuring that we have financial flexibility; the third is to take a total relook at our cost base across all of the metrics and optimize them; the fourth is to take a cold look at the portfolio to see how we develop a more focused and profitable portfolio; and finally, in doing this to ensure that we preserve our long-term optionality.
So with those introductory comments, starting with the first-quarter highlights. We had a strong Group performance during the first quarter which was underpinned once again by a stellar performance from our international mines. And as we had previously flagged when we issued our Q1 2015 outlook in February when we announced our 2014 results, South Africa's performance was negatively impacted by safety stoppages. And more of that later. Overall, a strong performance with clear benefits of portfolio diversification with our international operations knocking the ball out of the park. Production of 969,000 ounces exceeded our guided range of 900,000 to 940,000 ounces. Total cash cost at $744 an ounce were down 3% year on year; all-in sustaining costs at $926 an ounce were down 7% year on year and all-in cost down to $1,026 an ounce, down 8% as well.
Our adjusted headline earnings of $0.09 per share is ahead of consensus and our balance sheet deleveraging strategy is progressing to plan, and in that regard you've seen the disclosures we have made in the quarterly. We have had binding bids received in respect of Cripple Creek and Victor, both in terms of a joint venture and a sale option. And for the year in question we are maintaining our full-year cost and production guidance which Christine will cover with the usual health warning included in there.
Turning to safety, unfortunately we failed to improve our fatality record from last year after we recorded two fatalities at Mponeng and one in our mine in Brazil. This comes after having recorded over seven consecutive months across the Group without a single fatality last year, which shows what is possible when we get safety right.
Having said that, there were some significant achievements which were positive during the quarter. Notably, we achieved record first quarter all-injury frequency rate and lost-time injury frequency rate as compared even to the same period last year, and two of our mines, Siguiri and Iduapriem, completed the quarter with zero injuries.
What is important to bear in mind is that the improvement in our all-injury frequency rate is even better than it appears because we have significantly fewer people and contractors in the business than in previous years, which means we have to work harder to ensure that the rate keeps improving.
Mponeng in particular and South Africa in general are our core focus areas for us given the safety issues we have seen in the last six months. Mike will cover the mitigation steps we have taken to date and we will continue to take the appropriate steps needed in respect of this long-life asset.
Turning next to our quarterly performance as compared to the same quarter previous year, Christine will cover the financial metrics in her presentation. At a high level gold price dropped by about 6% or $73 an ounce. The Group production when you normalize it for Obuasi and Navachab was down 3%, impacted largely by the South African safety stoppages. Our international operations on a normalized basis improved production by 2%.
All of our cost metrics, whether you look at cash cost, whether you look at expenditures or all-in sustaining cost or all-in cost, improved by between 3% to 12% depending on the metric you see. And that has minimized the gold price impact.
So with those introductory comments I will now call upon Mike O'Hare to cover the South African operations.
Mike O'Hare - COO South Africa
Thank you, Venkat, and good morning to everybody. As Venkat has said, the region had a tough quarter to say the least. The production was down 18%, costs were up 12% and the reasons for the production slippage, beyond the normal Christmas start-up, really can be found if one looks at the safety stoppages caused at Mponeng as a result of the two fatalities we had during the quarter. I'll cover that in a little bit more detail later.
We also had stoppages at Moab Khotsong. Although we didn't have any fatalities there, we had a few series injuries which caused an unusually high number of safety stoppages. We were impacted by Eskom, not only as part of the load shedding but we experienced a fire at one of the substations which took two days for Eskom to fix. And we also had a number of cable theft issues which impacted on our production at Mine Waste Solutions.
The work reorganization at Vaal River continues and it's nice to see that the team are now bringing the execution plan -- in terms of the rands we think we can get by the rationalization -- into focus. And we should see that start to flow through into the cost numbers in the Vaal River area in particular.
The work at Mine Waste Solutions to firstly reduce their costs continues and they now manage to operate at an all-in sustaining cost of $1,000 per ounce and are working hard to getting a number that's in three digits rather than four. The chemistry work to improve our uranium recoveries continues and we should see uranium production start to ramp up now significantly over the next three months. We are producing uranium but not yet at the levels we planned.
If we move to Mponeng, talking about having safety as your first value and then having four fatalities after having had really record-breaking runs in South Africa, bearing in mind we mine the deepest mines in the world, is really hard for all of us and particularly the team. We spent a lot of time at Mponeng and what we really set out to do was to say: is there anything we're doing at Mponeng if we benchmark ourselves across our other mines that we could do better in order to reduce the risk?
And when we looked at the detail we found that firstly we're looking at the fall-of-ground incidents and we could improve the risk profile, firstly by moving support closer to the face; in other words the backfill support is closer to the face which means the working area where the falls of ground happen is better supported. We're now installing vaults in all of our working places and we've also brought our temporary support closer to the face as well. So overall we've increased the density of the support. And this work has been completed.
We then turned our attention to the seismic risk. Now every deep level mine has a seismic risk. We looked at where we were mining and in particular we looked at the structures we're mining next to because seismicity generally follows some pre-existing geological structure. And the particular one that we normally have high seismicity and injuries associated with that over a long history at Mponeng was being mined close to -- that geological area was being mined and we decided to reduce the amount of volume that we're mining around that dike fault area.
The other areas of ground that we visited are areas that have particularly poor ground conditions and unfortunately it's in the western part of the mine where our highest grade is. We've had to change the mining angle so we normally would mine breast. A number of those panels have now been turned to updip mining in order to make the ground conditions better and hence safer.
The inevitable effect of this work on the planning and the mine design will be that there will be an adverse effect on our production. You can see that coming through this quarter and you could see it last quarter as we had the stoppages and our reaction to those stoppages. We will of course do all in our power to ensure that we ameliorate that effect but we really can't do that by compromising our first value.
The project, Below 120, which brings in an additional two levels of mining for Mponeng, commissioned a chairlift from 120 to 123 which means we can now transport people on a chairlift from 120 to 126 level. In fact, Venkat came and rode that chairlift and I think was pretty impressed with the work we're doing.
This helps us open the ore body and it's pleasing to report that for the first time we went through the milestone of 300 meters in a month of mechanized track-down development on 123 level. The trick now is to replicate that on 126 level.
The electric monorail was commissioned during the quarter and the commissioning of the remaining outstanding infrastructure which is silos and a degritting dam has been impacted by the stoppages but we will look for ways to mitigate the impact on the schedule slippage that we have found.
Turning to technology, where are we now? We have now five machines boring at three different mines. During the quarter we drilled 31 holes and it's pleasing that we're managing to drill in three of the four areas we identified at the outset in 2012. We're now drilling in the shaft pillars, which is our medium-width high-grade areas. We're also drilling in our narrow lower-grade reefs and we're drilling in the technically challenging very steep reefs which we've left a number of those high-grade reefs behind at Moab Khotsong.
Four new machines are busy being constructed as we speak which should see that the rock boring fleet size and therefore its production should almost double by the time we hit the end of Q3.
The work to improve the productivity of those machines to get each machine to drill a hole in 72 hours, together with ensuring that each machine drills every day of the year, is ongoing. Two new backfill plants are nearing completion of construction for installation in Q2, Q3 and the new multipurpose -- purpose-built rather RC rig is under construction for deployment underground in Q4 as we speak.
With that I'd like to hand over to Ron. Thank you.
Ron Largent - COO International
Thank you, Mike, and good morning. I will discuss Quarter 1 2015 operating results for Continental Africa, Australia and Americas regions. I will not discuss each asset individually as the results are within the documents of the quarterly report. Cost management continues to be the focus of the international operating group. The primary areas of focus are around direct operating costs, stay-in-business capital and working capital.
Additional work that has potential to impact mine site expenditure and cost structures is around detailed mine planning analysis, mine method work and process optimization. As for the quarter, the international group performed well on the majority of all production-related metrics in Quarter 1. Production totaled 730,000 ounces compared to 713,000 ounces in Quarter 1 2014 with an associated 12% reduction in all-in sustainable cost that was dropping to $851 per ounce compared to $972 in Quarter 1 2014.
This reduction in cost can be summarized in three general categories, the first one being the weakening of exchange rates and fuel pricing, second being optimization of mining methods and designs and the third in labor and consumable efficiencies and pricing.
The Continental Africa region production for Quarter 1 was 351,000 ounces at a cash cost of $714 an ounce compared to a cash cost of $808 in Quarter 1 2014. Although the ounce production reduced on a year-on-year comparison, this reduction was primarily due to planned plant shutdowns at Iduapriem and Siguiri for maintenance work, detailed and finished on time and on schedule.
Geita produced 118,000 ounces at a cash cost of $579. I think we need to take note of this as this has been where a lot of work has been done at the Tanzanian asset to drive efficiencies through planning and also cost controls. This improvement has a certain -- can certainly be attributed to also some higher grades from the planning sequence at the Nyankanga ore body.
The Kibali mine, operated by Randgold, had a very good Quarter 1 producing 73,000 attributable ounces with cash costs of $630 an ounce.
The Americas region production for Quarter 1 was 236,000 at a cash cost of $665 an ounce, just slightly better than the cash cost of Quarter 1 2014.
The CC&V mill has been commissioned and in the ramp-up -- and in ramp-up stage. The current throughput is at about 70% of nameplate for this plant. Graham will give some additional details on the project.
Ounce production from Brazil was up 5% when comparing to Quarter 1 2014 with a strong performance from the Cuiaba mine at 130,000 ounces. The Cerro Vanguardia mine in Argentina produced 65,000 ounces, which is a 12% improvement year on year. Costs in Argentina were slightly improved, primarily due to the inflationary pressures in that country which continues to be a challenge for us to manage.
In Australia, production for Quarter 1 was 143,000 ounces at a cash cost of $679 compared to 155,000 ounces in Quarter 1 2014. At Sunrise, the underground ore production increased by 22% compared to the same quarter in 2014. This mine is scheduled to mine 2.8m ore tonnes in 2015, an increase of 15% compared to 2014. The reason I bring this up is that this mine tonnage movement is critical for establishing the future mine plan and the capability of this asset as we change it into a 100% underground operation.
At Tropicana, the production of 86,000 attributable ounces at $422 cash cost is at an above-design throughput through the mill and at the designed -- or if you want to go back to the bankable feasibility study -- cost assumptions. So it's working very well at Tropicana.
The next slide I'd like to just briefly touch on a couple of priority brownfield work streams that are fundamental in our planning process for improvements to releasing value for our set of international assets. The first one I'll briefly touch on is a life-of-mine extension at the Siguiri mine that includes a mill flow sheet modification to allow for processing of our hard rock reserve. This project is in final feasibility stage and in general or basically includes a crusher installation and grinding circuit additions and modifications.
The second project is at the Geita mine. The shallow underground operation is in the final stages of design and initial implementation is planned late in 2015. And this basically is the Star & Comet pit; remaining higher grade resources will be extracted from underground mining methods. The real plan there is to slightly improve the average feed grade to the mill and to of course take advantage of that higher grade resource that we can't get from an open pit mining method.
The third, and it reflects the little pictorial on the left of the slide there, is the decline from ore body 4 to the Inga deposit at the Serra Grande mine in Northern Brazil. And we're approximately 50% of the way across from what we call ore body 4 to enter into the Inga ore body. This again will -- the outcome will be to improve the grade slightly of the mill feed.
But I'd like to make comment that this is the work -- this implementation is the reasoning we purchased the 50% of this asset a few years back was for these higher grade -- our impression of the probability of finding these higher grade structures. So that's pretty exciting as far as it will really change the outcome at the Serra Grande mine.
And fourth, at Sunrise Dam, a feasibility study is being executed that extends the mine life by elevated underground production from the lower ore bodies, being Vogue and GQ. If and when we determine this to be economically sound, ore transportation will be by conveyor system, we think, instead of trucking from the deeper areas of these ore bodies. It will -- between putting in a more systematic and efficient haulage system and proving that we can mine at around 3m tonnes a year there will continue the life at Sunrise Dam -- will give it a long life if all those become economically positive.
So to summarize the international assets, I think the work around cost management, the consistent delivery of plans, the asset planning and scheduling and the continued focus on business improvement has produced an outcome that we've been able to reduce our all-in sustaining cash cost from around $1,200 in 2013 to right around $1,000 in 2014 and to have an outcome of $850 an ounce in first quarter 2015. Thank you. Now I'll give it to Graham.
Graham Ehm - EVP Planning and Technical
Thanks, Ron. Now this morning I'd like to cover Obuasi, Kibali, Cripple Creek and Victor and comment on exploration at Tropicana. Now having shut down the main operation at the end of last year at Obuasi, we've just completed our first full quarter in the limited operating phase. Retreatment of the Diawuoso tailings and some remnant stockpile mining has gone better than plan, producing 18,000 ounces for the quarter.
Development of the Obuasi Deeps Decline and grade control drilling on block 8 is continuing and is going to plan. We will complete the draft feasibility study as planned this quarter but we'll continue to optimize this during the second half of the year.
In the second half of the year, we will engage with key stakeholders and in particular the Ghana Minerals Commission and the EPA in regard to the approach to Obuasi's redevelopment to obtain requisite approvals. We will also start the detailed project execution planning and operational readiness planning. Now this will be a critical part of successfully redeveloping Obuasi as you are developing essentially a brownfields mine, one that has shut down and one that will be reconfigured. Doing that work will be quite complex so the work associated with execution planning and ops readiness planning will be critical.
To give you an idea of the way that Obuasi is developing, the redevelopment will be in the southern end of the mine. The ODD decline has reached the top of block 8 lower and the plan is that this decline will progressively deepen over time, accessing blocks 8, 9, 10 and 11. Now three main mining methods will be applied, including transverse and longitudinal long hole stoping in the wide and more consistent ore bodies, and underhand drift and fill in the narrower, more variable but higher-grade lodes.
Mining grades will dominantly be 6,000 tonnes per day in the long hole areas and about 4,500 tonnes a day in the narrower areas. While the plan focuses on the reserves, there's considerable upside within the inferred resource and areas that have had little drilling. You would have noted that in -- at the end of the year, that reserves at Obuasi were reduced as a result of the change in the mine plan. But I expect to see on the basis of brownfields infill drilling and modified mining methods that we'll recover quite a bit of the reserve that was lost last year.
We will use as much of the existing infrastructure as possible, including the KRS shaft which will be refurbished to a hoisting capacity of 6,000 tonnes a day, and conversion of the KMS shaft to a ventilation shaft.
Now moving on to Kibali. Kibali had a good production quarter and production is stabilizing at 6,000 ounces per annum. Costs were up slightly quarter on quarter with higher mining rates and slightly lower production. Both the open pit and underground mines are producing well. Resource reconciliations last quarter were slightly better in the open pit. Underground reconciliations are good in terms of grade and tonnes, with some spatial variation, as you'd expect.
Work is progressing on improving plant run time and stabilizing mill operations and therefore optimizing recovery.
The phase 2 capital program is progressing to plan. The paste fill plant has been dry commissioned and will come on stream in Quarter 2. The second hydropower station at Ambarau will come on stream in the fourth quarter, adding 10 megawatts of hydropower.
This diagram shows you the extent of development of the underground mine through the decline, through the twin decline system. Decline development continues on plan and ramp-up of underground production is on plan. Three stopes have been mined to date, 138,000 tonnes mined for the quarter. So the objective of ramping to about 650,000 tonnes in 2015 is on track.
In regard to the vertical shaft, shaft development continues to go quite well and is ahead of plan. The focus this quarter has been on lateral development to the crusher chamber and the reaming of a 4-meter vent rise down to that level. When the vent rise is through this quarter deepening of the shaft to 760 meters will resume, followed by fit-out of the shaft.
This work is going to take us through 'til 2017; but when the shaft comes into production in 2018, as a result of an increase in grade we'll see a kick in production at Kibali from the 600,000 level to the 700,000 to 800,000 ounces per annum level.
In addition to that production profile, exploration at Kibali is quite exciting. If we could move to the next slide. Exploration is focused on the KZ structure. There's about a 20 kilometer strike length on the structure. So far we have mined one small satellite pit at Mofu, a small oxide pit, and currently in progress is the Mango Hill deposit. We're quite excited about the geological structure; the geological team have done a particularly good job in understanding the controls and are now identifying and prioritizing drill targets across this 20 kilometer strike length.
Now moving to Cripple Creek. The mine life extension project will extend Cripple Creek's mine life from 2016 through to 2025. And average gold production will increase from the 250,000 to 280,000 ounce per annum level to 370,000 ounces per annum. The Emily 2 project adds a 2m tonne per annum mill to treat the higher grade moderately refractory ore within the ore body and a Valley Leach facility in Squaw Gulch with a dedicated absorption-desorption and recovery plant.
Average cash costs will reduce to around $800 to $850. Capital costs are on track and are expected to come in within budget of $585m of which $366m has been spent to date.
Commissioning on the mill was completed in the first quarter and handed over to operations, as Ron commented. First gold production, first gold pour was made last quarter and ramp-up to full production is in progress.
Construction of the ADR facility started in April and is expected to be commissioned during Quarter 4 of 2016. The VLF construction is also on schedule and is on time.
Turning to Tropicana. This quarter it's worthwhile commenting on the exploration progress at Tropicana. In addition to brownfields exploration on the mine lease, you'd be aware that we've been working regionally. There's a lot of anomalies in the Tropicana area and this quarter we're seeing success at Madras, 25 kilometers south of Tropicana. The regional geological work has built up a detailed picture of the regional geology and has focused the work on the favorable areas of Tropicana, Madras and Tumbleweed domains, shown in the dashes on this particular diagram, and the Sanpan domain a little bit further to the south.
But specifically in regard to Madras, drilling has returned significant results in the southern area, including 15 meters at 5 grams, 17 at 4.2 and 25 at 2.5. While there's still quite a lot of work to be done, Madras is emerging as a mineralized area over a strike length of approximately 4 kilometers and being close to Tropicana could feature well in terms of its future mine plan.
Thanks and with that I'll pass on to Christine.
Christine Ramon - CFO
Thank you, Graham, and good morning, everyone. As you can see from another strong set of results, our first quarter's performance reflects sustained operational delivery, again beating market consensus views. These numbers reflect the strength of our portfolio and clearly differentiate AngloGold Ashanti from the majority of our peer group.
As you'll all be aware, the global macroeconomic environment remains volatile, with downside risk. Hence, our continued focus on strengthening the balance sheet in the medium term in order to improve free cash flow generation and create a buffer for volatility.
I'll now talk through the detail of our first quarter performance, and conclude on the second quarter and full year outlook. As we've heard from Venkat, we've delivered ahead of guidance on our overall production and cost targets, despite the safety stoppages that affected our South African operations.
Notwithstanding a 6% weaker gold price and 8% lower production, we also delivered a strong cost performance underpinned by a 7% reduction in all-in sustaining costs. The $67 per ounce reduction in all-in sustaining costs was well supported by our cost optimization initiatives, whilst we saw significant benefit from weaker currencies and lower oil prices.
We remain sensitive to the oil prices and currencies and confirm our sensitivities at budgeted oil and exchange rate assumptions, which we issue with caution. Just to recap, for every $10 per barrel change in the average Brent crude oil price it will impact our cash costs by approximately $7 an ounce, while a 1% weakening in our currency basket will positively impact cash costs by approximately $6 an ounce.
Adjusted EBITDA was solid at $409m for the first quarter despite lower gold price and lower ounces sold. Free cash flow before financing costs was $20m compared to $87m last year. We see a big swing in free cash flow from last year and that was due to the negative impact of a $73-per-ounce-lower gold price as well as working capital movements, as you see on the slide in the grey shading there, and equity investments. And that resulted largely due to the lag in the timing of dividends received.
In addition, there was a non-recurring tax refund of $37m last year and that mainly related to Australia. And that would distort the year-on-year comparison.
That was showing the reconciliation to the free cash flow. When one looks at the tax charge on the income statement it is higher and that does relate to the weakening currency translation effects on deferred tax in South America. Despite the decline of the free cash flow generation, we did however only see net debt increase marginally to $3.1b.
Moving on, all-in sustaining costs show steady improvement over the past four quarters. Our focus to increase cash margins over this period has been relentless, even in a depressed gold price environment. And that focus will continue.
We've pulled over $1,100 per ounce from all-in costs from the quarterly peak and we've also reduced approximately $625 per ounce from our all-in sustaining costs again from the highest levels to where we are now. The extent of this reduction, relative to where we were and our ability to absorb pressures and sustain this over eight quarters, stands out in our peer group.
Moving on, we see that despite overall lower production levels due to Obuasi's transition to limited operations phase and the disposal of Navachab as well as the safety-related stoppages in South Africa that Venkat spoke to, we were able to reduce all-in sustaining costs by approximately $67 per ounce in quarter one compared to quarter one last year.
The reduction in all-in sustaining costs comprised a number of factors. There were, efficiency improvements of approximately $23 an ounce; oil and currency benefits together amounted to about $81 an ounce; as well as lower royalties on the back of the lower gold price of $16 per ounce. These benefits were offset in part by inflation.
We also saw that sustaining capital was down by $24 an ounce in the first quarter. And that mainly related to Obuasi now being in limited operations phase. Ron referred to the lower Geita sustaining capital which related to deferred stripping. And the completion, there was also a reduction in sustaining capital due to the completion of the MWS project compared to last year. We also saw some small currency benefits coming through on sustaining capital.
So your question is, is this sustainable for the rest of the year? We are expecting some catch-up in sustaining CapEx in the coming quarters that follow due to the timing of some expenditures. However, depending on the currency assumptions and some of the benefits that we've spoken to, we do expect some banking as permanent savings as well as some permanent bankings relating to the fundamental reductions in CapEx. And Ron alluded to some of that, in addition to the MWS project which is complete.
However, at this stage given that it is early in the year, it's the first quarter and we've got three more quarters to go, our full-year guidance at this stage does remain unchanged on CapEx.
Moving onto the financial flexibility slide, we see that our net debt to EBITDA ratio compares favorable to our peers. We have sufficient facilities and headroom in our balance sheet to fund our ongoing operational requirements before and after reasonable downside sensitivities relating to production disruptions.
In order to contextualize the potential impact of the production disruption in the South African region, bear in mind that at least 72% of our EBITDA, and that is based on last year's actuals, is currently generated by our international operations. As we've seen clearly in this first quarter, the geographic diversification of our portfolio enhances our resilience to production interruptions.
Our net debt level is largely unchanged from last year despite the lower gold price and lower ounces sold. And that demonstrates our flexibility and resilience in a difficult market. Our net debt to EBITDA ratio also remained well below our covenant levels at 1.97 times. And we have already banked the EBITDA required for the June 2015 testing period while getting a very strong start on the December testing period with the first quarter's EBITDA at $409m.
As we've said previously, our medium-term leverage target is 1.5 times net debt to EBITDA. We are making good progress on our deleveraging strategy, as Venkat spoke to, and that would position us strongly by freeing up cash flows, providing a reasonable buffer for volatility and creating a platform to deliver returns to shareholders while pursuing opportunities to improve our value proposition.
Our debt has long-dated maturities with a spread of types of facilities and currencies, enhancing flexibility and currency matching. The RCF facilities incorporate a user covenant with net debt to EBITDA now set at 3.5 times with a one-period waiver of up to 4.5 times subject to certain conditions.
Apart from the rand, so that's a ZAR750m bond redemption, and the equivalent of that is about $61m, and that is due in December 2016, the earliest international bond maturity date is in April 2020. And that allows us sufficient time to plan for the redemption.
The high yield bond issuer's call can only be exercised from July 2016 onwards at our discretion, thus allowing us sufficient time to fully explore our self-help measures before we decide how to proceed with this opportunity. Remember, we have the full discretion in determining both whether and how to exercise this option.
Our credit ratings remain unchanged at BAA3 rating with a negative outlook by Moody's and BB+, so that's a BB+ with a negative outlook by S&P.
Moving onto my final slide it talks to the outlook for the second quarter and the full-year guidance for 2015. Our quarter-two guidance on production is higher at 960,000 to 1m ounces and the consequential flow through on cash costs which range we are providing at $770 per ounce to $820 per ounce. And that does take into account improved production in the South African region given the recent safety stoppages that we experienced in the first quarter and the ramp-up in production on the MLE2 expansion at CC&V.
The higher cash costs also takes into account winter power tariffs in South Africa, timing of expenditure and higher commodity price assumptions. Our annual guidance of 4m to 4.3m ounces for 2015, cash costs of $770 to $820 per ounce and all-in sustaining costs at $1,000 to $1,050 an ounce remains unchanged.
We've made no provision for power-related stoppages in South Africa, any unforeseen operational disruptions or changes to the portfolio. Capital guidance remains unchanged at $1b to $1.1b of which just over 70% relates to sustaining CapEx.
On that positive note I will now hand back to Venkat to conclude. Thank you very much.
Srinivasan Ventakrishnan - CEO
Thank you, Christine. Just in terms of wrapping up, if I can cover three broad themes. Firstly, consistency, secondly, our score card for the quarter against our stated strategy, and finally recapping our investment case.
Starting with consistency, as the slide before you will show we have built a good track record of consistency and delivering on our quarterly guidance. And that's happened meticulously every quarter whilst at the same time meeting our annual guidance as well.
And we have either beaten the guidance or we have met it for close to two years and more. We are into our ninth consecutive quarter despite formidable amounts of headwinds. And you can understand with the number of mines we have with its challenges the headwinds are formidable.
And as I keep reiterating every quarter, mining is a long-term game and looking at quarterly data can be quite misleading, so it's always possible that we might miss a quarter target here and there. But so far we have certainly banked all quarters to date and the trajectory is positive.
So now looking at our score card starting with the foundation, more work to do on the fatalities to get back to where we were last year. But having said that, our all-injury-frequency rates is heading in the right direction which is encouraging, so a bit of work in progress to be achieved to getting us to zero harms. Excellent work in terms of sustainability and also in terms of people, and evidence of what we have done in Ghana should support what we have achieved on the sustainability front.
On the balance sheet certainly lots of flexibility still available and liquidity, but as you can see our debt levels have hardened at around just north of $3b, and therefore the deleveraging strategy is in progress.
On the cost side the numbers speak for themselves. Excellent cost management which has been achieved over two and a half years assisted recently by weakening foreign exchange rates and fuel cost as well.
Portfolio is an area where we are steadily working every year. Good progress in respect of Sadiola and Yatela, and here we are in discussions with Iamgold. In respect of Obuasi the feasibility study, as Graham articulated, is progressing well. And Ron outlined areas where we are seeing the next long-term improvements come through in respect of Siguiri, Geita, Serra Grande and Sunrise Dam as well.
Then in terms of further long-term optionality, clear indication of Tropicana showing early good signs, and as you know it's quite an important asset in terms of long-term potential. SA reef boring after a brief hiccup in the previous quarter showed very good progress in quarter one. And Kibali continues to surprise us on the potential upside.
So with the final slide, ladies and gentlemen, to recap, our investment case is as strong as ever with a number of value catalysts that will open up over the next two years. We've got a high quality of long-life gold assets with very good leverage to both energy and currencies. We are prioritizing margins over production growth. And you can see that production has dropped but the margins have actually opened up and the costs have improved.
And our focus here is going to be on relentless cost and capital discipline. And here we are conscious of inflation challenges. And I keep saying this is an area where we have got to keep running down an escalator that is coming faster. We have got to run faster to make progress or at least stay where we are.
As a team we have taken decisive strategic response to the gold price on various fronts, whether it is production cost, capital or overheads. And to give you an example our overheads are back in nominal terms at the level it was in 2006. That's showing the extent of cost reductions that have taken place both at the Group level and at the operational level.
On balance sheet, despite having long-dated maturities and liquidities and covenant headroom, we are demonstrating that we are both decisive and proactive in our balance sheet management. And as the last two to three years would have shown we have a very well developed model in terms of stakeholder relationship to ensure that we preserve our licenses to operate.
So to conclude, ladies and gentlemen, I remain optimistic of what AngloGold Ashanti can offer going into the future. With those comments, happy to take any questions.
Johann Steyn - Analyst
Thank you. Good morning, guys. Just a couple of questions please, first of all to Mike. With regards to Mponeng, the fatalities, you mentioned that you can't mine in some of the previously high grade areas. How do you expect this to develop both in short, medium and longer term? Are there any kind of (technical difficulty)
Mike O'Hare - COO South Africa
Okay, yes so what I'm trying to indicate is that the overall reserve remains largely intact; but given the seismicity and given that you're going to have to mine some of the ground conditions a bit slower we are going to see a reduction from where we used to in terms of Mponeng's production levels.
How big that's going to be we'll be working on exactly that, because obviously when we've had this kind of incident there is quite a knee-jerk reaction at the mine, and a lot of things need to happen in a short period of time. So the situation really only stabilizes after a couple of months.
As far as the long-term optionality in terms of the project, the stoppages do affect the schedules which do slip. If that's going to be material or not we'll know that by the time we finish the September planning cycles. So at this stage in summary we will see a reduction in Mponeng ounces. As far as the schedule is concerned we'll know how -- if there is a significant impact, a material impact on that towards the end of Q2 beginning Q3.
Johann Steyn - Analyst
And just with regards to the strikes, not strikes, let's be a little bit more optimistic than that, the wage negotiations coming up: what's your expectations for how that's going to go? Gold Fields did something that was a little bit unexpected; does this put you in a weak position? How do you guys feel you're going to address the strikes this season? And are you feeling optimistic, cautious at this stage? How should we look at it?
Srinivasan Ventakrishnan - CEO
Mike, I'll pick it up if I may on this one. Firstly, going back to Mponeng the real issue here, Johann, is that -- is one of safety. What we don't want to do is to compromise safety and at the same time not knee-jerk react into total conservatism either. So this is an area which we are working through. The impact which we are going to see in Q2 is already factored into our outlook and we are working through the rest of the impact for the year.
The biggest issue in terms of SA as we go into Q2 and Q3 is wage negotiations. So you asked a question about Gold Fields settling in on wage increases. The reason they chose to do so was because South Deep is a mechanized mine and therefore their challenges were different. And also they have fewer categories of employees compared to ours.
So there is a reasoning behind why Gold Fields went ahead and proceeded with a separate settlement. And I've got my views on what that settlement would do for long-term viability of mines, and I'll keep that to myself.
Really from our point in terms of how we are approaching it this time, and this is the remainder of the gold companies, is that we have just seen what happened in terms of platinum. We have given unaffordable wages increases going back a year ago, now we are debating job losses. And this happens year in, year after.
So the approach we have taken, which is a different one, is to say rather than just negotiating one variable and then starting to agree on what we do about the other variables, let's put everything into the pot which is the overall social compact for the mining industry where we say at the end of the day it's incorrect to just negotiate around a basic wage. You've got to look at the total cost to the company, which is quite formidable. And at the same time you've got to take into account what that does in terms of profitability of the mine, jobs both in terms of creation, security and job losses. And importantly there is another variable here which is the government, which is around electricity tariffs, which is around infrastructure, etc. All of that has to come into the party.
So where we want to take this discussion is to say, and this primarily to our employees, to say -- who are really concerned about what the industry and where the industry is heading in terms of -- they've seen the job losses in the gold sector, they've seen it in terms of the platinum sector as well. So the question which I get asked and Mike gets asked when we stand up and address our mass meetings, and we have had one in every site, every one of our mines, and recently our general managers have started having such meetings as well, is concern around jobs.
So it's a trade-off between job security and preservation with wage increases. And we want to have this discussion. We have invited the unions to participate so that we can collectively work this together. So that's really the direction we want to go. Is it going to be an easy ride? Probably not, but having said that we have got to change the debate from the conventional way of how the debate has been progressing.
Johann Steyn - Analyst
Thanks, Venkat. Sorry, just one more question then, who are you negotiating with, AMCU? And how that's process working?
Srinivasan Ventakrishnan - CEO
Yes, it's basically as we did before in terms of the chamber through the collective bargaining, and here with all of the four unions which is NUM, AMCU, Solidarity and UASA, all four unions.
Patrick Mann - Analyst
Hi, morning. Patrick Mann from Deutsche Bank. Just a broader question on South Africa, all the -- all of your peers who've reported -- I understand that it's specifically safety-related issues at yourself. But across the board we've seen a lot of weakness. I know that the first quarter is seasonally weak, but it's -- is there something broad (technical difficulty) industry that you could (technical difficulty) touch on, just maybe explain from (technical difficulty) outside.
And then my second question you're also looking for a partner for your Obuasi project and also in Colombia. Could you just update us on whether you've been approached on those two please? Thanks.
Srinivasan Ventakrishnan - CEO
Great. Let me pick up the second part of the question, part of the first and then I'll hand over to Mike. In terms of Colombia and in terms of Obuasi the answer is yes. We have had approaches in respect of potential joint venture and partnership opportunities in respect of both, understandably all covered by confidentiality agreements so I can say nothing more. But certainly the interest is encouraging.
In terms of South Africa the broader dynamic we are seeing is really the challenges which you see in terms of operating at depths. The safety stoppages have had an impact across the sector. Particularly there was a spike in the number of fatalities across the mining industry in January, so understandably the safety stoppages were quite intense, which has impacted the other companies.
What we are also seeing is potential in the run up to wage negotiations an element of unsettling drop in productivity levels, etc., so there is a people piece as well which we are seeing impacting in terms of productivity. And since we had the strike in 2012, SA productivity levels haven't gone up to the levels they were pre that. We are starting to see sporadic improvements in certain areas and have at a Group level the first time productivity, which is ounces per TEC, went up for over a decade was in 2014, but Mike can elaborate on that.
Mike O'Hare - COO South Africa
I'd say the only other systemic issue beyond what Venkat has mentioned is security of energy supply. So whilst the load shedding affects us at the moment, it's affecting us in a fairly small way because we are able to shift our loads around voluntarily to assist Eskom.
The issues we are starting to see more of are, one, cable theft which implies that we need to beef up our security, so does Eskom and so does the South African Police services, need to disrupt in the communities where we are finding this kind of theft happening.
And the second one which is quite concerning with us, and we are in discussions with Eskom around it, is to ensure that they maintain the equipment. Many of these substations were built at the times the mines were built and require fairly intensive maintenance. So our concern is that they may be not focusing as well as they used to some of the maintenance practices around these big substations.
So that does seem to be changing. But it's not as though Eskom is doing nothing about it and they are unaware of it. I do think however they are fairly stretched and have a lot of different priorities at this particular stage.
Derryn Maade - Analyst
Hi, good morning guys. Derryn Maade from HSBC. Mike, just a quick one on Mponeng and the Below 120 projects. Could you just give us some guidance on how that's been affected by (technical difficulty) taking us through this morning in terms of timing and CapEx.
And then Venkat just a strategic question to you, the asset sales seem to be progressing quite well. And if you could just take us one step further then to, let's say we realize the $1b target that you're looking for, what do you do from there? And does the South African split come back onto the table at that point?
Srinivasan Ventakrishnan - CEO
Do you want to do the first one?
Mike O'Hare - COO South Africa
Okay, I'll take the first one. So we are busy building -- we've just starting rebuilding phase two. Remember we had that hiatus in phase two. So phase two's building and phase one is completing. So really phase one now is about the gold buildup, the gold buildup does get hampered every time you stop the whole mine.
In fact this time around during these fatalities and these subsequent stoppages Venkat actually came down to the mine and had a long conversation with the PI and the DMR in order to get them to understand that we will stop gold production when we need to. However, stopping the capital projects and affecting the future schedules of the mine is completely unnecessary.
So for the first time we succeeded in able to divorce those two things. However, the mine has been stopped and you'll see the one graph how many times it's been stopped since Q4. There will be an impact on the schedule.
But remember the gold buildup takes a fairly long time to build, so we do have quite a bit of time to see whether we can catch up some of the losses, which is why I'm not keen at this stage to give any kind of numbers and say, look, we are going to shift the project out by X amount of months and the first gold or we'll delay the -- it's a little bit early to say that. But inevitably we can't keep absorbing all of these stoppages; there will be slippage at some stage. And the reason why it's important, as I say in the report, is that's where the high grade buildup for mine comes in the next number of years.
Srinivasan Ventakrishnan - CEO
If I can pick up the second part of the question, certainly the proceeds in terms of any asset sales or JV is ring-fenced, applied towards reducing debt. And really what it does, Derryn, in terms of the split or not split I think that's a separate aspect and you never say never. But it's not certainly front and center of our minds.
But really what we find in the current climate is that once you look beyond the short to medium term into the long term, the industry certainly and the market rewards companies which have got a strong balance sheet. And post this, AngloGold will have one of the strongest balance sheets in the industry. You want to then push back into free cash flow territory, restoring dividend yield back whilst at the same time showing a trajectory in terms of long term growth which is where we will get the up-tick: coming through Mponeng expansion, coming through potentially reef boring technology coming to life, adding ounces in South Africa.
And going across the international space would be getting the development of Obuasi going and starting to bring some of the optionality back on the table in terms of Colombia. I am looking five, 10 years beyond in that regard. But certainly the position here having gone through the cost discipline and the portfolio rationalization is to position AngloGold in the best possible position to tackle as being the preferred stock in the industry.
Derryn Maade - Analyst
Thanks very much.
Adrian Hammond - Analyst
Morning. It's Adrian Hammond, Standard Bank. Mike, if I could ask you a question please on the progress you're making on the consolidation of the three business units in South Africa. Could you give us a bit more color on what sort of cost savings that could achieve, and particularly around Kopanang which appears to be still loss making. Is there any chance of rescuing this business please? Thanks.
Mike O'Hare - COO South Africa
Thanks. You've hit the nail on the head, Adrian. Kopanang is the asset that worries us quite a bit in the Vaal River region. So what we've said is that there is a huge infrastructure that was designed for 11 mines. And what we are trying to do is geographically reduce the size of the footprint. Secondly, what we are trying to do is decrease the amount of people that become overheads on a mine or services on a mine, and that service isn't actually needed. So put those two layers together into one layer.
And then thirdly can we do anything better with the Kopanang mine plan, even if that means going to a shorter life but higher grade and increasing the margins? So all of that work's happening as we speak.
It's too early to say exactly which numbers and give you a dollar per ounce number. But what I have seen now is the team actually putting numbers on the table to say we think we can get this amount from the geography area, we think we can get this amount from the Kopanang ounces themselves and we think we can reduce mine structures by this number. So we've moved almost if it were from concept, pre-feas basically into the feas stage so we are progressing well.
It's too early though to give you exact numbers. But our concern is the same as yours, Kopanang is still far too marginal at these gold prices.
Stewart Bailey - SVP IR
All right, I think that more or less sums it up, Venkat?
Srinivasan Ventakrishnan - CEO
Yes, thanks, Stewart. Before we adjourn for tea and snacks outside just a few words in respect of Mike O'Hare. As you know, we announced last time that Mike is taking retirement from AngloGold Ashanti. He has done three decades, north of three decades with AngloGold Ashanti and has been a very loyal AGA employee. And over a year ago he did come and say to us that he wants to take retirement from the company.
Looking back at Mike's career, and I've known Mike only in the last probably 10 years, but certainly greater working together has been during my last two years as CFO and the two years as CEO, number of highlights in terms of working with Mike during this period was certainly managing the 2012 labor disruption which we saw, which was quite a challenge. And Mike and the team did extremely well.
Mike can be singled out in terms of what he achieved in driving the safety performance in the South African mines, particularly fatalities, the safety performance up and fatalities down across the mines. And notable in there was the earthquake which trapped over 3,500 of our employees in Vaal River. Evacuating every one of them within a five-hour period is a formidable challenge.
Also what is not said is the extent of transformation which has actually happened within the South African management team, his exco, and also there are books available, which shows what we have invested into the community in terms of sustainability and also in terms of community development. It's also on our website.
But what has also happened here under Mike's watch is changing the thinking longer term for the South African industry, which everybody regards as a sunset industry. If we can get the technology to work to get the formidable number of ounces at very good returns that changes the trajectory and even the conversation in respect of the SA industry.
That's on the company front as well, but from a personal front he's been a very good colleague of mine. He's supported both the executive team and myself through this transition when I took on the role of CEO, just over two years ago, so it's time to thank him. And it's not just an Eskom member who ends up working for AngloGold Ashanti, the spouse makes a lot of sacrifices as well, so thanks to Rose, his wife, for all of the efforts and support over three decades.
Chris Sheppard takes on the role from June 1. And there is an organized handover from Mike to Chris during the course of the third quarter. And Chris will be here to present the next set of quarterlies in respect of our South African operations.
So to conclude, thank you, Mike, for all your help and support, and a hearty welcome to Chris to take the South African region into the next stage. Thank you very much.