Stewart Bailey - SVP IR
Good morning, everybody, and welcome to our presentation of our results for the three months to June 30. As is customary, safety is our first value. (Conference Instructions).
A quick look at our Safe Harbor Statement. Certain statements contained in this document, other than statements of historical fact including without limitation those concerning the economic outlook for the gold-mining industry, expectations regarding gold price, production, cash costs, all-in sustaining costs, cost savings and other operating results, return on equity, productivity, improvements in growth prospects and outlook of AngloGold Ashanti's operations individually or in the aggregate, including achievement of project milestones, commencement and completion of commercial operations of certain of our exploration and production projects, and the completion of acquisitions and dispositions, AngloGold Ashanti's liquidity and capital resources and capital expenditures and the outcome and consequences of any potential or pending litigation or regulatory proceedings or environmental health and safety issues or forward looking statements regarding our operations, economic performance and financial condition.
Although AngloGold Ashanti believes the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic, social and political market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings and business and operational risk management.
For a discussion of these factors, refer to our annual report on Form 20F for the year ended December 31, 2013 filed with the US SEC on April 14, 2014. These factors are not necessarily all of the important factors that could cause our actual results to differ materially from those expressed in any forward-looking statements. Other known or unpredictable factors could have material adverse effects on future results. Consequently, readers are cautioned not to place undue reliance on forward-looking statements. We undertake no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of unanticipated events except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to us or any person acting on the behalf of the Company are qualified by these cautionary statements.
This communication may contain certain non-GAAP financial measures. We utilize these measures and ratios in managing our business. Non-GAAP financial measures should be viewed in addition to and not as an alternative for the reported operating results or cash flow from operations or any other measure of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies use.
AngloGold Ashanti posts information that is important to investors on the main page of the website at anglogoldashanti.com under the investors tab on the main page. This information is updated regularly; you should look at it.
The lineup today, Venkat will talk to the highlights of the quarter. He'll pass on to Mike O'Hare who'll talk to the South African operations and also to the earthquake and the recovery efforts that follow on from that which happened on August 5. Ron Largent will talk to the international operations, Graham Ehm to projects and exploration and Richard Duffy to the financials before Venkat wraps up with some concluding comments.
Venkat, over to you.
Srinivasan Venkatakrishnan - CEO
Thank you, Stewart. Morning, ladies and gentlemen. If we can kick off with the slide which recaps on our strategy. If you remember, we put this out during the early part of last year and we have been steadily implementing the strategy. There are five building blocks to the strategy, one around foundation, which is ensuring that we continue to improve our safety record, have good and capable people in right roles and improve our sustainability and our social license to operate.
The second pillar is ensuring proactively that we have got the financial flexibility we need to implement the strategy. The third is around optimizing all forms of costs, whether it's direct cost, overheads and exploration expenditure and capital expenditure. The fourth leg of the pillar is improving the quality of the portfolio by bringing on stream new mines and making the assets work harder. And the final pillar obviously is always reminding ourselves that mining is a long-term game and therefore not to take simple short-term issues but keeping our long-term optionality alive.
The end result is a solid business with strong foundation and fundamentals, a team that is focused on delivery and commitment, ensuring sustainability of our cash flows from a diversified quality portfolio.
If I can kick off with safety, it's an area which we spend quite a lot of time in our presentations, you'll recall. It's an area where we have worked hard over many years to try and improve as we get to zero harm. Our approach has had four parts to it. Relentless and steadfast leadership commitment, whether you take it from the Board level going all the way down to the rock face; in addition to that, improving our systems, processes and procedures and bringing about a behavioral change where everyone looks out for the other when it comes to safety; use of technology to remove people from harm -- Mike will elaborate on these in his presentation -- and getting a better understanding and management of the major hazards which cause high potential incidents, injuries or fatality.
Importantly, we had our first fatality-free quarter in four years. This is the third time in the Company's history that none of our 20 operations and other business units went through without a single fatality. The last time it happened was in 2010 and the one before was in 2008. This was our best second quarter all-injury frequency rate on record at 6.79 and the second best overall. And as you can see from the slide, whilst recognizing one fatality is one fatality too many, you can see the marked reduction in the number of fatalities over the three-year period comparing it to the first six months.
Importantly, none of the three fatalities which took place in the first quarter of this year -- and there were none in the second quarter -- happened at the production areas. They were either in the maintenance and refurbishment areas or project areas, thereby telling us that we need to do better in those areas.
We had 26% fewer injuries this time around and a number of operations broke their own previous best records. Importantly, South Africa posted a record safety performance and a marked turnaround as compared to where they were same time last year.
As a Group, if you were to take the last four quarters, starting from Q3 2013 to Q2 2014, out of these four quarters, three of them represent the best in terms of all-injury frequency rate for AngloGold Ashanti for any non-strike impacted quarter. And importantly, a couple of days ago we broke the longest period without a single fatality in the Group, running at 143 days.
Having said all of that, we still have high potential incidents at our mines and the operating team and the safety teams and the leadership are working harder to learn what happened in these high potential incidents so that we can eliminate the cause rather than simply treat the symptom.
As Tuesday August 5, 2014 humbly reminded us that we can never afford to be complacent when we were struck with an earthquake of magnitude 5.3 when we were in the middle of our presentation to the Board. The South African team, led by Mike, did an excellent job in evacuating every one of our 3,300 colleagues and contractors safely to the surface without any material injury, not to mention fatality.
Turning around to the results, another solid quarter's performance across all of the mines in our regions. Had it not been for teething issues at the Kibali sulfite circuit ramp-up, the numbers would have been better. The good news is we are starting to see good recovery in terms of the sulfite circuit at Kibali and Graham will elaborate on it.
Production for the second quarter was close to 1.1m ounces, ahead of guidance. It was up 17% year on year and 4% on the previous quarter. Even if you strip out the production brought in by the two new mines, Kibali and Tropicana, improvement was about 3% from the other mines combined.
Our total cash cost at $836 an ounce was the lower end of market guidance and 7% lower year on year. Our all-in sustaining cost at $1,060 and all-in cost of $1,192 per ounce represents a 19% reduction and a 29% reduction for the same period last year. Net debt has reduced further, primarily due to the asset sale proceeds from Navachab and our net debt to EBIDA covenant has improved to 1.73 times, and Richard will talk about the refinancing that was implemented recently.
The quarter has been noisy when it comes to earnings. On a normalized basis the earnings were at $76m for the quarter, coming on the back of production despite lower gold price and inflation in winter power tariffs. The impact of Kibali on our earnings compared to the same quarter -- compared to the first quarter of 2014 was around $20m and on costs was around $17 an ounce. We hope to claw that back as we go into the third and the fourth quarters.
Graham will cover in his presentation we have signed up a new gas pipeline project for the Australian operations. That will reduce our cash cost in the Australian operations by between AUD25 to AUD30 an ounce and opens up really good upside for us. And at this stage, subject to any further inspection that Mike needs to implement and look at in terms of the ore passes of the South African operations, full-year production outlook remains intact.
Moving on to the next table, and this is a table which we put up at each presentation. It says a thousand words. It compares year-on-year performance, both with regard to quarter just gone and the same (technical difficulty). We have managed to keep a lid on the nominal cost but we are starting to see inflation come through which will impact our nominal costs going forward but the P500 team is working very hard to pull (technical difficulty). And our all-in cost is down 30% (technical difficulty).
Mike O'Hare - COO South Africa
(Technical difficulty). I'll come back to safety on the next slide but let me first deal with production and costs for the South African region. The South African underground operations improved markedly over the first quarter in terms of their production output. They were some 26% higher in volume then they were in Q1. This is to be expected given the amount of shifts we were able to work in Q1 versus Q2. So the productivity improvement there was fairly significant.
We also had lower than Q1 safety stoppages which helped the production. We did have a grade decrease. The production levels offset this and our gold production from underground was 15% higher than the previous quarter.
Turning to Moab Khotsong, Moab Khotsong's grade declined slightly during the quarter and, as we've said over a number of quarters, we will fluctuate within this range, some 5% to 10% higher and then coming off the same amount. But we should remain within this range for a number of quarters going forward.
The big work at Moab remains the integration between the Moab Khotsong mine and the Great Noligwa mine, primarily in order to ensure that the Great Noligwa mine remains profitable. And next quarter I'll give a little bit more detail on how that work is progressing. Suffice to say that all of the employees at Great Noligwa are now going underground via the Moab Khotsong infrastructure.
Turning to mine waste solutions, mining grade and recovery remain our key challenges at that operation. However, the uranium circuit has now been reconfigured. If you remember, we did commission uranium circuit. We then had an element of peg robbing occurring because of the chemicals we were using in the uranium circuit. We've now reconfigured that uranium circuit and we should be producing uranium at the end of this quarter and into Q4. That not only produces additional uranium but it also should give us an increase on the gold recovery and also improve the margins at that operation.
If I turn to safety now, just following on from what Venkat has said, certainly the tone is always set at the top of the organization and Venkat mentioned the involvement of the Board, but I need to make specific mention of Venkat's personal involvement. Setting the vision is the easy part; showing everybody how much you care and how passionate you are about getting towards zero harm is incredibly important and certainly the South African team thanks Venkat for his personal input into making sure we have a leader who really believes and supports us in going this way.
We've had 14 months now without a fall of ground fatality. And we always say touch wood. In that period we have however had two fatalities which is certainly two too many. We had a number of high potential incidents which could have resulted in fatalities but I think the harder we practice, the luckier we're going to get.
And what I've been saying consistently around introducing technology, whether that be the more longer-term technology or whether it be quite simple technology in terms of bolts, meshing and lacing, nets, locomotives that can detect other locomotives, whether that be auto-coupling or technology that allows us to determine where people actually are underground in case of an event like we had with the earthquake, all of those technologies help us. Our systems work, our BPF work continues to give us an element of improvement within the safety. Work around analyzing the key elements of critical controls that management needs to be watching continuously to ensure that our perils don't get out of hand are certainly well in place. And largely but, certainly beyond leadership, probably the most important piece is our engagement. It's working with people.
That work continues together with incentive systems then employees can really see in their pockets the benefit of working safely. This has allowed us to achieve many milestones across the South African region and long may that continue.
If I turn to the earthquake, what I have here is a map of the Vaal River mines. The earthquake occurred in about a 3-kilometer zone at about anywhere between 3 and 6 kilometers below our operations. A 5.3 event, this size event and the depth of this event lead us to believe that this is an earthquake-type event. Clearly, the work that we had to put in place to evacuate our people was the most critical work we did.
And the sequence of events, if I move to the next slide, was around really getting the Eskom infrastructure back up and running, and they did a fantastic job in that because a number of their substations were damaged by the event as well; ensuring that our shaft infrastructure was intact so that we could hoist our employees; then successfully hoisting all of our people, a number of minor injuries and certainly a number of cases where we needed to do immediate trauma counseling. These were the events that we immediately undertook as part of our normal safety protocols.
We then had to look at the next steps in the process leading up to where we are today, and that's the work that we're busy with at the moment, which really goes around primarily ensuring that our key infrastructure, the shafts, are intact, which they are; we've examined them in detail.
Secondly, understanding that it's safe enough to put people back underground. And the way we do that is to have a look at how the seismic response post the event decays. You'll be aware that you have a number of seismic post events. There's a rule that's followed in Japan called the Omori rule and our seismic response post this earthquake is following that and we now believe it's safe to put people back underground. And in fact this morning we have our first crews going back into the working places to examine whether they are still intact or what work would need to be done to make them safe.
The next response is around the working with the community and the local municipality to ensure we work well with them and then making sure that our employees are aware that we do have counseling services available. Our supervisors have been specifically briefed to ensure that they know what to look for from the point of view of post traumatic stress.
We estimate a loss of around 30,000 ounces as a result of this event. Our mine waste solutions complex was knocked out due to the fact that the Eskom power stations were down. Certainly our Kopanang mine stopped for a day and Moab Khotsong Great Noligwa complex will only start producing in a ramp-up fashion during this week.
Key infrastructure we haven't been able to examine yet are ore passes, as Venkat mentioned, and we'll only know whether there's been damage to those once we start to pull rock through them again. So we've put an estimate of 30,000 ounces. Clearly we'll have to revisit this as we ramp up to normal production.
Okay, the world still continues. At the West Wits we continue with our technology implementation. As reported last quarter, we're busy ramping up on sites; we now have four sites running in the Tau Tona shaft pillar area and we have another site running in the very narrow reefs at Great Noligwa. This reef is a reef that we haven't been able to mine successfully due to its narrowness. We hope that this technology will show us that by mining only the gold, but all of the gold, that we'll be able to bring this reef band to account. So very exciting times there.
The backfill plant is now commissioned underground, semi-automated. For those of you who've been underground, you saw that our backfilling was a really labor intensive business. That plant's now operating fairly well. So happy to report that that work is going quite nicely.
With that I'd like to hand over to Ron Largent to take you through the international operations.
Ron Largent - COO International
Thank you, Mike, and good morning. I'd like to take you through the quarter two operating results for Continental Africa, Australia and the Americas region. But before I comment on them, I guess I'd like to make a statement around safety. It was previously covered by Venkat but I wanted to reemphasize the fatal-free quarter and the best quarter two performance on record for AGA. We must enjoy these metrics but I just want everybody to understand we do understand the work that it takes to continue meeting and exceeding our targeted improvements in safety.
Secondly, each quarter I make comments around the cost rationalization work and ask you to continue to watch quarter on quarter the outputs. As I do each quarter, I try to set a context of where we're at. This work was communicated in mid-2013 and had a target of removing $500m from our operating costs. The timeframe we gave was an 18-month timeframe to remove these costs, ending in December 2014.
At the end of 2013, we had documented the removal of a certain value and we defined the remaining value and put that into our operating plan. Currently, our comparisons to our expenditure plan is 3% better than plan. So with that said, our current business plans contain the $500m reduction and, if we can continue on that path, as you'll see by the comparison to second quarter 2013, we will have met our commitments.
There is however one area that I think we should point is that over the last year and a half we've been able to contain by this work and this process, the inflationary increases. They're beginning to creep back into our operations through labor, power and fuel costs primarily. So we continue to create this positive outcome in the operations but I know it can't last forever as the inflationary costs start keeping up with this.
So to go over Continental Africa region, production for quarter two was 395,000 ounces at a cash cost of $846 compared to 343,000 at $883 for second quarter 2013. The contribution for this improvement was primarily from Kibali mine and the improved grades and throughputs at the Siguiri mine in Guinea for this quarter-on-quarter comparison difference. But at Siguiri we produced 80,000 in quarter two at cash costs of $777 compared to 62,000 in quarter two 2013 at $850 an ounce.
Iduapriem mine had a respectable second quarter, producing 47,000 ounces at a cash cost of $911 an ounce. And at the Geita mine in Tanzania second quarter was also successful at 110,000 ounces at $667 an ounce.
Now the Americas region. Production for quarter two was 229,000 ounces at a cash cost of $765 an ounce compared to 235,000 ounces at $733 an ounce in quarter two 2013. We had two primary impacts in the region. We had to alter a stacking plan at the Cripple Creek mine in Colorado, changing the ounce production profile that will be regained in the second half of 2014, and we had a geotechnical challenge at the Cuiaba mine in Brazil that we will be recovering those grades in the second half of 2014 also.
But in Brazil, AngloGold Ashanti Mineracau operations produced 80,000 ounces at a cash cost of $717 an ounce compared to 76,000 ounces at $858 an ounce in quarter two 2013. And Serra Grande in the north of Brazil produced 30,000 ounces at $879 an ounce. We are continuing to process lower grades at Serra Grande, as planned, 17% year on year lower grade, and this is primarily due to the depletion of the Mina III mine, the quartz ore body that has been in depletion for years. Considerable work is on the new hybrid ore body known as Inga, which has similar geologic characteristics and is currently in our production profile for 2016.
In Argentina, Cerro Vanguardia mine produced 62,000 ounces at $682 an ounce and the work there is to increase the availability and volume of underground ore tonnes in the coming quarters of 2014.
The Australia region. Production for quarter two 2014 was 155,000 ounces at a cash cost of $850 compared to 50,000 ounces at cash costs greater than $1800 in quarter two 2013. This improvement was primarily due to bringing the Tropicana mine on that wasn't in production one year ago. But production at Sunrise Dam was 62,000 ounces this quarter versus 50,000 ounces a year ago. Production costs at Sunrise have also come down significantly from $1700 to around $1300 during quarter two. These costs will continue to improve as the new production profile from the underground mine are maximized and the ore body grades are realized. Grade improvements were 12% higher than the previous quarter at Sunrise and what's very important is the site has met its 200,000-tonne-per-month ore extraction for the last three months. Sunrise Dam is on a good run and we're working on these costs very aggressively.
Attributable production from the Tropicana mine was 93,000 ounces for quarter two 2014 at a cash cost of $498 per ounce. Although the site has had associated start-up challenges, the productivity rates are being achieved. I know July isn't in the quarter we're talking about but July was a tough month for Tropicana. But with the planned or unplanned scheduled downtime and a geotechnical challenge in the pit, we will still meet our quarterly objectives in Quarter 3.
I say that because as things come out we still have a lot of work to do at Tropicana and I think the team here is very excited about the ultimate outcome of Tropicana. We're meeting the objectives we've stated with the capital investment we've put in, even though we have had a couple of tough months at Tropicana.
So with that said, I will turn it over to Graham.
Graham Ehm - EVP Planning and Technical
Thanks, Ron. This morning I'll provide an update on our projects and also on our greenfield exploration. Firstly in regard to Kibali, solid progress continues to be made at Kibali. During quarter two the prime focus has been on the completion and the commissioning of the plant sulfite circuit. The secondary crushing circuit, floatation circuit, regrind mill and pump cells were completed, and commissioning and ramp-up commenced, resulting in gold production of 91,000 ounces on 100% basis.
The Nzoro hydropower station was completed and commissioned and is being integrated with the diesel power station at a pace that's commensurate with the stabilization of the process plant. Development of the underground mine is going especially well. Lateral development of the first load level of the shaft has just been completed and sinking has resumed. The depth of the shaft now is about approximately 520 meters with a target depth of 760.
A notable milestone has been achieved with the development off the declines in the cross-cuts into the top of the 5000 load, and that's the diagram included on the slide here. The ore body has been intercepted where expected and at the same tenor as expected.
In regard to Cripple Creek, you will recall that at Cripple Creek the mine life extension project actually consists of two elements. The construction of a mill to treat higher grade and partially refractory ore that is within the ore body and the construction of a new valley leach facility. Mill construction remains on schedule for first gold at the end of this year and approximately 500,000 tonnes of ore has been mined in preparation for commissioning and ramp-up. The valley leach facility construction remains on schedule for completion in mid-2016. Both the mill and the valley leach expansion are on budget and on schedule. Overall budget for the project was about $585m.
In regard to Obuasi, last quarter I spoke about the change in approach of Obuasi, that Obuasi has moved from an operation to a project in order to deal with this change. During the quarter we've made considerable progress in putting the plans in place ready for action. The amendment to the program of mining operations has been submitted to the minister for lands and natural resources. The environmental management plan that accompanies this amendment has been submitted to the EPA.
As you would appreciate, this is going to be and is a very substantial change. Consequently, very close communication has been made with key stakeholders and this work's being led by David Noko, our EVP Sustainability. The program involves a very substantial slowdown in activity and a commensurate reduction in the workforce. The footprint of the operation is being rationalized and contracted to the southern end of the mine. The works are progressing quite well.
A particular milestone, if I move to the next slide, was achieved this month. We are continuing with the Obuasi decline development, and the decline broke through just this month. So we -- now we have decline access from surface through to the upper levels of the underground mine. Whereas previously all access, men and materials, was by the shaft.
Now in -- turning to green fields exploration and here I'll only talk about Colombia. In Colombia, at the new Nuevo Chaquiro copper gold discovery, impressive drill results continue to be made. This plan shows the surface projection of the 0.45% copper envelope in the grey dash line. And the surface projection of what appears to be a high-grade core is shown in the red dash line.
Drill results from the last quarter were quite impressive, with 810 meters at 0.78 grams per tonne and 1.65% copper. And 852 meters at 0.61 grams per tonne at 1.19% copper. These intercepts, when compare with other porphyry deposits are quite significant.
The cross section in the next slide, though this is early days and based on relatively limited drilling, is showing the outline of the 0.45% copper load in the light yellow and, in more of a gold color -- I don't know whether the colors are coming out very well there -- shows the higher-grade component.
You'll note that Nuevo Chaquiro is a blind discovery and is about 250 meters below surface. The drill results here support the potential for about 200m tonnes of a high-grade cap, at about 2% copper, between about 350 meters and 450 meters of depth.
To try and put that in perspective, and please appreciate it that it is early days, but it appears that Nuevo Chaquiro is shaping up into a 10m- to 20m-ounce gold-equivalent ore body but, interestingly, a 7b- to 10b-pound copper-equivalent ore body. We hope to be able to announce a maiden resource for Nuevo Chaquiro towards the end of the year.
Thanks very much, and now I'll pass over to Richard for the financial update.
Richard Duffy - CFO
Thank you, Graham. Our ongoing focus on costs across the business is evident in the 19% decrease in our all-in sustaining cost, from $1,302 an ounce in quarter two last year, to $1,060 an ounce in this second quarter, driven by lower operating corporate and exploration costs and lower sustaining CapEx.
All-in sustaining costs increased by 7% over quarter one, and quarter one we were at $993 an ounce. I had indicated at our last quarterlies that we expected our all-in sustaining costs to increase to between $1,100 and $1,145 an ounce, as a result of stronger local currencies and increased operating costs relating to power increases, winter tariffs and higher fuel costs, together with adverse ore inventory and consumable store movements. I'd also flagged some timing differences, or some timing around our stay-in-business capital, and indicated that we would see stay-in-business spillover from Q1 into the remainder of the year.
Lower-than-anticipated movements in our inventory, services and stay-in-business spend, coupled with the benefit of higher production, enabled us to deliver a lower Q2 all-in sustaining cost that we had guided at the end of quarter one.
The 29% year-on-year reduction in all-in cost, from $1,679 an ounce, to $1,192 an ounce this quarter reflects the all-in sustaining cost improvement and also the reduced project capital, following the completion of Tropicana and the first phase of Kibali.
Turning to earnings, there were a number of normal transactions that impacted on our earnings during this quarter. In order to provide a better understanding of our underlying earnings performance for the quarter, we have normalized our adjusted headline earnings.
The major adjustments made in moving from the negative $4m Q2 adjusted headline earnings, to our normalized adjusted headline earnings of $76m, related to operational and corporate redundancies of $27m, primarily as a result of our ongoing restructuring at Obuasi, and closure and termination costs of $27m, $24m of which related to Yatela.
A reconciliation of our adjusted headline earnings to normalized adjusted headline earnings is set out on page 3 of our quarterly report. Earnings this quarter improved by $67m over the same period in 2013, with higher production and lower corporate, marketing and exploration costs more than offsetting the lower gold price and inflation.
Our quarter-two normalized adjusted headline earnings of $76m are $43m lower than the first quarter this year, driven largely by higher operating costs, stronger local currencies and lower income from associates, mainly at Kibali.
You will have seen the announcement around the provision of a ZAR1.2b facility that we extended to Rand Refinery, along with the other shareholders. We have adopted a conservative accounting approach relating to this, in that we have assumed the facility will be drawn, but will not be repaid, and have, accordingly, made a provision of ZAR546m against this. This amount is included in our headline earnings, but has been stripped out of adjusted headline earnings. So if you are looking for what that number appears, it's in the $85m against our share of associates and joint venture line in the Group income statements.
Stronger operational performance, coupled with the refinancing of our bank facilities has further improved our financial flexibility. On -- now on our financial flexibility, I think. Thank you, next slide.
We generated free cash of $34m in quarter two and reduced our net debt by $101m, compared to the beginning of the year, or the end of 2013. Our net debt to EBITDA has improved from 1.86 times at the end of 2013, to 1.73 times at the end of June this year.
You would have seen that we recently signed new revolving credit facilities for both our dollar and Australian dollar facilities for a further five-year period. The US dollar RCF will remain at $1b and continues to be undrawn. The Aussie RCF facility will reduce from AUD600m to AUD500m and is currently AUD370m drawn.
We are in the process of finalizing an amendment to our ZAR1.5b facility, to reflect the same terms as we have in the dollar and Australian dollar facilities. All of these facilities incorporate a looser financial covenant, which is now set at 2.5 times, as compared to 3 times previously. And we also have a one-period waver of up to 4.5 times, subject to certain conditions. The US dollar and Australian dollar facilities have also been priced more tightly, which reflects the current market.
At the end of July, Moody's completed their credit review of AngloGold Ashanti, and left our rating unchanged at Baa3, but on a negative outlook.
Notwithstanding our significant operational improvement and cash generation, which totaled $56m in the first six months of this year, and that excludes the $105m from the sale of Navachab, the funding requirements associated with the completion of our capital projects, and that's primarily CC&V mine life extension and phase 2 of Kibali, together with the funding requirement to implement the Obuasi amended program of mining operations that Graham spoke to earlier, preclude us from declaring an interim dividend.
My final slide talks to our outlook for the third quarter. Production is forecast to be slightly down on Q2, at between 1,060 ounces and 1,090 ounces (sic - see slide 32 "1.060m to 1.090m"), as a result of Navachab's production being excluded following its sale, Obuasi production winding down and the impact of the recent earthquake at our Vaal River operations, which Mike spoke to during his presentation.
Total cash costs are expected to be slightly up on quarter two, at between $850 to $890 an ounce, primarily due to mid-year wage increases, stronger local currencies and higher cost profiles in South Africa with a full quarter of winter power tariffs.
All-in sustaining costs are projected to be between $1,100 and $1,150 an ounce, negatively impacted by our stay-in-business spend profile. Importantly, our guidance for the year remains unchanged based on our current understanding of the impact of the S.A. earthquake, at 4.2m ounces to 4.5m ounces, and $740 to $790 an ounce based on the assumptions provided.
It is just worth noting that these costs are based on a weaker rand assumption than is currently prevailing.
I'll now hand you back to Venkat, thank you.
Srinivasan Venkatakrishnan - CEO
Just in terms of conclusion, wrapping up on a few slides. Without compromising safety, we have pulled together six quarters of consistent good delivery as a management team. Over the past six quarters we have shown safety improvements. We have shown production growth, not just from the two new mines coming on stream, but even from our existing assets. We have shown costs decline in a number of areas and, importantly, the turnaround in the cash burn rate to more a modest amount of cash generation.
Having said all of that, whilst recognizing that as a team and as everyone of our 60,000 employees have done a wonderful job in helping us get through these six quarters, headwinds continue to remain formidable in a business like ours, with 20 operations spread across the globe. So there may be events which may cause us to miss a quarter here or there, but certainly the overall trend is heading in the right direction.
Just recapping on some of the cost reductions which we have achieved, this just gives you looking back the scale of the reductions which we have had to do. The cost-saving efforts have been marked. This has been possible as a result of a focused exploration strategy to deliver best value, which has been implemented by Graham and the two operating teams led by Ron and Mike. On the corporate cost side the restructuring, removing inefficiencies, eliminating duplication and keeping a lid on the indirect spend, headed by both Italia and by Ria, have actually certainly paid off. And you can see that we have taken our corporate costs in particular back to levels that prevailed several years ago.
In terms of our half year, if you recall, we did say that the first half of 2014 tends to have some timing benefits, so our annual numbers still stand; exploration and evaluation costs of between $150m to $175m for the year, and corporate costs of between $120m to $140m for the year.
On capital expenditure, to recap, 2012 and 2013 were heavy capital-spend years, as we were building Tropicana and Kibali. We are starting to see the project capital reduce and cash flows come in from the two projects. Whilst our sustaining capital for 2014 is broadly at the levels at 2013, the project capital of $400m for the year, which is a significant reduction from the previous year, is focused on Cripple Creek and Victor mine life extension project, Mponeng below 120 level, Kibali underground and the Obuasi decline project, some of which Graham spoke to.
Finally, if we can take a look at the score card, if you remember when we set out our strategy it was as early as the early part of last year. This score card shows what we have been able to achieve together as a team, in the past 18 months, despite some tough conditions. It has been certainly a baptism of fire for every one of us. But clearly it shows that more work remains in certain areas. On safety and environment we have had some very good trends and our environmental incidents have certainly reduced.
On the balance sheet, Richard, Rob and the team, along with good legal support, have been able to pull down our -- the debt levels from where they would have otherwise been had the expenditure rates continued and, importantly, get more tenor, liquidity and flexibility in terms of our existing facilities. But we'd be the first one to admit that the high debt levels and interest burden continue to engage our attention and financial flexibility is going to be a continued area of focus for us going forward.
On the cost side, our all-in sustaining costs and all-in costs have improved significantly year on year. Our overhead and exploration costs have come down significantly and our CapEx has fallen markedly as compared to [2014].
Then in terms of looking at our portfolio, certainly the operating team, led by Ron, Mike and Graham, has certainly done a wonderful job in holding the projects together, getting them on stream to pour gold, and also getting the best out of assets. Charles and the team executed the sale of Navachab. We've received $104m of net proceeds as at June 30. The agreement provides for a purchase adjustment, which will be reviews during the third quarter based on events that transpire as of the closing date.
Cripple Creek and Victor expansion is on track and on schedule. Our focus in terms of portfolio is around the Obuasi restructuring and we continue to implement the amendment to the program of mining operations. We have submitted the approval, as Graham mentioned. A stakeholder group has now been formed and we'll engage with them in terms of the detail.
In terms of the long term, the focus on greenfields is still there, as Graham would have outlined; some very good discoveries in Colombia. Ron has outlined some good discoveries in Brazil as well. And we have exited from certain countries where we didn't see good value for money.
And the South African technology and innovation project makes progress and we are now increasing the number of production sites and number of holes which we are drilling, to extract, as we say, safely, all of the gold, only the gold, all the time.
Just before we hand over to Q&A, this is Richard Duffy's last quarterly presentation as CFO in AngloGold Ashanti. Richard has had a number of roles within the Company and at a critical time, when we needed a CFO at short notice, he stepped in to do the role of CFO until a long-term successor was found by the Board. He fulfilled his role exceptionally well during challenging circumstances, and we thank him for all of his help and wish him well in his future efforts.
On the same note, we'd like to welcome Christine Ramon to the role of CFO, effective October 1, 2014. Christine is here in the front row. She brings to the team significant experience as CEO, CFO and good experience both in terms of the accounting and finance profession. She's started to go through her induction at AngloGold Ashanti before her start date, and I'm pleased to see that the file -- the CFO file is getting bigger every trip she makes to the office.
So with those few words I'm happy to take any Q&A.
Stewart Bailey - SVP IR
All right, and if we can start with Johann, Citi Bank.
Johann Steyn - Analyst
Thanks, good morning guys. Just quickly on Obuasi, three months ago we sat here and I asked the same question -- you basically say you are going to focus on the southern part of the mine. But how is production-cost CapEx going to look for the mine over the next 18 months to 24 months?
Srinivasan Venkatakrishnan - CEO
Johann, the answer hasn't changed compared to what I gave you. It will not be the most helpful answer for you at the current state. We did say we will actually update you in terms of our guidance when we announced our year-end results for 2014 in February. At that stage the team would be better informed in terms of what consents we have got and where we are taking the production going out in the future.
But initial indications based on the approval of the plan you've got to factor in an element of quieting down of the mine, with production coming in primarily from surplus sources from just one particular surplus source. But the numbers which you can safely put in is around $220m for retrenchment costs. For the full year, as at the end of the last quarter, that can be factored in. And we did say as the production winds down there's about $70m to $80m of working capital that needs to get paid out.
But what you can see in the slide and, unfortunately, it might have missed everybody's attention, is the production has been improving and Obuasi in the last two quarters, and the costs have been coming down. That has helped pull down the bleed rate and that always helps. But certainly we won't keep you waiting in patience beyond February of next year.
Stewart Bailey - SVP IR
Thank you. Kane, UBS.
Kane Slutzkin - Analyst
Hi, good morning, Kane Slutzkin, UBS. Just, Richard, on your net debt to EBITDA, what is long-term target multiple? What are you ideally comfortable with, and are you confident the current measures you've got in place are going to reduce gearing levels?
Richard Duffy - CFO
So I think if you look at our historical net debt and the net debt to EBITDA gearing levels, we've typically been below 1.5 times in terms of the net debt to EBITDA. So I would say if we are looking at what is more comfortable, I think less than 1.5 times, and from a net debt point of view we'd probably looking more comfortable at $2b net debt, rather than something closer to $3b, which is where we are currently.
Kane Slutzkin - Analyst
Okay, so you are getting some positive cash flow, but that number is pretty -- been pretty sticky. Just wondering what sort of measures outside of what you're doing now are you potentially looking at, or will be looking at, to get that down because it's clearly been a headwind for you and you've just mentioned it now. So, yes, just interested to see how you think of that going forward.
Richard Duffy - CFO
So I think the current measures we'll continue implementing, and we are seeing benefit from the costs coming down. So that will continue unabated and Ron continues to do his work with the team on that.
Venkat has mentioned, and it's one of the key focus areas in the strategy, is to also continue to look at the portfolio. So that will continue as well in terms of ensuring we have a portfolio that can generate sustainable free cash. I don't know if you want to add to --?
Srinivasan Venkatakrishnan - CEO
I think in reality we've covered it, and I don't want to -- keep going back to the same point. We continue to look at options in terms of how we can reduce the debt but, importantly, we are in a volatile gold price environment, so what we want to have is adequate flexibility from a covenant point of view, and a liquidity point of view whilst we do that. It just gives you a time to look at all conceivable options.
Stewart Bailey - SVP IR
Anyone else? Adrian, Standard Bank.
Adrian Ince - Analyst
Morning, gentlemen. Three questions, if I may. Firstly, there's an article this morning in the Business Day concerning Gold Fields and their non-compliance to section 93 of the MPRDA. Have you received anything similar from the DMR, and does it pose a real risk to you?
Second question, around your corporate refinancing, you've opted for more flexible debt covenant ratio. Is that going to be more expensive and then could you answer that in terms of interest charges in dollars per ounce?
And then third question, for Mike, you talked about Great Noligwa and how you are accessing it through Moab. Is that including ore tonnages, and does that place a capacity constraint on Moab? And what does that mean for PZ, Project Zaaiplaats, if you were to go ahead? Thanks.
Srinivasan Venkatakrishnan - CEO
If I can pick up the first question, no, we haven't received a letter. We can't comment on Gold Fields individual circumstances. We read the report the same time as you read it this morning. What we can comment though is that we've had certainly three audits by the Department. One was as part of Moloto Solutions audit back in 2013, at the end of 2013.
In addition to that we had audits during May and also in August, and you would be able to pick up booklets out here which shows what [SLP] commitment we have made, including our own self-assessment of the score cards. In addition, as part of Mandela -- the celebration -- our Chairman went out to the production sites and the feedback we have had from the communities has been extremely positive.
So we have not picked up any negative noises. On the other hand, we've just had positive feedback come through from the communities in the ground and the department.
Richard Duffy - CFO
Then Adrian, on the looser covenant -- the refinancing of the revolving credit facilities, that has actually come down in terms of cost. So we priced that more tightly than we had the previous facility. So that's costing us less, rather than more, for a slightly looser covenant.
And your last question, on interest costs, we are paying around $250m annual in interest costs, so call it $55 an ounce, as a round number in terms of interest costs.
Adrian Ince - Analyst
That cost coming down, is it just a function of the market?
Richard Duffy - CFO
Primarily a function of the market, so we were able to price more tightly as a result of that.
Mike O'Hare - COO South Africa
Adrian, around the Great Noligwa and Moab Khotsong integration, you'll remember that Moab was actually developed from Great Noligwa, and it's virtually one mine. So from an infrastructure point of view it's pretty easy to put the two mines together.
The long-term plan, which we will finish by the end of next year, is to have the rock and services coming out of Moab Khotsong as well, and the barrels at Great Noligwa would really be able to go into care and maintenance. And obviously we will be able to remove a significant amount of cost. So the people are already going down at Moab Khotsong. By the middle of next year we will have the rock coming up, it's Moab as well, and be able to go into care and maintenance at Noligwa.
Your second part of the question is the effect in terms of capacity at Zaaiplaats. There's a number of ways you can access the Zaaiplaats ore body. The previous presentations we've shown an option that accesses from Moab Khotsong. You can, however, access via Kopanang as well. We decided that we'd postpone the Zaaiplaats expansion; we announced that -- I think it was just over a year ago. And we continue to look at options, which include the capacity constraints on whether and when we start the Zaaiplaats project up.
What's complicating that is there's a nice resource developing directly below the Moab Khotsong ore body, which we are currently drilling, which seems to have quite a lot of potential. We are just not sure of the scale of the depth. So we need to consider whether it's a Zaaiplaats or whether we go deeper directly below Moab Khotsong. But I'll firm up on that once we've done enough drilling to choose between the two projects.
Adrian Ince - Analyst
Any numbers on the size of that resource potential?
Mike O'Hare - COO South Africa
No, it's too early for that.
Adrian Ince - Analyst
Thanks.
Stewart Bailey - SVP IR
Anyone else? Yes.
Johann Steyn - Analyst
Sorry, Johann Steyn again. Maybe Richard, what's your next job going to be, the fact that Christine took it?
Richard Duffy - CFO
You'll have to watch this space.
Johann Steyn - Analyst
Still within AngloGold?
Richard Duffy - CFO
I'm going to take a little bit of time out to look at options, so I'm not rushing back into anything immediately.
Johann Steyn - Analyst
Thanks.
Stewart Bailey - SVP IR
Patrick Mann, Deutsche Bank.
Patrick Mann - Analyst
Hi, morning. Just on the conversion of the plant to natural gas in Australia. Is that funded by the provider and what sort of capital cost is there in modifying the plant to run on 100% natural gas, if any?
Ron Largent - COO International
If I can pick that up. Broadly, the project involves a pipeline, which steps off from the Murrin Murrin gas lateral, and about 60 kilometers through the Sunrise Dam and then about another 220 kilometers out of Tropicana.
The project involves three elements. One is the pipeline and its construction, done through Australian Pipelines Association, and it involves no capital cost to AngloGold. And the capital costs and operating costs are paid for it through a transport fee during the -- for the delivery of gas, so on a dollar-per-gigajoule basis for delivery to both Sunrise and Tropicana.
The other element is the purchase of gas from the wellhead, and that's done on a gigajoule basis.
And then the third element is the conversion of the existing power stations to gas. And that will be done through the IPP providers at each of the mines. So none of the conversion to gas involves any capital cost, and is covered in operating cost. The net/net of that is about $25 to $30 an ounce, for both those mines.
Graham Ehm - EVP Planning and Technical
And importantly --
Mike O'Hare - COO South Africa
Just to clarify, they would be in -- sorry, go on. Graham.
Graham Ehm - EVP Planning and Technical
Importantly, converting to gas is a comparison to the current cost of power generation now. Converting to gas will be, in Australian dollar terms, to a proportion of CPI, takes out any volatility in regard to diesel price movements, or exchange rate movements on fuel for the long term. It also removes about 50% of our trucking of fuel out to both those operations.
Srinivasan Venkatakrishnan - CEO
There will be an impact on the balance sheet, from an accounting point of view. Richard will elaborate on that.
Richard Duffy - CFO
Yes, so just when that facility is handed over from an accounting treatment point of view, about $80m will come through as capital, in terms of the treatment. So whenever that -- I think that's in 2016, or --
Unidentified Company Representative
(multiple speakers).
Richard Duffy - CFO
So just to flag an $18m capital impact.
Patrick Mann - Analyst
Is that non-cash, so --?
Srinivasan Venkatakrishnan - CEO
Yes, effectively you gross up both sides, and you amortize one and the debt comes down.
Patrick Mann - Analyst
Great, thanks.
Srinivasan Venkatakrishnan - CEO
Similar to the lease of this building.
Stewart Bailey - SVP IR