Stewart Bailey - Senior VP, IR
Good morning everybody and welcome to this presentation of our results for the third quarter and the three months ended September 30. Thanks for making the time. This is going to be a relatively detailed and slightly longer than usual presentation so we'd appreciate your patience in that regard. (Conference Instructions).
Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects and outlook of AngloGold Ashanti's operations, individually or in their aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of AngloGold Ashanti's exploration and production projects and the completion of acquisitions and dispositions, AngloGold Ashanti's liquidity and capital resources and capital expenditures and the outcome and consequence of any potential or pending litigation or regulatory proceedings or environmental health and safety issues, are forward-looking statements regarding our operations, economic performance and our financial condition.
These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance and achievements to differ materially from the anticipated results, performance or achievements expressed or implied in these forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct.
Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic, social, political and market conditions, the success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, and business and operational risk management.
For a discussion of such risk factors, refer to our annual report on Form 20-F for the year ended December 31, 2013, filed with the US SEC on April 14 of this year. These factors are not necessarily all of the important factors that could cause our actual results to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also have material adverse effects on future results. Consequently, you are cautioned not to place undue reliance on forward-looking statements.
We undertakes no obligation to update publicly or release revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent or oral forward-looking statements -- written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by these statements.
This communication may contain certain non-GAAP financial measures. We utilize these non-GAAP measures and ratios in managing our business. Non-GAAP financial measures should be viewed in addition to, and not as an alternative for, the reporting operating results or cash flow from operations or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies use.
AngloGold Ashanti posts information important to investors on the main page of the website at anglogoldashanti.com, under the investors tab on the main page. It's updated regularly. You should visit the website and look at it.
The line-up for today, Venkat's going to start off with some introductory remarks, a reflection on the proposed transaction of September. Ron Largent will talk to the international operations, Mike O'Hare the South African operations. Graham Ehm will talk to the projects and some exciting exploration results. Christine Ramon will talk to the financials and the balance sheet, and then Venkat will wrap up with some concluding remarks.
Srinivasan Venkatakrishnan - CEO
Thank you Stewart. Morning ladies and gentlemen. If we can start off with the first slide, just quickly recapping on our strategy that we articulate each quarter. Five building blocks towards sustainable free cash flow from a diversified quality portfolio.
Firstly, with foundation in terms of safety, people and sustainability, and some very good work has taken place in the last couple of years in that regard. Proactively ensuring financial flexibility. The third, optimizing all forms of expenditures, whether it's direct costs, overheads, exploration and capital expenditure. Improving the overall portfolio quality and sweating the assets harder. Despite all of the short-term priorities we face, reminding ourselves that mining is a long-term game, and we've got to keep optionality within the business to help us improve our returns over the longer term.
With those introductory comments, going straight into the third-quarter results, we are pleased to be able to report you that for the seventh consecutive quarter AngloGold Ashanti has reported a strong performance despite all the headwinds in the sector and the noise we had from the previous month. As you would have seen, we have actually beaten our guidance and also come better than our prior-year and prior-quarter performance on most, if not all, of the metrics.
During the quarter safety was a standout performance, and we'll have more of it shortly. And walking through some of the highlights of the third quarter, production, despite the setback of the earthquake at our Vaal River operations and not having the benefit of the Navachab production when you compare two periods, having sold it on June 30, we were still 8% ahead year on year, 5% ahead of guidance and 3% up on last quarter, showing clearly that the operations are firing on all cylinders.
In addition to that, on costs, if you look at cash costs, we are 6% better than guidance, 2% better than the previous quarter despite the wage increases and [SCN], the electricity tariff hikes, and we're little changed year on year, but we've come out better than our guidance of $850 to $890 an ounce. Our all-in sustaining costs are down 10% year on year, all-in costs down by around 19% year on year.
We have generated some free cash flow during the quarter and free cash flow defined as amounts generated after all outgoings. And our net debt and EBITDA has been largely steady at around just 1.64 times.
We have declared a significant maiden resource at Nuevo Chaquiro and Graham will talk to this. We're excited about this find because it's a copper/gold deposit equivalent of around 25m gold-equivalent ounces, which will give us an opportunity to monetize some value from Columbia.
And Christine will cover in our outlook slide how we have improved our annual guidance across various metrics.
The simple table, which we put up every quarter, shows what the team has been able to deliver quarter on quarter. And when you compare September with a September, bear in mind that we already started implementing a lot of improvements in September of 2013. So it's like actually trying to run down an escalator, which is going up; you better run faster to stay where you are or to catch up.
Our two strongest headwinds still remain, which is the gold price and inflation across the 11 countries in which we operate. Notwithstanding these headwinds, we have been able to pull every lever in the business within our control and deliver the improvement and importantly deliver nominal and real cost reductions.
On the operational performance slide, full credit to Mike and Ron on the production and cost performance, and to Graham and David on Obuasi. And in terms of cost, Italia and Ria on what they've been able to achieve in terms of pulling down our indirect spend and corporate costs.
As you can see, production is up between 8% to 14%. Cash costs have actually come down. The reason why are you seeing an increase quarter on quarter on cash costs is because we had the impact of the Vaal River earthquake, reducing units of production in South Africa. And we also drew down from some high-cost stockpiles in terms of some of the mines, and therefore those costs came through. But the costs has already been incurred and it actually generated more free cash flow.
In terms of our corporate costs and exploration, again has come down by close to two-thirds, and our capital expenditure has dropped by around 50%. Our all-in sustaining costs and all-in costs have dropped by around 10% to 17% and 19% to 26%. Importantly, our EBITDA has gone up notwithstanding the drop in the gold price.
And as you can see, the cash burn on a year-to-date basis of about $1b last year same time has been switched to a cash generation of $86m. It shows the turnaround, which has actually been achieved within the business and the work continues.
Looking at safety, and in today's presentation this is our proudest slide. But, at the end of the day, what experience has taught us is to be humble and modest because you just don't know what is round the corner. So let me start off with a bit of a setback. After 3.7m fatality-free shifts, which is a record for any deep-level South African underground mine -- I repeat 3.7m fatality-free shifts, 1,062 days or 2 years and 11 months without a fatality and having secured an award earlier this year -- we unfortunately lost a colleague of ours, Mr. [Ponti], at a fall-of-ground accident this Friday, October 31, it's after the quarter, at Kopanang.
Mike and myself have spent the weekend at the mine, doing our reviews and learning from this incident. And certainly quite a few learning experiences come through and importantly it says we can't afford to take our guard off when it comes to safety. We're certainly saddened by the loss of one of our colleagues. One fatality is one fatality too many and it's something we take very personally within the business.
But that shouldn't deter in terms of what the Company has been able to achieve in safety over the last couple of years. The safety performance this quarter has been record-breaking in terms of what we have achieved. And what the teams have achieved under Ron, under Mike and under Graham have been truly remarkable. You just need to take a look at the slide for a few moments to see what the operations and the safety teams have actually done and delivered to date in terms of this performance. And here full thanks goes to every one of our employees and contractors, every one of the 60,000 who have worked across our global operations to deliver this remarkable achievement.
If I can just leave you with some of the highlights of the last quarter, this was our fourth fatality-free quarter across our operations within the Group. And this is the first time in the history of AngloGold Ashanti that we have managed to record two consecutive fatality-free quarters, two quarters, and that was the second and third quarter of 2014. We've had the longest period of 224 days, the prior record was 118 days, without a single fatality across our operations, and Mike and Ron will cover that we have actually broken new records across all of our operations.
Turning now to the balance sheet, on September 15, we withdrew the proposed separation of the business and the concurrent rights issue; that proposal is off the table. We have been proactive in managing our balance sheet and in that regard you will notice that we have long-dated maturities, significant liquidity and covenant headroom currently. And remember this covenant is a trailing 12-month metric.
The picture on this slide, the chart on the left-hand side of the slide, shows where we sit relative to our peers within the industry. Christine will articulate our aspirational medium-term deleveraging target, which we feel is appropriate as a prudent management team. And in this regard, we know that we have time and also we are cognizant of shareholders' direct feedback to us on dilution. So we have therefore prioritized a range of self-help measures to bring the leverage down over the medium term, and in this regard, we may consider the sale or joint venture of an operating asset or two for value, if needed.
If I can provide you an overview of some of the self-help measures, which my colleagues will articulate later on in their presentation. Starting with South Africa, Mike will cover in his presentation that we are in the process of consolidating the South African footprint from the current five underground mines and two surface operations into three entities to capture all the operating synergies, which are available, which we want to bring through in 2015. That's in terms of South Africa.
In addition to that, in terms of our international operations, the numbers will show what we have achieved to date by being able to do more with less. And Ron is excited about what he can achieve by getting the team to challenge conventional cost structures. To give you an example, in the third quarter of 2014, the quarter just gone, all-in sustaining costs year on year for the international operations dropped by 13%, to $973 an ounce, notably in continental Africa by around 20%. Ron now wants to take the team to test the $900 an ounce mark going into 2015. Again, that is an aspirational target.
Ron, Mike and Graham have started to review the life-of-mine plans to extract value out of the plans using out-of-the-box thinking, but at the same time ensuring that we do not damage or compromise the business in the long term.
We have also intensified our focus on overhead management and to further reduce exploration and corporate costs within the business. And Christine will cover in the outlook that we have pulled another $30m from corporate costs for 2014. It has dropped from around $296m in 2012 to the number you are going to see in the slide later on.
In addition to that, we are exploring opportunities for partnership in terms of sale of value for either La Colosa, Nuevo Chaquiro and Obuasi. Why these three items? Largely because their cash flow negative across the portfolio, and on average we spend around roughly $250m to $300m against these three areas. So it naturally lends itself to potential opportunities and partnerships. We have already had a number of reverse inquiries coming in to us from parties who have got wherewithal to do deals in terms of these three assets. And this task will ensure that Charles, Ria and the executive team will have their work cut out for them for the rest of this year and going into next year.
And, as we said, we also keep the option of sale or joint venture of any of the operating assets, if needed, to get us towards our medium-term deleveraging target.
With those rather long introductory comments, I'd hand you over to Ron.
Ron Largent - COO, International
Thank you Venkat and good morning. I will discuss quarter-three operating results for continental Africa, Australia and the Americas region. I'll not discuss each asset individually as they can be found within the quarterly report.
First, the Company's safety performance was covered by Venkat, but I think I want to re-emphasize our fatal-free quarter and the continued quarter-on-quarter improvements. We as the management team are very appreciative of the hard work the operating teams have shown to obtain these results, but understand the commitment and work required to continue to drive these outcomes.
Each quarter I have commented on the cost rationalization work across the Company and I ask you to continue to watch the outcomes on a quarterly basis. The objective of the removal of $500m out of the operating cost 18 months ago, had a ending timeframe of quarter four 2014. This $500m has been removed from our operating cost side.
The cost rationalization work continues and has a maintenance objective -- what I mean by that is maintaining the current cost structures -- and a secondary, or a second, objective of cost removal, which is identification of additional cost extraction. We've now moved these efforts into asset scheduling and efficiency improvements.
A good metric to utilize, in my opinion, is -- to understand the overall health of our cost structures, is the all-in sustainable costs. For quarter three 2014, the international assets produced 813,000 ounces at $789 and all-in sustainable costs of $973. As Venkat mentioned, that's a 13% improvement year on year, which is encouraging to us. We also believe there is more to be done, and hopefully when we'll come out with our targets for 2015 early next year they will be representative of that.
Now the continental Africa region, production for quarter three was 410,000 ounces at cash costs of $799 compared to 383,000 ounces at cash costs of $804 for quarter three of 2013. The primary contributors to this were Kibali mine, bringing that on in 2013, and the improved performances at Siguiri and Iduapriem.
I think the next slide is -- I'm trying to highlight a couple of the assets as we go through this. The slide illustrates the drill program at the Geita East pits, which has confirmed high-grade mineralization beyond the limits of the current pit. As you can see, the intercepts are very encouraging at depth in the Geita East area, and this will -- we'll have to take this information and will evaluate it and the office may alter our extraction plan, but it is something new, something we've been working on for quite some time and the outcomes are very favorable.
The Americas region produced 251,000 ounces in quarter three 2014 at a cash cost of $730 an ounce compared to 270,000 ounces at $656 in quarter three 2013. Production was slightly impacted almost in every operation in the region this quarter. There were no major issues, but sequencing of underground stope availability, a small geotechnical issue, were a couple of the areas that impacted slightly on grade and slightly on timing of materials.
The next slide is I'd like to take a couple minutes and talk about the Cuiaba mine in Brazil. This asset has been in operation for 28 years and produced approximately 5m ounces. The current production rate is 300,000 ounces per year through a 1.7m tonne pure processing facility.
The ongoing exploration activities are showing very promising results. The Cuiaba team has confirmed the down plunge extension of the main ore bodies to level 24, which is about 1,600 meters below the surface, and the narrow vein system to level 26, which is equivalent to about 1,750 meters below the surface. Additionally, there's been satellite ore bodies near the Cuiaba infrastructure that have been intersected from level 9 to level 25. The confirmation of the down plunge, extension of the existing ore bodies and the intersection of satellite systems are real exciting outcomes for this asset. The current mine activities are approximately 1,100 meters below the surface or level 16.
Our outlook for the asset is changing due to the successful mining method change from cut and fill to sublevel stoping wherever applicable, and balancing the narrow vein contribution to production. We've moved this from about a 15% contribution this year to around 40%, which has really changed the planning in the Cuiaba mine. Additionally, there has been improvements to rock mechanic controls and now, with the before-mentioned the exploration results, we have some work to do to understand the future of Cuiaba. This is an area -- the area of work is to review the scheduling efficiency that could change the future productivity and outcomes of the Cuiaba mine.
A couple of comments on Serra Grande. The results from the drilling of the Inga ore body are confirming the upside potential we anticipated when we purchased 50% of this asset. As you can see from the intercepts on the slide, these high-grade intercepts are similar to the old (inaudible) quartz ore body we had mined previously, which makes a significant difference to the outlook for this asset. The current planning indicate this ore body will be in the 2016 schedule.
The Australia region, production for quarter three 2014 was 152,000 ounces at $861 per ounce compared to 62,000 ounces at $1,200 (sic ? see slide 16 "$1,270") an ounce in quarter three 2013. This improvement was primarily due to the Tropicana mine, which wasn't in operation in quarter three 2013.
Sunrise Dam production although was up 10% compared to quarter three 2013 due to recording a site record of underground mine production. Total ore tonnes mined from underground was 616,000 tonnes in quarter three. That rate is slightly better than the planned 2.4m tonne per annum objective.
I think everyone who has been watching that the successful operation of Sunrise over the past decade had the understanding that the asset was near end of life when the surface resources were exhausted. When the Australian team realized the open-pit resources would be depleted in late 2013 there was a systematic plan assembled to understand the capability of the underground resource. The plan, although sounding quite simple, was to increase underground ore production to 2.4m tonnes per year initially and at quite reduced rates. This entire year -- in reduced cost per tonne.
This entire year of 2014 was based on meeting the 2.4m tonne mining rate, which has now set a base for the planning of the longer-term objective, obtaining a rate of 3m tonnes per year by 2017. I think what's remarkable about this achievement is the current mining rates have been accomplished with only five haul trucks.
The exploration of Vogue ore body to depth will determine the life of mine of Sunrise Damn. This exploration is in process in the upper portion of the deposits, and the intercepts are impressive, which can be seen on the screen. The future line-of-mine capability and production profile will be determined over the next year to year and a half and that will set the stage for Sunrise into the future.
I think this asset is one that we're looking forward over the next year and a half, because I think so many people thought that this is an open pit only, and now 100% of our ores are coming from the underground with a little bit of the stockpile addition to keep the mill full. We have a 3.6m ton mill. We're at 2.4m tons coming from the underground, plans to go to 3m and of course probably won't be happy until we somehow figure out how to get it to 3.6m.
But with that said, thank you, and I'll turn it over to Mike.
Mike O'Hare - COO, South Africa
Thanks Ron and good morning everybody. I'd like to start with some feedback regarding the earthquake. We guided quite a lot down and clearly what we managed to achieve through the quarter is not as bad as we thought it would be. And that's largely due to the work done particularly in the West Wits region in terms of pulling back some of the production.
The immediate effect of the earthquake is obviously we had to stop the working places. It affected all three mines in the Vaal River region. We had to examine the infrastructure. We spent a lot of time counseling our employees. And then we watched a curve, which was developed by the Japanese in response to their earthquakes, called the [Amari] curve, which predicts the decay in seismicity of the aftershocks. And only once we felt, and on advice from Japanese seismologists, that we got to a point that the activity was low enough could we send people back into those mines.
The West Wits, led by the Mponeng mine, achieved a really nice dollar per ounce cost outcome during the quarter. Maybe it's time to take the opportunity just to talk about how costs should be measured in the South African region. Our ore bodies are by nature narrow vein, very high-grade ore bodies and that's across our region. The best way to maximize profit out of those ore bodies is to go after the gold, diluted as little as possible. So in other words our objective is mine as few tonnes as possible in order to increase the grade on surface.
Now what you get when you do that is a decrease in some of the factors that affect your quality. For instance, mine core factor deteriorates with the more dilution you put through the system. Costs obviously go up as you do that. You've got to mill that extra waste you've got to hoist it and you've got to transport it.
So I think a better measure in terms of having a look at the region's performance would be to look at the all-in sustaining costs. And it's nice to see that we are managing to keep those costs in line despite the inflationary increases.
For the quarter a challenge, and we certainly have plans to improve the situations on our surface sources operations, where mine waste solutions and the hard rock business really have areas that we could potentially improve upon, and we are certainly working on those at the moment.
If I move to the next slide, just a little bit on the safety achievement. Now the October 31 was a significant day for me, but I am starting to get superstitious. The last quarter we reported record-breaking results we had a earthquake and unfortunately this quarter we had a fatality. But it was a point in time at which every single one of the South African operations was on millionaire status, even if that was for a brief moment.
The management challenge now is to get the teams focused again, to prove to people that it's not luck, to rely on the systems and the leadership values we've developed in order to ensure that we replicate the kind of performances we have put together. And we certainly won't let the death of Mr. Ponti deter us from saving many more lives into the future.
If I can move to the next slide, Venkat talked about how we look at costs now in the region. You can keep cutting costs in a given structure, but ultimately what you need to do is have a look at the way you structure it and the work you do because the costs are determined by the work you do.
In Q2 we looked specifically at the productivity of the services area. So we always look at productivity of our people underground, but when you analyze the services -- in other words, financial, HR, human resource management, security ? if you analyze all of those and you turn them into a variable cost -- for instance, you measure them per ounce or measure them per square meter -- we found that our productivity had really deteriorated beyond what we'd expect with a decline in production over the years.
We analyzed that. We looked at duplication between the regional management and the corporate. And we came to the conclusion that we also needed to look at the services that are manned up on each and every mine. Some of our mines' volumes have become a lot smaller than they were three or four years ago. So the strategy we've developed and we're implementing as we speak is to put the mines into cluster or districts. The old Western Deep-levels complex is a natural district. The Vaal Reefs complex, the Vaal River as we call it now, is a natural complex. And mine waste solutions together with surface source is a natural complex to get and put together.
We've started that process and essentially it means that we combine services between corporate and region, we decentralize services from region to district and we really Hoover up the services on each and every mine to the district level. That really allows to focus on a regional level on the issues that are regional and not, could I say, hygienic from a mine's point of view. That will continue and really gets into full swing into Q1 and certainly into Q2 next year.
The progress that we've made at the combination of putting Great Noligwa together with Moab, which was a precursor to being able to do that, is really going along nicely. Obviously, the intent is to able to access the high-grade remnants, which are still profitable, at Great Noligwa if you get a decent cost structure to mine them in.
Two-thirds of the production, the high-grade remnants, are actually closer to the Moab infrastructure than they are to Great Noligwa. So progress to date, the integration is well advanced. All of the employees who used to go down at Great Noligwa are now going down at Moab, so we've successfully managed to move the people across and are utilizing that infrastructure, which allows us to get people to work a lot quicker. Secondly, the management structures have been rationalized, so that has brought about quite significant cost saving, and the Great Noligwa shaft should be on care and maintenance by June/July 2015.
In closing, a little bit of feedback on the Mponeng deepening project. A reminder that this was a project started in late 2007/2008 in order to access about 3m ounces below the infrastructure. So it gives us two more levels between 123 and 126 level.
The infrastructure currently being commissioned or commissioned is the materials monorail, and there is a picture of it to the right hand side. It's a monorail suspended on arches, which transports your material between those two levels. Our chairlifts are just on the verge on being commissioned, which allows us to get people to the workplaces very quickly. Our conveyor belts are in, so we're able to handle both reef and waste at this stage, and our cooling is virtually completely commissioned.
The key work now is ramping the development up, because starting a new mine and actually getting the gold out of it is now dependent on getting that development to the ore bodies as fast as you can. As you can see from the graft, the development rates per end are now starting to approach design. The work we're doing in the background is to understand how we increase the planned amount per end, and we certainly believe we can increase that by 20%. And lastly, mining has now begun on one of the raised lines on 123 level. And certainly we'll be arranging visits for those who are interested early in the new year.
Thank you very much. If I could hand over to Graham.
Graham Ehm - EVP, Planning and Technical
Thanks Mike. Now this morning I'll cover projects and exploration.
Firstly, in regard to Obuasi. The two charts in the slide that you can see show the progress for the transition to care and maintenance, and for the feasibility study. The transition to care and maintenance is on schedule. Mining production and development has ceased and stoping will cease shortly. Mill operations will continue through November and wind down in December. Now we've reached agreement with the union in regard to retrenchments so the process of winding down the existing workforce and employment of a care and maintenance workforce has all been predetermined and is on track.
Despite the wind-down, Obuasi had quite a good quarter, producing 78,000 ounces at an all-in sustaining cost of $1,169. There are activities that will continue in parallel with care and maintenance, and these include the decline development with one jumbo, diamond drilling in some priority areas associated with the feasibility study, and tailings retreatment.
The feasibility study is progressing well. The resource model has been updated, mine planning is now well advanced and surface and underground engineering is progressing well. So we're on schedule to complete the feasibility study early in 2015.
In regard to Kibali, at Kibali you would be aware of the challenges with commissioning of the sulfide circuit in quarter two. In quarter three good progress has been made in resolving those issues. Quarter-on-quarter gold production increased from 91,000 ounces to 145,000 ounces on a 100% basis. Ore characterization and predictive geometallurgy has led to improved operation and recovery on the various ore types. This has enabled notable improvements in floatation, fine grinding, and the concentrate leach circuits.
Having dealt with various commissioning engineering issues, plant operations have been considerably more stable through quarter three. And towards the end of the quarter recoveries have improved to over 80% compared with design of about 86%. The plant is still on ramp-up and further improvements are expected in the coming quarter.
In regard to construction, process plant construction is now complete. The Nzoro hydropower station, generating about 24 megawatts, is operational, and the Ambarau hydropower station is in the early stages of construction. The Paste fill plant is well advanced and is scheduled to be commissioned in early 2015.
The next slide shows the development of the underground mine. In the underground mine the shaft sink is now at 677 meters and has reached the level at which load level development can soon commence. Decline development is progressing well and of particular note in the last quarter is the development of the production levels for the 5110 and 5103 ore bodies, illustrated in the diagram. Development of the fourth level has commenced and cross-cuts into the ore body has been achieved on the upper three levels. Stope production is planned to commence before the end of this year.
In regard to Cripple Creek and Victor and the mine life extension project, construction of the high-grade mill was 87% complete at the end of the quarter. The dry commissioning has commenced and ore commissioning is planned to commence before the end of this year. Construction of the Valley Leach facility is progressing well and is on schedule to commission in mid 2016.
Now if I can turn to greenfields exploration in Colombia. And here we're very pleased to announce another significant discovery, this time a high-grade polymetallic porphyry in the Nuevo Chaquiro area. Nuevo Chaquiro is situated in the department of Antioquia, situated about 60 kilometers south west of the city of Medellin. The Nuevo Chaquiro project is a joint venture with B2Gold with AGA earning in and holding 88.5%.
The maiden inferred resource estimate for Nuevo Chaquiro is 604m tonnes at an average grade of 0.65% copper, 0.32 grams per tonne gold, 4.4 grams per tonne silver and about 116ppm molybdenum for a contained metal content of about 4m tonnes of copper or about 8.7b pounds, and about 6m ounces of gold, 85m ounces of silver and about 70,000 tonnes of molybdenum. Put all that together in current metal prices that works out to an equivalent of about 23m ounces of gold equivalent.
Notably 70% of the value of Nuevo Chaquiro's resource is in copper, which presents interesting opportunities. The mineral resource was tested for and found to have a reasonable and realistic prospect of eventual economic development. It represents a realistic inventory within a conceptual underground mine based on two lifts shown in the diagram, using a combination of block caving and panel caving. The resource remains open to the north and the south and at depth.
On the next slide you can see the resource within a 0.45% copper shell, shown in blue in the diagram. An analysis of the distribution of the grade shows a high-grade zone within a 0.6% copper shell on the eastern side of the deposit. This high-grade zone represents about 25% of the ore tonnes, containing about half of the metal, with a copper grade of about 1.2%. It presents a high-grade option for the development of the deposit. When compared with other copper porphyries, particularly this high-grade zone is considerably high-grade. Metallurgical test work has demonstrated that the ore floats well into a clean chalcopyrite concentrate with no penalty elements.
Details of the Nuevo Chaquiro resource are given in the press release that accompanied our results. Thanks very much and I'll hand over to Christine.
Christine Ramon - CFO
Thank you Graham. Good morning everyone. It's certainly good to be here with you today presenting my first set of results together with the AngloGold Ashanti management team.
As we heard from Venkat, management has continued to deliver on its predetermined cost and production targets, beating market guidance still amidst a continuing challenging environment. Our focus remains on strengthening the balance sheet by prioritizing the generation of sustainable free cash flow from our diversified portfolio of businesses through proactive self-help measures. I will now talk in more detail through our quarterly and year-to-date performance as well as our balance sheet debt focus before I end on the improved outlook for Q4 and the full year.
Looking at all-in sustaining costs and production, we see that our favorable trajectory on costs reflects continued discipline on all costs and strict capital allocation. Overall improved production levels, both on Q3 performance and the year-to-date performance, have been assisted by operational efficiencies.
In addition, a strong focus on the reduction of corporate costs and exploration costs has enabled the Group to deliver on significant savings of 59% and 54% respectively in the year-to-date numbers compared to last year. Capital expenditure has been reduced by in excess of 40%, both in Q3 and in the year-to-date numbers, compared to last year, reflecting project delivery and capital prioritization.
Moving on to the quarter-on-quarter reconciliation, our efforts to tackle costs across a broad front continue to bear fruit, as reflected in the 2% decrease in our all-in sustaining costs from $1,060 per ounce in Q2 to $1,036 per ounce this quarter. And that was largely on the back of reduced operating costs and lower sustaining CapEx. Just bear in mind that there are timing differences in our stay-in-business capital expenditure spend that would result in increased spend in quarter four.
Our all-in costs of $1,144 per ounce compared to quarter two is 4% lower on the back of lower all-in sustaining costs and lower project expenditure. And that is largely due to timing and the scale-down of Obuasi. Compared to quarter two, the lower normalized adjusted headline earnings of $66m, as reflected in the waterfall chart, is impacted by lower gold income, mainly related to the lower gold price, inflationary increases, higher amortization and higher taxation primarily relating to Brazil. This was offset in part by the weaker local currencies, lower royalties and the improved contribution from Kibali.
Moving on to the year-on-year reconciliation, in order to provide a better understanding of our underlying quarterly earnings performance, we have normalized our adjusted headline earnings. The major adjustments in moving from quarter three, $2m adjusted headline earnings to our normalized adjusted headline earnings of $66m, related to operational and corporate redundancies of $36m, primarily as relates to our ongoing restructuring at Obuasi, and closure and termination costs of about $7m which relate primarily to Mongbwalu.
When you refer to the waterfall charts, we see that the lower normalized adjusted headline earnings in quarter three compared to last year's results is due to lower gold price, annual inflationary increases, higher amortization and higher taxation. These were again offset in part by weaker local currencies and cost savings, as well as Kibali's contribution in 2014.
As Venkat stated, all-in sustaining costs improved by about 17% year on year to $1,030 per ounce, and these cost improvements were made despite annual wage and power tariff increases. All-in costs of $1,140 -- $1,144 per ounce for the year is 19% lower than last year, and that does capture the lower all-in sustaining costs and lower project expenditure.
Moving on to our debt levels, our balance sheet is highly geared and efficiently structured with a strong leverage to the gold price. Our net debt level has increased between 2011 and 2013 given the investment in improving our portfolio, as reflected in the $8.3b capital spend over the past five years. We are focused on capital allocation and, as reflected in the graph, we see a 45% reduction in capital spend for the year to date in 2014 compared to 2012 when capital expenditure was at its peak.
We have prioritized stay-in-business capital to ensure the sustainability of our business and project capital includes Mponeng phase 1, Kibali underground and the MLE2 expansion at CC&V, which will certainly enhance the long-term optionality of our Group, enabling us to deliver long-term shareholder returns.
We have recently signed two near RCFs for both our US dollar and Australian dollar facilities for a further five-year period. The US dollar RCF is $1b and is currently undrawn. The Australian dollar RCF has been reduced to AUD500m and is currently AUD355m drawn. We have finalized our rand facility, RCF facility, to the extent of ZAR1.5b, to reflect the same terms as our US dollar and Australian dollar facilities.
These facilities do incorporate a looser financial covenant, with net debt to EBITDA now set at 3.5 times with a one-period waiver of up to 4.5 times, subject to certain conditions. The US dollar and Australian dollar facilities have also been priced more tightly, reflecting the current market.
Our debt has long-dated maturities with spreads of types of facilities and currencies, enhancing flexibility and currency matching. The earliest bond maturity date is April 2020 and it certainly allows the Company sufficient time to plan for the redemption. The high-yield bond issuer's call can only be exercised in mid-2016 at our discretion, thus allowing us sufficient time to fully explore our self-help measures before we decide on how to proceed with this opportunity. We have both the full discretion and sufficient time in deciding how to use this opportunity should we decide to go that route.
During the month of September Moody's released their rating action of AngloGold Ashanti following their annual review and reaffirmed our Baa3 rating with a negative outlook. There was no change in our rating by S&P in the third quarter, which confirmed the rating of BB+ with a negative outlook early in quarter two.
We have sufficient facilities and headroom in our balance sheet to fund our ongoing operational requirements before and after downside sensitivities within reason. Stronger operational performance certainly coupled with the refinancing of our banking facilities has improved our financial flexibility. As Venkat stated, we generated free cash of about $30m during the quarter and we have reduced our net debt by approximately $153m since the end of last year. Our net debt to EBITDA has improved from 1.86 times at the end of 2013 to 1.64 times at the end of September this year.
Looking ahead to quarter four, the net debt to EBITDA ratio is expected to deteriorate to similar levels as at the end of last year, taking into account that most of the Obuasi retrenchment payments amounting to approximately $160m are expected to take place in quarter four. In addition, there is a higher capital expenditure profile for the quarter and Rand Refinery is expected to draw down on their loan facility to the extent of approximately $50m.
So our covenant of 3.5 times net debt to EBITDA, as you know, is based on a 12-month trailing EBITDA. We have therefore already banked 43% of our debt-carrying capacity as it relates to the June 2015 testing period, which is based just on the first quarter's EBITDA with three more quarters to make up the other half.
Our medium-term leverage target is 1.5 times net debt to EBITDA. This is an aspirational target and certainly we would like to reduce our debt by approximately $1b to take us to our comfort threshold. So our aim is to achieve this $1b debt reduction through a variety of self-help measures, as Venkat elaborated earlier, but quite importantly we are under no external pressure to achieve this. And we believe, seeing that this is an aspirational target, that it can be achieved over the next few years.
So finally, ending on the outlook for the fourth quarter and the full year, importantly for the first time we have improved our guidance on most metrics. Production is forecast to be 1.1m ounces to 1.14m ounces for quarter four and that is as a result of Obuasi's production winding down from this month. Total cash costs are expected to be between $800 to $820 per ounce based on the currency assumptions outlined in the slide.
Importantly, our guidance for the year has been tightened and improved, taking into account a strong nine-month operational and cost performance. Annual production is expected to be between 4.35m to 4.45m ounces and that was despite the impact of the earthquake and the reduction in Obuasi's production.
All-in sustaining cost remains unchanged at our previous guidance of $1,025 to $1,075 per ounce, and that does reflect reduced CapEx and costs.
Total cash costs of $775 to $810 per ounce are based on the assumption provided, and that does include the impact of a stronger than originally anticipated exchange rate. So it's certainly worth noting that these costs are based on a weaker rand assumption than is currently prevailing, and this increase is being mitigated by the savings achieved in other areas, thereby ensuring that our all-in sustaining cost target remains unchanged.
As Venkat indicated, certainly we've seen this reduction coming through in corporate and marketing costs, and therefore we've reduced our guidance to $100m for the full year 2014, which does bank some of the earlier savings of $30m during the year. And certainly you can expect more to come on this front.
Exploration costs reflect additional savings despite the ongoing investment at Nueva Chaquiro and study costs at Obuasi. And certainly we've also tightened up on our CapEx guidance where the CapEx guidance has been reduced then to $1.25b to $1.3b, which does reflect the saving of about $125m largely related to lower Obuasi CapEx and some further rationalization of CapEx across the Group.
So on that positive note now I'll hand over to Venkat. Thank you.
Srinivasan Venkatakrishnan - CEO
Thank you Christine. Just to conclude, and I'm conscious that we've actually overrun our time so I'll be very quick, needless to say, our share price today grossly undervalues the Company's performance to date and the true potential of the Company.
So, to leave you with a few takeaways, firstly, you've seen record safety and sustainability performance from us, and that will continue going into the future.
As we have demonstrated over the seven quarters, operations are firing on all cylinders, delivered the seventh consecutive quarter of strong performance and that has helped us improve our annual guidance for the first time in my living memory at least. We have and will continue to be proactive managers of our balance sheet. That philosophy does not change. And in this regard we have prioritized a range of self-help measures that we have articulated today to reduce the debt in the medium term. And that will enable us to focus on delivery of real returns from the business. Thank you.
Stewart Bailey - Senior VP, IR
Alright. We'll take some questions right out of the gates. If you just identify yourselves and the institution you're with. If you could start with Kane at the back?
Kane Slutzkin - Analyst
Thank you. Good morning. It's Kane Slutzkin from UBS. Just two questions for Mike. If I look at the first nine months of this year versus nine months to September last year, I see the underground grade in SA is up I think 15%, 16%. Could you maybe just talk to that, whether that's sustainable or if there was some base effect in the prior period?
And then just on the technology, and I know you get asked this probably every quarter so I'll just try my luck, I see you're now disclosing the production from technology. So just wanted to know if there's any guidance as to what we could expect going forward and even better if there's a cost number to that? Thanks.
Mike O'Hare - COO, South Africa
Thanks Kane. We've pointed out that we are mining now at reserve grades we've been predicting at Moab Khotsong which is what's driving the big change in grade. The effect of dropping low grade ounces -- and I did indicate we dropped off low grade ounces at Savuka, Great Noligwa and at Kopanang -- is also helping the grade. The work we're doing around decreasing the dilution by attacking stope width, putting waste into reef ore passes and so on, is certainly also having effect on the grade.
So tonnes are coming down, grade's going up. Is the inherent grade there to support the ore body? I think it is. If you look at the development results they certainly are quite good for the quarter.
On the second piece regarding the technology, I didn't report on it this quarter because it's sort of becoming a little bit stale. However, we have continued to drill holes. We have hit a couple of mechanical setbacks in terms of the new machines we've put underground and we're working on those. So as far as costs are concerned, one we're in high grade pillars so the cost per ounce is looking good. Certainly the production holes, as we're calling them now, are making us a profit.
I went as far as presenting at the Joburg Indaba the actual production holes we plan to drill for 2015. So we're committing ourselves to production targets for the rest of the year, and I've no doubt that costs will follow those numbers shortly. But at this stage, no not yet. What's the quantum we're looking at for 2015? I think round about, I guided just under a tonne of gold for 2015 is what we targeted.
Stewart Bailey - Senior VP, IR
Alright. Johann?
Johann Steyn - Analyst
Morning guys. Johann Steyn from Citi. I've just got a couple of questions. The first one is Venkat, at the last quarterly results you also reported about 1.6 times net debt EBITDA. You mentioned the balance sheet is fine and then a month later you announced that you're going to split the Company. Even if you didn't do the split you need $1b in a rights issue. Now again today you and Christine say that the balance sheet is fine. Now why did we have within a space of three months all these conflicting messages?
Srinivasan Venkatakrishnan - CEO
Okay. Let me answer that question. The first one is if you look at it in terms of the proposed restructure -- and I'm glad you asked that question, Johann -- in terms of the proposed restructure, that had certain ambits within which we were trying to implement the proposed restructure. Notably what we couldn't do was to make available SA cash flows to support the international debt-carrying capacity and to position the international Company to be able to fund its projects out of its own cash flows. That drove the capital ask. Where you are correct is we did say that there's an extra $1b than what we would have liked in the business. That hasn't changed.
The only difference which has actually changed is in September we said if we had to implement the restructure, this is the capital ask which the shareholders have to put, and the logic there was that any upside is then kept within the shareholder pool. Here the restructure is not on the table so there's no time limit from that point of view.
We see an opportunity in terms of the high-yield bond when the call matures in July 2016 so we would like to use that opportunity at some point, either in 2016 or beyond. So what we have said is we'll continue to prioritize the self-help measures, which some of these we articulated even in September as what we are going to do. That hasn't changed; we're accelerating those. We have had reverse enquiries from the three which we mentioned, the two in Colombia and one in Obuasi, and what we look at is generating some cash from either JV or selling an operating asset if we have to.
So the need in terms of the cash is there to get us back to our comfort threshold. We have operated at that threshold through the cycle going back in time; we'd like to be back there. Why? Because then AngloGold will have one of the strongest balance sheets in the industry and that positions it in a much better place going forward.
Johann Steyn - Analyst
Okay and then the second question is if you look at page 35 you show that your stay-in-business capital has decreased from about $1.2b in 2012 to about $800m in 2014. Now I don't understand that. Your stay-in-business capital is meant -- at that level you had 4m ounces back in 2012. That was meant to keep you at 4m ounces. Now you're at 4.1m ounces. What has changed? It's down substantially.
Srinivasan Venkatakrishnan - CEO
Okay. A couple of things have changed and let me answer that because this is something we noticed in the graph and we anticipated this question, Johann. Firstly, over this period, if you remember, we were implementing a number of initiatives. There was an Obuasi turnaround project which was capitalized in here as well. In addition to that what we also had was the ERP implementation. That was one aspect. And around what we decided to do in terms of certain of the specific mines which we have actually taken out of the system. The notable one has been Obuasi, if you notice. Obuasi has been the biggest swinger in this.
Also between 2012 and 2014 you do have an exchange rate impact and you can't ignore it. So in absolute rand terms or in real terms there has been reduction in terms of actually looking at is there a better way of implementing the same SIB rather than saying cut 5%, cut 10%. That's not been the approach. It's really targeting around where we see the best bang for the buck in terms of SIB, not compromising on safety, not compromising on asset integrity, not compromising in terms of environmental. So we have maintained this. So the swing has been specific to certain assets and also the exchange rate impact.
Johann Steyn - Analyst
Thanks. Maybe just lastly if I may, for project Zaaiplaats at Moab, is that now going to be classified ?- well, you haven't been spending on that. First of all, what are your plans for that? And if you do go ahead with that, where will that be classified, sustaining or project?
Mike O'Hare - COO, South Africa
It would be project capital. It's a mine life extension. We spend -- we have been spending minimal money this year and that's really looking at the feasibility work. And we continue to do work on the ore body, so we've done a -- we've looked at the data that came to us from the 3D seismics. The technology we have versus when that work was done allows us to get an even better granular feel for the ore body. So we've completed that work during the year. And we've completed the holes into the ore body from underground and from surface.
So we postponed it. At these gold prices it's still -- it's not a dripping roast at these kinds of prices. But we'll continue to work on that ore body to see how we, number one, understand what it is firstly and then see if you apply economics to it when is the right time to start mining that ore body again.
Johann Steyn - Analyst
Okay. Thank you.
Stewart Bailey - Senior VP, IR
Allan?
Allan Cooke - Analyst
Thanks. Hi. It's Allan Cooke from JPMorgan. Just two questions from me please. Mike, could you give us an indication of what you expect the benefits will be? I know it's a work in process and you'll see the benefits flow I think you said quarter one, quarter two next year, but for the SA region, this restructuring, what can we expect in terms of production and benefit, maybe in terms of ISC? I know Ron is targeting 900 or better offshore. What can we expect? What should we begin to factor and what are you targeting in South Africa with your restructuring please?
Mike O'Hare - COO, South Africa
So we're certainly not going to affect the production levels. This restructuring is really around the services supplied to mines. So it's aimed at that more expensive band of services which you normally have.
The details we've done, Allan, but not discussed widely across the organization. Now I need to go through that whole process with the people in South Africa before I can start to talk about numbers. But I think it's enough to certainly beat inflation which is quite a hard thing to do in South Africa. We had enough to beat inflation really this year. We need to beat it next year. So we've been looking at somewhere around 7% to 8% improvements in order to, as Venkat puts it, stand still on the escalator.
Allan Cooke - Analyst
7% to 8% in terms of rand per tonne?
Mike O'Hare - COO, South Africa
All-in, the all-in sustaining cost.
Allan Cooke - Analyst
In terms of all-in sustaining cost. Okay. And then for next year, Ron, you're going to have some production at some cost at Obuasi if you're still treating bits and bobs on the surface. What should we be penciling in, even if it's in a range, at Obuasi please?
Ron Largent - COO, International
I think I'll let Graham answer.
Allan Cooke - Analyst
Graham, I beg your pardon.
Graham Ehm - EVP, Planning and Technical
It's retreatment of the (inaudible) tailings and essentially it's breakeven, Allan. We produce about -- the budget's about 29,000 ounces for next year. So we'll watch that project on the basis of it covering its costs. One of the real motivations for keeping the tailings treatment going is it's in a -- it's reclaiming from an old creek area. It's an environmental issue that needs to be cleaned up. So we'll watch it in terms of it being -- paying its way. It won't do anything more than pay its way.
Allan Cooke - Analyst
Okay. Thanks. That's great. Thanks. And then lastly, the drawdown of the Rand Refinery facility, is there any more color on what's happening in Germiston, that $50m? Do you still expect to recoup any of that or is that the cost to your Company of the [cutting] issues at Rand Refinery now?
Srinivasan Venkatakrishnan - CEO
Allan, if I can pick it up and then I'll pass it across to Christine. That investigation is currently ongoing in terms of their review. But, if you remember, all of the shareholders said that we'll stand behind Rand Refinery in providing any working capital support which is needed. We have actually taken the income statement hit last quarter but the work is ongoing. And in terms of timing of the drawdown, Christine will cover it.
Christine Ramon - CFO
So I think importantly is that the investigation is actually still ongoing. But we do not expect the figure to change and I think importantly is that this $50m reflects our portion of the total facility. So the total facility is about $1.2b and that's our portion of it, and we're expecting the drawdown to take place in November, some time in November.
Allan Cooke - Analyst
Thank you Christine (inaudible).
Srinivasan Venkatakrishnan - CEO
Derryn?
Derryn Maade - Analyst
Hi. Good morning. Derryn Maade from HSBC. Just two quick questions. Firstly on the proposed partnering agreements or options. Could you give us an indication has there been much interest in that? Have you been talking to people?
And then just secondly, you mentioned asset sales as a potential add-on to that. What would be your defining criteria for selling an asset?
Srinivasan Venkatakrishnan - CEO
Okay. Let me respond to you, Derryn. Firstly, there has been a fair amount of interest coming through, both in terms of our Colombian portfolio, and that was even before we made Nuevo Chaquiro public. Certainly now that would attract a fair amount of interest.
In terms of Obuasi as well, a similar story, particularly given, if you remember, Obuasi is still an 8m ounce quality ore body and a 20m ounce resource. The biggest issue which was topping Obuasi has been around the labor retrenchment formerly which ballooned every year and there were a bunch of other issues beyond technical which we needed to address. Now having done the heavy lifting, the reverse enquiries have actually started to come in and there has been some interest in terms of both.
In terms of assets and what is the criteria we're selling, it's very simple. The criteria is it ain't going to be bargain basement sales. In that regard, quite frankly, there are other options one can pursue in terms of the asset portfolio. And it's more going to be driven around in very simple terms. Without giving any particular percentages, if we can get an uplift in our market value and value over the longer term of Y% by sacrificing X% of production and the gap between Y and X is significantly higher, it's worth pursuing.
But there again priority would be given to joint venturing because we keep upside in some of that asset going out in the future. So we are not boxing ourselves into any particular asset by naming it out but we'll look at all of the options.
Derryn Maade - Analyst
Thanks.
Stewart Bailey - Senior VP, IR
Patrick and then Brendan.
Patrick Mann - Analyst
Hi. Morning. It's Patrick Mann from Deutsche Bank. I suppose sort of a follow-on question there. If you look at the $1b that you're trying to raise from Colombia, Obuasi and potentially an asset sale, are you following all three of these at the same time or are you keeping an asset sale on the backburner in case Obuasi and Colombia don't raise the amount you're looking for, or can you just give us an idea of how you rank those options?
Srinivasan Venkatakrishnan - CEO
I think the first ranking of the options would come around self-help measures, which is around managing our cost base, getting more out of the system etc. The second is obviously around the partnership options because there the work has already started. The work around asset is also being looked at; we just want to be careful in terms of timing that we take our time, do it properly and then look at it. But they're all being targeted around during 2015 going into 2016.
Stewart Bailey - Senior VP, IR
Okay. Brendan?
Brendan Ryan - Media
Venkat, Brendan Ryan, Paydirt Media. Venkat, you say you think your share price is way undervalued but it seems to me the entire gold business is way undervalued at the moment. Could I ask you for your opinion on what you think is going on in a situation where you have a gold price on the face of it for $1,000 yet demand is at record or new record level?
Srinivasan Venkatakrishnan - CEO
I think largely -- it's a good question. With regard to the gold price, markets tend to either overrun or correct to both extremes. And if you can look at the COMEX short position, they are at an all-time record here. And there is a lot of negative sentiment around the gold price at present, largely driven on US dollar strength. We're quite cognizant in terms of noise around the US dollar and the gold price in the short term, because you start to see that come through, and generally what you see is the herd mentality. Everybody starts to pull in one direction.
But a couple of comments here. Long term positive fundamentals on gold still remain. At the end of the day, half of the world's population has not stopped buying gold and they'll continue to buy gold. This is India and China.
Secondly, a US recovery cannot be predicated in isolation; it's not an island. There's a lot of traffic that takes place between developing economies and the United States. And in addition to that there is still a lot of debt within the economy in terms of developed countries etc. and the financial system is not as strong as people predict it to be. Number of positive data has come out but when you unpack the data in the United States some of it is based on hard fundamentals but lots of it is based on sentiment, psychology, the index etc, the feedback and so on. All it takes is a couple of -- one or two moves to go the wrong way and you'll see this thing run the other way.
But our job is to ensure that we actually plan and be prepared for the downside by being available to exploit the upside.
Brendan Ryan - Media
So what gold price in dollar terms are you planning for at the moment for the year or two years ahead?
Srinivasan Venkatakrishnan - CEO
Okay. Our reserve shells are still cut at $1,100. We have not changed that at all. And remember, we do get some credit back in terms of currencies given our local producer currencies in South Africa, the Brazilian real, Australian dollar and the Argentinian peso. So that's one factor you've got to bear in mind.
And our business plans -- and we have done an analysis in terms of broker forecasts for next year and also in terms of what other gold companies are using, and we have pegged the number of $1,200 to be the base for next year, 2015, and we will do downside sensitivities and upside sensitivities to those. And there may be specific mines where we may choose to alter those price assumptions given their lifespan.
Brendan Ryan - Media
Thank you.
Stewart Bailey - Senior VP, IR
Thanks. I think we'll call it a day there. Thank you everybody for joining us and we'll see you again next quarter. Thanks.