  • Fundisa Mgidi - IR

  • Good morning everyone. My name is Fundisa Mgidi, Investor Relations. Welcome to the AngloGold Ashanti quarter one 2014 results. (Conference Instructions). The presenters for the day, we'll start with the introduction by Venkat, which will be followed by Mike O'Hare on the South African operations, Ron Largent on international operations, Graham Ehm on projects and Richard Duffy on financials, and thereafter it will be a conclusion by Venkat again. Before I call Venkat I'll read the Safe Harbor statement.

  • Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, cash costs, all in sustaining costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects and outlook of AngloGold Ashanti's operations, individually or in the aggregate, including the achievement of project milestones, commencement of completion of commercial operations of certain of AngloGold Ashanti's exploration and production projects and the completion of acquisitions and dispositions, AngloGold Ashanti's liquidity and capital resources and capital expenditures, and the outcome and consequences of any potential or pending litigation or regulatory proceedings or environmental, health and safety issues, are forward-looking statements regarding AngloGold Ashanti's operations, economic performance and financial condition.

  • These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause AngloGold Ashanti's actual results, performance and achievements to differ materially from the anticipated results, performance or achievements expressed or implied in the forward-looking statements.

  • Although AngloGold Ashanti believes that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other things, changes in economic, social and political and market conditions, the success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, and business and operational risk management.

  • For a discussion of such risk factors, refer to AngloGold Ashanti's annual report on Form 20-F for the year ended 31 December, 2013, which was filed with the United States Securities Exchange Commission, the SEC, on April 14, 2014. These factors are not necessarily all of the important factors that could cause AngloGold Ashanti's actual results to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also have material adverse effects on future results. Consequently, readers are cautioned not to place undue reliance on following -- on forward-looking statements.

  • AngloGold Ashanti undertakes no obligation to update publicly or release any of the revisions to these forward-looking statements to reflect events or circumstances after the date hereof or reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by the cautionary statements herein.

  • This communication may contain certain non-GAAP financial measures. Other AngloGold Ashanti utilizes -- sorry, AngloGold Ashanti or -- sorry, let me repeat that. This communication may contain certain non-GAAP financial measures. AngloGold Ashanti utilizes certain non-GAAP performance measures and ratios in managing its business. Non-GAAP financial measures should be viewed in addition to and not as an alternative for the reported operating results or cash flow from operations, or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly-titled measures other companies may use.

  • AngloGold Ashanti posts information that is important to investors in the main page of its website, at www.anglogoldashanti.com and under the investors tab on the main page. This information is updated regularly. Investors should visit this website to obtain important information about AngloGold Ashanti. With that I will hand over to Venkat first. Thanks.

  • Srinivasan Venkatakrishnan - CEO

  • Thank you Fundisa. Morning ladies and gentlemen.

  • If we can kick off with slide number 5, this is basically what we articulated as our strategy going back last year and we have been articulating it each quarter. To recap, there are five building blocks which encompass the strategy, the foundation being safety, people and sustainability. Second, the financial flexibility, which the business needs to implement the strategy. Thirdly, optimizing all forms of costs and capital expenditure. Fourthly, improving the portfolio quality and making the assets work harder. And finally, bearing in mind that this is a long-term business and it's not all about the short term, keeping our long-term optionality still intact.

  • The end result will be a business with a strong foundation and fundamentals, a team that is committed and is focused on delivery, and sustainable free cash flow from a diversified portfolio.

  • With that introductory comments, if we can start with safety being our first value, we continue to strive to achieve zero harm. Our all-injury frequency rate for the first quarter, which is measured by the number of injuries divided by the million man hours worked, was the best ever first quarter all-injury frequency rate seen by the Company. We had 20% lower injuries year on year and 8% fewer days lost. 11 operations succeeded in completing the quarter with zero lost-time injuries. Six operations completed the quarter with zero injuries.

  • South Africa was a standout performer in the Group. For the first time in the history of the Company, a South African underground mine achieved 3m fatality-free shifts and very good work by the team at Kopanang, Great Noligwa and TauTona also achieved 1m fatality-free shifts.

  • Having said that, we, after two months being fatal-free, January and February, we had three incidents in March. All three were in non-production-related areas. The first was in South Africa in the Mponeng project and the other two were in Brazil, involving contractors who were refurbishing our vent shaft. These, together with the high-potential incidents, show that more work needs to be done and our focus here is to learn from these incidents and transfer the knowledge so gained across all of our operations, so that we can eventually eliminate any such incidents.

  • Now turning to the first quarter, another very good quarter under very tough market conditions and excellent work from every one of our 60,000 plus employees and contractors in the business. Production was up to 1.06m ounces. It was up 17% year on year and bear in mind that Q1 is always our weaker quarter, Q1 and Q2. We have shown slides in the past to demonstrate that. But it was ahead of our guidance of 950 to 1m ounces, and you could see the benefit of Kibali and Tropicana coming in, into the production.

  • Our total cash costs were down 14% year on year at $770 an ounce, ahead of $800 to $850 guidance and Richard will unpack in a waterfall graph how the movement of the costs have actually come through. Our all-in sustaining costs decreased 22% to $993 an ounce on lower CapEx, cash costs and overheads. Currencies did play a part and there is an element of timing benefit in there. Our all-in costs dropped 31% to $1,114 an ounce.

  • South Africa had a tough quarter. Production was down 11% to $290,000 ounces year on year, but the team did exceptionally well in managing their costs, which dropped 14% to $975 an ounce. The shortfall was mitigated by our non-South African operations, where output was up 34% to $765,000 ounces year on year and their all-in sustaining cost dropped 22% to $972 an ounce. We start to see the production from Tropicana and Kibali come through, in total around 135,000 ounces at a cash cost of around $500 an ounce and all-in sustaining costs closer to $600 an ounce between the two mines put together. And we are starting to see the quality production come through.

  • And our net debt showed marginal improvement quarter on quarter and it's stable at around $3.1b.

  • Here are some interesting statistics. The last time we saw this level of production in any first quarter was in March 2010. The last time we saw this level of cash cost in any quarter was March 2011. And this is our first free-cash-flow-positive quarter since March 2012, and at that stage the gold price was $1,700. You've got to recall since 2012 we have been investing in Tropicana and Kibali, but it's pleasing to see that we have recorded our first free cash flow positive for the quarter at a lower gold price.

  • The next slide, the table states over a thousand words and it compares our year-on-year performance, first quarter to the first quarter like for like. Gold price fell 21% over that period, or $346 an ounce and, in simple terms, ignoring the currency benefit, it translates to a $350m hole in the cash flow for the quarter.

  • But the teams have done exceptionally well in pulling every lever which is in our control to plug the gap, whether it's production, whether it is costs. And importantly corporate costs and explorations costs in total, which have come down significantly, and our capital expenditure, which has some timing benefits, which Richard will outline. And we start to see the benefit come through in all-in sustaining costs. The impact has been significant, although helped by weakening currencies, but even stripping that out the reduction in local-currency terms has been quite marked quarter on quarter.

  • What would have normally happened with a 21% drop in gold prices is one would have expected EBITDA and cash flow from operating activities to be decimated, when you compare it year on year. But we have managed to hold that reasonably steady at $476m of EBITDA for the quarter and $350m cash flow from operating activities, and importantly our free cash flow has swung from $227m negative to $9m positive, representing the fifth consecutive quarter of improvements.

  • With those introduction comments I think I'll now pass on to my operating colleagues and the CFO before we come back in for the conclusion.

  • Mike O'Hare - COO, South Africa

  • Thanks Venkat and good morning to everybody. I'd like to reiterate the comments Venkat made around the safety improvements at Kopanang mine. I don't often talk about achieving these 3m and 2m, but it is the first time it's happened in the Company. It's taken that team over 900 days to achieve that 3m fatal-free.

  • And I think the significance is it's no coincidence that Kopanang mine was the first mine to pick up our BPF system properly and holistically, which I think means it's allowed us to achieve what we set out to achieve all of those quarters ago, when we discussed those issues of resourcing an area properly, planning an area properly, so that everybody knows what it is they are supposed to be doing at a workplace, which leads to better-quality workplaces and people who know what they are doing.

  • It's however quite ironic that during the quarter Kopanang also experienced a 10-day work stoppage as a result of the DMR's instructions. Clearly we are not on the -- we weren't on the same page as they were on. We've spent significant time talking to them and we believe we understand now what their expectation of us is, and certainly we are both committed to making these results get even better.

  • The stoppage at Kopanang resulted in a disappointing performance from them for the quarter, and that, together with the planned downscalings at both Noligwa and TauTona in the Savuka section, means that our production levels are lower than this time a year ago. Mponeng currently still remains our expected performance target, and it's largely based on volume. The levels of the grade, the grade issues have stabilized and we now just need to achieve the productivity levels per crew in each of the workplaces. Moab Khotsong continues to perform well, and grade has stabilized, our production increases have materialized and we remain confident in that ore body going forward.

  • During the quarter you'll note that our grade will have deteriorated by 10%. And I think it's important to mention that when you look at the overall grade of the region we include the tonnage processed by mine waste solutions. And we processed 1m tonnes more this quarter than a quarter a year ago, at those incredibly low grades that we put through there, of 0.15 grams a tonne, and this affects the overall grade of the region. However, if one compares the underground grades, our grades have actually increased by just under 6%.

  • During the period we continued with our restructuring. The costs in rand terms have come down largely based on the restructuring of the management cohort, our scrutiny of our capital. So I think that's going well and according to plan. However, I do expect Q2 to be another quite tough quarter, given the amount of public holidays that we have in the April month and leading into May, with the additional day due to the General Elections.

  • If I move over to slide 11, an update on our technology, I think the significant issues for the quarter were the fact that we now drilled four holes skin to skin, which really means that we've now got very close to being able to say that we can extract all of the reef.

  • We backfill all of these holes and in the backfill we put measurement devices, which enable us to test exactly what the backfill reaction is go this drilling. And I'm glad to say that the backfill is reacting exactly as we planned. So the engineering part of the backfill is working well. And it's now allowed us to be able to devise a drilling sequence because the backfill takes about 20 days to cure, so we need to design a specific drilling sequence in order to ensure you maximize the use of that backfill.

  • As promised, we delivered two new machines underground and they're both drilling. We have a new site established at TauTona, which is our first pukka production site. That machine is drilling and you can see the picture of that on the bottom right hand side. Its backfill -- backfill equipment has also been established and that's the photograph you see on the top.

  • What's going to be interesting is our first very thin reef machine has been delivered at Great Noligwa and we are drilling with that machine at the moment. And this our attempt to turn an uneconomic reef into an economic one by using this drilling technique. So we'll watch that very carefully and we'll report over that during the quarters, as we progress.

  • Some success in our RC drilling program. Remember what we are trying to do is convert the South African operations from diamond drilling, which is expensive and very slow, by using RC drilling. We've had a breakthrough during the quarter; we've now drilled 150 meters length of hole at 8 meters an hour. The challenge now is to extend that hole to 300 meters at the same rate. So I think we are progressing fairly well on that front.

  • If I move to the next slide, it's the slide that we normally tabulate around our progress on the different holes. I think what you're going to see when I report against this on the next quarter is another two machines' worth of drilling, but you'll also start to see the influence of drilling in different kinds of reefs, which surely will be lower grade. Obviously they are much thinner holes, but we expect them to go through much quicker.

  • Thank you very much. I'd like to hand over to Ron Largent.

  • Ron Largent - COO, International

  • Thank you Mike. Good morning. I will take you through the international operations, but before I speak to those highlights and outcomes I'd like to spend a couple of minutes on the cost rationalization project that we have spoke to you over the last three, the three results' days.

  • This project started in late quarter two 2013 with an objective of pulling $500m out of the operation spend profile over an 18-month timeframe, ending in quarter four 2014. In quarter three and quarter four 2013 we documented $136m worth of extraction from our operating cost and that can be seen by the operating costs in those two quarters.

  • Additionally, when we do the internal planning for 2014, we had put, we had included in those business plans savings that well exceeded the $500m. I guess the way that I look at that, so if we meet our planned production costs, that will be -- that will include the $500m worth of savings. Well, through quarter one our all-in sustaining costs were 7% below our targets so with that outcome I think that supports the work being done on the cost rationalization.

  • Some specific work that's been done in Q1 -- I think it's important to bring it up -- this isn't all-inclusive, but contract mining rates at Sadiola and Siguiri were reduced for 2014 by 14% and 16% respectively, which equates to about a $15m annual cost reduction. We are focused on localization in Continental Africa, which really reduces the number of ex-patriots. With the work that we've done so far that is another $13m in savings. Renegotiation of a complete cyanide supply in West Africa, there's another $10m. These are over and above what our current plan is.

  • And then a big bunch of work going into storage inventories and working capital. Although this is not cash cost, it will impact our balance sheet. We've set our target at $100m reduction in 2014 and we are well on our way of obtaining that target.

  • From an operational standpoint, an example of improvement is at Sunrise Dam where the team there has focused on operational improvement and been able to change Jumbo development rates from 330 meters to 420 meters per month. And the outcome there also was a trucking productivity increase of 10%.

  • So those are examples of what we are doing and I think it's important to bring them up. And I think ultimately the real measure is quarter on quarter as we see the costs. Now when we look at costs, as Venkat said, we had some currency impact, which to me was really in Argentina and South Africa. But we actually track on a local currency basis to make sure that we're not taking into account the currency impact. So that's where we sit. I think it's quite exciting around the operation, from a cost-management standpoint as the sites see their costs continue to improve. We're quite convinced we will get to that $500m by the end of the year.

  • Now for the discussion on international operations for quarter one. The assets produced 765,000 ounces at a cash cost of $759 and all-in sustainable costs of $972. This was an improvement of 14% (sic -- see slide 7 "34%") and 22% respectively compared year to year.

  • In Continental Africa quarter one the region produced 374,000 ounces compared to 276,000 in quarter one 2013. It is a 36% improvement, but one must add in the Kibali mine that really was the big differential, at 51,000 ounces attributable at $538 cash cost. But with that being said, the region has been able to reduce its cash costs by about $170 per ounce over that year-on-year comparison.

  • The Siguiri mine exceeded its quarterly targets for the ninth consecutive quarter, with 70,000 attributable ounces and cash costs of $800 per ounce. The commencement of mining the [Seglund] pit has proved to be a good addition to mill-feed sources.

  • At Iduapriem good results for the quarter, 45,000 ounces at $718 cash cost, as the stockpile plan has shown good results, along with mining the area in the Ajopa pit that was previously mined by artisanal miners. Due to the artisanal mining activity, we had depleted the ore body model but in fact our reconciliations have been very positive in that area where the artisanal miners had mined previously.

  • Geita mine had a good quarter at 108,000 ounces and cash costs of $631. It's considerably different than quarter four last year. The grade, if you want to say, the grade presentation was considerably different, moving out of the Star and Comet pits, which was high-grade, but production and productivities have improved considerably. And what I mean by productivities is we have been able to change our mechanical availability of our HME fleet by about 15% over the past few quarters.

  • At Obuasi mine, Graham will speak to this in a little more detail, but production improved year on year by 8% and reduced its all-in sustainable cash costs considerably mainly by the reduction in capital spend at Obuasi.

  • One last comment on Continental Africa, the Sadiola sulfides feasibility study, it's been updated and evaluated. We hope to make a decision during the second quarter on where we are headed on the Sadiola sulfide project.

  • So overall Continental Africa, Ludwig and his team have put on another good, strong quarter and look forward to quarter two out of Continental Africa.

  • Americas region, basically it was year-on-year comparison are the same costs and the same production, at 236,000 ounces versus -- I think it was 238,000 ounces (sic -- see slide 15 "234,000 ounces") a year ago and cash costs are $668. The big change there is we were able to reduce the all-in sustainable cost by about $48 an ounce across the Americas region.

  • The CC&V MLE project, which is the heap-leach, the mill and associated infrastructure will be covered by Graham. But as for CC&V's operation, the current heap-leach facility is beginning to reach its ultimate capacity and height, which reduces the amount of surface area available for leaching. As you build it up in a pyramid kind of form you lose surface area so it's starting to, I'm not going to say cause issue, but it's more challenging as the pad gets to its height.

  • The production at CC&V was down from year-on-year comparison and quarter on quarter. We had issues with a piping system, pregnant solution piping system that has made us change the stacking plan. That impacted quarter one and probably will impact quarter two, but will come back in Q3 and Q4 due to, if you want to call, schedule and timing of stacking on the heap-leach pad.

  • Cerro Vanguardia had a good quarter, with despite the challenges with high inflation, the import, I'll say challenges, and currency depreciation, and produced 58,000 ounces attributable at $644 an ounce.

  • In total in Brazil produced 125,000 ounces at a very good cash cost of $664. So for the Americas region basically [Elceo] and the team finished their quarter on target and within our expectations. So they had a decent quarter.

  • On to Australia. For quarter one Australia produced 155,000 ounces compared to 61,000 on quarter one 2013. This increase is due to the Tropicana mine being in operation. Cash costs were favorably impacted by the Tropicana mine also as cash costs totaled $779 for the two operations compared to $1,300 during quarter one 2013.

  • The Tropicana mine is meeting our expectations as related to ore-body reconciliations, mill throughput, gold production, availabilities, productivities. So the 84,000 ounces that were produced in the quarter do not come without its challenges. We had some heavy rainfalls and roads washed out, and we had some start-up problems with some gears and some mechanical pieces of the mill, but they met their objectives at 84,000 ounces. I think it'll be interesting to watch Tropicana throughout the year as we start to understand this asset and where it will level out as far as mill throughput and exploration potential.

  • At Sunrise it's a very interesting operation right now as it's in transition from an open-cut underground operation to an underground operation only. And what does this mean? After finishing the open-cut mining in quarter four of 2013 now all the emphasis must be around turning this into a 2.4m tonne per annum underground operation. The team met that desired production rate of 200,000 tonnes per month in March, which ultimately illustrates that targets can be met. With 2.4m tonne operation there it becomes a very viable asset as we move into the future.

  • Mike and the team have completed a very successful quarter one and with the new Tropicana mine coming to, working it into maturity, and the changes at Sunrise dam, give them their challenges for 2014.

  • So, in summary, the international operations met or exceeded the majority of their targets in quarter one, with new operations producing at designed rates and existing assets producing at expected levels. The cost rationalization is really the key to driving the costs down.

  • Quarter two appears to have few challenges as we look forward, as we have to re-schedule our production profile at CC&V due to the mechanical issue with the solution piping. At the Cuiaba mine in Brazil we've had some difficulty with rock mechanics specific to one ore body that have caused us to reschedule some of the grade coming out of that operation. And the start-up of the sulfide circuit at Kibali mine will have its challenges. With these challenges we still believe Siguiri and Iduapriem still show some upside potential.

  • So with that said I will now turn the mike over to Graham Ehm.

  • Graham Ehm - EVP, Plannning and Technical

  • Thank you Ron. Morning ladies and gentlemen. I will cover our projects and also speak to exploration.

  • Firstly, in regard to Tropicana, this clearly now my final piece as the project is handed over to Ron and the operating team. Ramp up during the quarter was completed and went very well, delivering 120,000 on 100% basis. And ongoing capital expenditure from now on will only be stay-in-business capital. The official opening was celebrated on March 6. The project was opened by the West Australia Minister for Mines, the Honorable Bill Marmion. And the Premier of Western Australia attended a function, addressed us in regard to the project later that evening.

  • These two control charts on the next slide, they demonstrate how the Tropicana mill is currently operating. The top chart shows the throughput rate compared to design, and you can see since January that the plant has been consistently operating above design throughput at 17,000 tonnes per day. The lower chart shows the operating time. It's measured as the number of hours of runtime per day and you can see that there's been very little downtime over the last few months. The runtime for March was 95% and so far for the last four weeks has been running at 99%. So the mill is clearly operating very well.

  • In regard to Kibali, the oxide circuit operated quite well during quarter one. There are a few materials-handling and equipment issues, as one might expect. Quarter one gold production exceeded our budgets, achieving 113,000 ounces on 100% basis. Sulfide circuit commissioning is now in progress and will result in a progressively higher production in quarter two and quarter three.

  • Underground development is going particularly well. A decline in lateral development has now advanced over 5,600 meters project to date, with 1,650 meters in quarter one. The shaft is also progressing very well and reached a depth of 416 meters. Importantly grade-control drilling has commenced from the underground development and has intersected the top of the 5,000 load. Results from grade-control drilling show that the load is where it was expected and at the tenure expected. So in terms of future of the underground mine, as we move to first ore mining in quarter four, things are looking quite good.

  • In regard to Cripple Creek, the Cripple Creek mine life extension project continues to run on schedule and cost. The mill construction is now 75% complete and on track for commissioning in quarter four this year. Construction of the new valley leach facility is also on track. The commissioning for this is some time away in 2016.

  • A few comments in regard to greenfields exploration. We've previously reported the contraction of the greenfields program to three focus countries and a budget reduction to $35m per annum. We intend to retain our spend discipline in regard to future greenfields exploration.

  • Exploration in Guinea at Kounkoun, which is within tracking distance from the Siguiri operation, has gone quite well with a resource of 630,000 ounces with good probability of increasing this substantially.

  • Exploration in Australia is focused on regional Tropicana. Targets continue to be generated with the most interesting being the Madras prospect, about 25 kilometers south of the Tropicana mine.

  • In Colombia Nuevo Chaquiro is developing into quite an interesting copper/gold discovery. The initial drilling identified a large but deep porphyry system shown by the dotted line on this slide. Hole 39 intersected 686 meters at 0.72% copper and 0.33 grams per tonne gold for about 1.5 grams per tonne gold equivalent. More recently drilling is showing up a high-grade core.

  • And we've just commenced a scoping study to put Nuevo Chaquiro in perspective compared with other copper/gold deposits. Based on the intercepts so far, this deposit looks like a 70% copper and a 30% gold value prospect. We expect to be able to say more and publish the maiden resource for Nuevo Chaquiro in quarter four this year.

  • Now moving on to Obuasi. Today I am speaking about Obuasi due to the next steps we are planning to take in regard to this mine. The team on site led by Mark Morcombe has implemented a number of substantive changes over the last few years, including termination of the unproductive mining contract, rationalization of the underground fleet with consequent reductions in labor numbers. Mine geology and mine planning has improved significantly. And the aged CIL and flotation plants have been replaced. The government of Ghana has been very helpful and active in dealing with Obuasi's illegal mining issue.

  • Despite all this effort Obuasi is not turning the corner at a pace that would see it become cash generative. Consequently, if I can move to the next slide, we believe a radical intervention is required. And AGA is working with the government of Ghana, the union, the King of Ashanti and other key stakeholders to develop an amendment to the program of mining operations.

  • Subject to necessary consent, the amendment involves a substantial change wherein operations will be contracted to the retreatment of tailings only and we will focus on targeted development of the underground mine. During this period other parts of the mine will be placed on care and maintenance. Consequently there will need to be a commensurate reduction in labor which we would manage sensitively and in consultation with the government, union and community. The mine's footprint would be substantially reduced to focus on the southern area, enabling security to be managed much more effectively.

  • We realize that such a change requires social repositioning. And our CEO and EVP Sustainability David Noko and the senior Ghanaian management are working closely with senior members of government and other stakeholders to develop the changed plan. This will result in a very different Obuasi and a significant reduction in G&A costs currently borne by the mine.

  • The other key element is the mine repositioning plan. The top figure in this slide shows the current working areas spread throughout the mine from north to south, with short space in between mine intervals. Shown in the lower slide the plan's intent is to contract to the south and concentrate mining in a few areas, namely Sansu 3 and blocks 8 to 10. The ore body here enables productivity improvement for multi-lift scoping, improved backfill and mechanized mining with larger equipment.

  • During the slowdown period we will undertake the detailed work and the detailed design and develop a specific plan for the future operation. Based on this work we will determine how best to take the mine forward.

  • Finally, because this work involves many different, interconnected elements, it will be treated as a project and therefore has transferred from Ron's team. They will certainly be tapping into all the resources within AngloGold to turn Obuasi and change the future direction.

  • Thanks very much. I'll pass you on to Richard.

  • Richard Duffy - CFO

  • Thanks very much Graham. Our ongoing efforts to address our cost structure across the business are reflected in the 22% year-on-year reduction in our all-in sustaining cost from $1,275 an ounce in quarter one of last year to $993 an ounce in this quarter. Whilst weakening local currencies contributed around $95 an ounce of this reduction of $282 an ounce, lower operating, corporate and exploration costs contributed $100 an ounce with reduced stay-in-business capital contributing a further $104 an ounce. As you will see when I talk to our Q2 outlook a little later on, we expect stronger local currencies to reverse some of the gains made in quarter one.

  • The year-on-year reduction in all-in costs is even more marked with lower project spend in this quarter following the completion of Tropicana and Phase 1 of the Kibali operation, resulting in a reduction of $508 an ounce or 31% from $1,622 an ounce in Q1 of last year to $1,114 an ounce in this quarter.

  • Turning to earnings, you will see that we have more than offset the $214m negative impact of earning on the back of a $340 an ounce or 21% drop in the spot gold price, through additional lower-cost answers and significantly lower corporate, marketing and exploration costs. You would have seen from Venkat's highlights slide that Tropicana and Kibali feature prominently in contributing to these lower-cost incremental ounces.

  • The significant improvement in underlying operating performance resulted in a $237m improvement in our cash flow this quarter as compared to the same quarter of last year and resulted in earlier than expected cash generation in quarter one, albeit modest.

  • Notwithstanding a slight improvement in our net debt, our net debt to EBITDA ratio increased marginally from 1.85 to 1.89 times. This is because we measure this ratio over the preceding 12-month period and, although our net debt reduced, EBITDA for the measurement period reduced by $33m as quarter one 2013, with a considerably higher average spot gold price at $1,630 an ounce dropped out of the calculation and was replaced by this quarter's average spot price at $1,292.

  • Our borrowing covenant threshold remains at 4.5 times for the upcoming June testing period before resetting back to the 3 times for the December period. As you can see, we remain below both of these thresholds, although higher than historical levels. We have therefore been prioritizing debt reduction and this is reflected in the repayment of AUD165m against our AUD600m revolving credit facility, reducing the drawn amount to AUD385m by the end of this quarter, quarter one. We were assisted in this by a AUD40m once-off tax refund in Australia.

  • My final slide talks to our outlook for the second quarter. Production is forecast to be broadly in line with quarter one at between 1.02m and 1.06m ounces. Mike mentioned that production from our South African operations is expected to be impacted by the number of public holidays in quarter two and you also have heard from Ron that we have some scheduling and operational challenges in our international operations for quarter two.

  • Cash costs are projected to be in an $830 to $865 an ounce with all-in sustaining costs of between $1,100 and $1,145 an ounce. Cash costs are expected to be negatively impacted by stronger local currencies to the tune of about $20 an ounce. Power increases, winter tariffs and higher fuel costs will also contribute to around $20 an ounce increase. And we expect to see some unfavorable movements in our ore inventory and consumables stores that would add around $50 an ounce.

  • As mentioned in my first slide, the lower all-in sustaining cost in quarter one was assisted by lower stay-in-business CapEx, a portion of which related to timing rather than efficiency or savings. And so we expect around $30m of sustaining capital to roll over into quarters two, three and four of this year. And that will reflect in higher all-in sustaining cost in Q2. It is also worth noting that all-in sustaining costs are measured against our ounces sold not our ounces produced and in quarter one we sold some 40,000 ounces more than we produced as a result of timing differences.

  • Importantly the seasonality reflected in our Q2 outlook does not impact on our annual outlook, our annual guidance, and this remains unchanged from that provided to you at the beginning of this year.

  • I will now hand you back to Venkat. Thank you.

  • Srinivasan Venkatakrishnan - CEO

  • Thanks Richard for that detailed unpacking of costs. Most appreciated.

  • To conclude, if we can kick off with slide 32, as you can see when we were here during the results of November 2012 we were looking at a gold price of around north of $1,700. Comparing where it is now the gold price has actually tumbled -- there's no other way of putting it -- and the impact of this has been formidable on the business. And the question which is always asked is could AGA turn around with these high-cost assets? How quickly can the team respond?

  • And the team has done exceptionally well in mounting a rapid turnaround response, which has seen the free cash flow -- which is the measure after paying all of your amounts, your capital, your interest, your tax, what is ultimately available -- was negative $497m in the second quarter of 2013 was then reduced to negative $205m in the third quarter of 2013 as we started to bring the projects onstream. It reduced further to $82m negative in the fourth quarter of 2013 and we've been marginally positive in the first quarter of 2014.

  • Turning to the next slide, what we have done on this slide is shown what the quarterly production profile has done in 2013 on the left hand side and what our all-in sustaining costs have done on the right hand side of the same graph. What we have also super imposed on top of that, given the nature that our Q1 and Q2 tends to be the weaker quarters, what the Q1 production for 2014 was along with the all-in sustaining costs.

  • A couple of key messages. We have pulled together five quarters of consistent good delivery. And during this period we have shown production growth and cost decline under quite tough and challenging market conditions because there has been inflation over this period and one shouldn't forget that.

  • Our Q1 and Q2 tend to be our weaker quarters, but the year-on-year improvement is noticeable whether you look at it on production or whether you look at it on costs. But we have also been taught to be humble. Headwinds continue to be formidable in a business such as ours and I'm sure at some stage it will cause us to miss a quarter or two here and there. But the important point to bear in mind is that the overall trend is heading in the right direction.

  • Turning on to the next slide, a quick recap in terms of what we have done on our corporate and exploration cost, the discretionary spend. The savings are markedly apparent, as you can see when it comes to all forms of costs. Greater focus on exploration, taking into account the price environment. On the corporate costs, which have taken a substantial amount of pain, it's come on the back of restructuring, retrenchments, removing inefficiencies and duplication but keeping a firm lid on our indirect spend.

  • And, as Richard outlined, our first quarter of 2014 has had some timing benefits, so our annual numbers for 2014 are still unchanged. Exploration and evaluation of $150m to $175m and corporate costs of $120m to $140m, which is more than simply annualizing the first quarter numbers.

  • Turning to capital expenditure, 2012 and 2013 were heavy capital years for AngloGold Ashanti as we were building Tropicana and Kibali. But, as you can see, the project capital has started to reduce and we are starting to pull the benefit of the cash flows from the two mines. Our sustaining capital for 2013 was just north of $1b and for 2014, including deferred stripping, it's roughly at around those levels. Our project capital has come down to $400m, focused primarily on Cripple Creek & Victor mine life extension, the Mponeng below 120 level, the work on Kibali underground and the decline in respect of Obuasi.

  • To conclude, if we can go back to the slide where we started from in terms of what we promised to everyone and where we have got to in respect of each one of those pillars which support our strategy.

  • On safety, people and environment more work to be done, but certainly good inroads made when it comes to safety in terms of retaining the core team and importantly our environmental incidents have reduced significantly as compared to prior years.

  • Financial flexibility has been good with the finance team putting together the $1.25b seven-year bond which improved our debt tenor and provided liquidity, albeit it came at a high coupon relevant to the market circumstances then. Our covenants were relaxed by the banks for two testing periods, but as you can see we didn't have the need to use the relaxation of the covenants.

  • When it comes to costs, whether you look at all-in sustaining cost, overheads and exploration costs, capital expenditure, all-in costs, all of them have come down significantly more than what the currency benefits have been.

  • On the portfolio the Navachab sale is in process and it's currently with the regulators for Namibia. And we are in dialogue with the regulators and we hope to conclude it in late Q2 or sometime in Q3. Kibali and Tropicana were commissioned ahead of time and on budget. And we are starting to see the benefit come through. And the Cripple Creek & Victor expansion is going well.

  • On long-term optionality, the South African technology innovation is going well and we are putting more effort into that particular area, which is the key lever we have to improve the productivity levels in South Africa and also turn the declining trend. And in addition to that, the greenfields expenditure is more focused.

  • So turning to additional focus areas in 2014, we will continue with our safety, our quality of production and cost initiatives. With regard to debt levels, currently at $3.1b, it's reflective of the capital we spent on the two acquisitions, MineWare Solutions in South Africa and 50% interest of Serra Grande in Brazil, and importantly the two new projects which were built, which is Tropicana and Kibali. All four of them were funded in cash and it amounted to close to $2b. So two thirds of our net debt currently relates to these acquisitions and projects.

  • We have made good progress on improving our financial position by addressing our operating and our capital cost base. On the broader financial flexibility, the team under Richard has done exceptionally well in eliminating the refinancing risk, diversifying our sources of funding, extending our maturity profile and improving our liquidity headroom. However, the leverage level is still high. And therefore financial flexibility is going to be an ongoing area of focus for us.

  • The other area of focus, as certainly one of you have termed this, the problem child in the portfolio Obuasi mine. We are tackling this asset head-on now, as the cash bleed is simply not affordable. It cost us $120m of shareholder injection in 2012, $220m went in in 2013 and $40m has gone in in 2014.

  • As Graham outlined, we are taking a radical approach to the mine which has been in operation for over 100 years and that brings with it a range of challenges. The only way we can unlock this challenge is by working in partnership with all of the stakeholders. So we have spent six to nine months working in partnership with the stakeholders in Ghana, with the government, the union and the wider group of stakeholders.

  • To give you a few examples of whom we have consulted with, the government of Ghana, notably our sector minister there, Honorable Alhaji Fuseini, the environmental minister and other ministers, our principal regulator the Minerals Commission and the EPA, the King of the Ashanti region and the traditional chiefs of the Ashanti region and the Obuasi mine, the members of Parliament for Obuasi and the members of the local legislative council, the National Ghana Mineworkers Union across all levels of leadership and a cross-section of our employees during our site visits and a wider group of stakeholders.

  • We must point out that the support we have received from all of the stakeholders, in particular our sector and environmental minister and the general secretary and his team at the union, to support the short term pain which the community and the mine is going to take, as outlined in Graham's presentation, to protect the long-term future, has been remarkable. We have never seen such solidarity and support before to address this problem.

  • Now the principal advantage of our proposal, which we will continue to develop -- it's in its initial stages at the moment; will continue to develop over the next few months -- includes the following.

  • We are employing a collective approach, not just an approach from AngloGold Ashanti Ghana Limited, but a collective approach to address what we see and what Ghana sees as ultimately a common problem. It stems at the cash bleed at the mine from the current levels. It ends a number of legacy overhangs that has been engulfing the mine and puts an end to a number of outdated business models. It makes the asset far more attractive. And that opens up a number of strategic alternatives which have largely been closed historically for this asset.

  • With those concluding comments, we are happy to take any questions.

  • Fundisa Mgidi - IR

  • Yes.

  • Johann Steyn - Analyst

  • Hi. Good morning everyone. Johann Steyn from Citi. Just on Obuasi, clearly you're taking some decisive action, but what are you looking for in the next year or so in terms of production, in terms of cost, in terms of CapEx, in terms of number of heads of people and how long will this process go on for until you basically know what the new steps will be for Obuasi?

  • Srinivasan Venkatakrishnan - CEO

  • If I can pick up the answer to that question, Graham, if I may, I think the important part here, Johann, is to regard this as work in progress. We were in two minds whether to put the blueprint across to delay it until the work was done. We felt it's perhaps better to be transparent given the news flow which has been there in the Ghanaian media.

  • We are currently working through all of the options which we have outlined. And importantly we want to do it in partnership with the government. So at this stage we are not changing any of our outlooks or giving numbers but currently the bleed rate is around $220m. Subject to the retrenchment costs which we will need to pay -- and as you know the retrenchment terms in Ghana are quite generous; it's three months based on last-drawn pay of US dollar denominated salary for every year worked -- and given the age group of the workforce it is quite a sizeable number so we've got to work through all of those.

  • We will then put together a plan for this period where the mine is effectively going to be considerably shrunk down, focusing on just one tailings source which is in respect of [diatsu] tailings and then look at what the cost and the production profile is going to be. We hope to make something available at the time of our annual results in February. We'll try and fast track it but certainly at this stage we want to do it properly with government consent. So our advice to you would be to keep your targets as they are right now. As and when there are changes, we'll let you know.

  • Johann Steyn - Analyst

  • Okay. Thank you.

  • Fundisa Mgidi - IR

  • There's Derryn behind. Sorry, Adrian, we'll come back.

  • Derryn Maade - Analyst

  • Hi. Good morning guys. Derryn Maade from HSBC. Firstly congrats on a much improved first quarter. It's good to see some of the improvements in the portfolio coming through. I just wanted to also ask a little bit on Obuasi. Is there the option there that if your feasibility or pre-feas or whatever you're going to go into now, doesn't come back positive, what's the worst-case scenario here?

  • Srinivasan Venkatakrishnan - CEO

  • Okay. Firstly, if we can answer that question, we don't want to pre-empt what would happen if any feasibility study doesn't yield results because the ore body is still hugely attractive. The problems with terms of actually getting to the ore body has been the noise, the social noise around the system. In terms of attractiveness for other interested parties either to joint venture, or for that matter for the purchase or the sale, the issue has been the ballooning retrenchment liability. By addressing some of this we're certainly making the feasibility study more attractive than what it would be.

  • So we don't want to preempt what the outcome of the feasibility study would be. But if we are taking such a radical decision in terms of dealing with the mine, we would go with the outcome of the feasibility study. But we'd appreciate doing this properly rather than jumping to conclusions.

  • Fundisa Mgidi - IR

  • We'll take Adrian and then we'll go --

  • Chris Nicholson - Analyst

  • It's Chris Nicholson from RMB Morgan Stanley. Two questions. First one on Obuasi as well. Just so I'm reading the comments correctly here, estimates are currently $220m, is that the estimated retrenchment cost, redundancies or is that the cash bleed?

  • Srinivasan Venkatakrishnan - CEO

  • In fact coincidentally it might be both. It was what we put in in 2013. If I can just recap on what the formulae for retrenchment at Obuasi is, at the time of the merger with Ashanti the formulae which was provided for is, firstly, the wage packet for the Ghanaian workforce is US dollar denominated. That's the first aspect. It's not a Ghanaian cedi-denominated package. The inflation -- the increases which have been given in the past have not necessarily been US inflation. It's somewhere between US and Ghanaian inflation on US dollar denominated salaries. So you've seen the wage bill go up in local currency terms and in dollar terms as well.

  • The second aspect is every employee when they are made redundant get three months for each year of completed service or part thereof. And in addition to that there is also a bunch of top-up payments. So what would be a retrenchment liability, call it $100m four, five years ago, doubles in four years, potentially again goes up by another $100m, $150m in three, four years' time.

  • So as part of this proposal, one of the things we are working with the union is looking at effectively retrenching a significant number of the workforce to put an end to the ballooning retrenchment formulae and re-employing a sustainable employment model going forward. So the number which we have provided there was the estimate as at the end of the first quarter, assuming the entire workforce is retrenched.

  • Fundisa Mgidi - IR

  • Thanks. We'll take Adrian.

  • Adrian Hammond - Analyst

  • Morning gentlemen. Adrian Hammond, BNP Cadiz Securities. I have three questions. First one for Mike O'Hare regarding South African operations. You've talked about improved or improvements in dilution regarding reduced stope widths. Has that been an improvement in mining discipline or is that a refocus of teams into geologically more favorable areas? That's my first question.

  • Second one, there's been a couple more claims for silicosis that were mentioned in the 20F. What is the status of that and how does that form part of the previous lawsuit that was brought against you and can you just give us an update on that please?

  • And then lastly on Obuasi again, I'm sorry if we're drilling this one quite hard, but you've spent a lot of capital in the last three years, some almost $400m in CapEx. What has suddenly changed for you to basically put a halt on the project now?

  • Srinivasan Venkatakrishnan - CEO

  • Okay. If I can pick up the last two questions and then I'll pass it across to Mike for the first one. Let's start with Obuasi now. Firstly, if you look at what Obuasi was consuming in terms of cash needs, it's totally different when the price is $1,500, $1,600, $1,750. The bleed rate is significantly less and it's affordable given the cash flows coming from elsewhere in the business. What has fundamentally changed here is the gold price environment. It has collapsed $500 an ounce and that has a significant hole in terms of the cash flow at Obuasi. That's the first aspect here.

  • The second aspect is whichever way you look at the initiatives of Obuasi, the constraints need to be addressed and we need to modernize and mechanize the mine, hence the decline development which we have started since last year and that will potentially continue through this period. The extent to which we will continue needs to be again determined in the form of affordability so we're not throwing the baby with the bathwater out on that one.

  • What has fundamentally changed though is we have come to the conclusion, given where the gold price is and given the constraints which are facing the mine -- and these may not be just the technical constraints. It is the employment model which sees the labor costs go up year on year. The social model given the white footprint of the mine, that has to change otherwise you're never going to change the direction of the mine going forward.

  • So a decision we then took was to say unless we take the Obuasi mine decision head on and do something radical which has not been done before, we are not going to fix this problem going forward. And this has required us to basically sit with the various stakeholders, for them to understand the constraints of the mine. To give you an example, the minister went with his full delegation of 12 experts to visit the mine himself to get comfortable that that is the position on the ground and came back and said, you know what, AngloGold Ashanti is on the right track here. And that's exactly the focus we have done.

  • Then turning in terms of silicosis, the judgments in question, firstly, let's just step back here. In terms of silicosis, firstly our level of dust emissions have come down significantly than previous years, as you would have seen from our numbers which are published in the sustainability report. The key area that needs a change going forward is the whole compensation system. AngloGold Ashanti voluntarily compensates more than what is provided for in the legislation and that's again outlined in the report.

  • So what is currently being litigated in the court is whether the employer is guilty for having caused the harm and that's a matter which is being litigated in the court and it's premature to come to a conclusion right now. We've got to wait for that court process to complete.

  • Adrian Hammond - Analyst

  • Will that form part of the class action that was brought against you previously?

  • Srinivasan Venkatakrishnan - CEO

  • Potentially it could be. Potentially it could be; that we've got to wait to see where the courts land on that one. Mike.

  • Mike O'Hare - COO, South Africa

  • Yes, thanks. Adrian, if I move over to the grade discussion, year on year our underground -- let's talk underground grade now and not -- so the underground grade has gone up 10%. If I just look across the asset so we can see where the swings and roundabouts are, Noligwa's really flat, Kop's flat, TauTona's flat, Mponeng is 5% down, one of the bigger gold producers, and Moab Khotsong's 40% up. So the Moab Khotsong one and the Mponeng one there's definitely structural changes in the way we're mining in the ore body.

  • However, on top of that, what I've mentioned previously is we've managed to reduce dilution quite significantly, a 3% reduction -- a 3 centimeter reduction in overall scope-width across the region is quite significant together with an increase in our sweepings and clean-mining indices which you see on your bottom line through a mine cofactor improve your overall underground yield.

  • As far as the geology is concerned, that doesn't really play a factor in where we mine. It actually plays a bigger factor from a safety point of view. Geology from the deepest level mines is normally an indicator of high seismicity so generally it's a consideration more in the safety piece than it is in the grade piece.

  • Fundisa Mgidi - IR

  • Okay. We'll take another question up there. Yes, next to Chris. Yes, that one.

  • Dineo Faku - Media

  • My name is Dineo Faku. I'm calling from -- I'm from Business Report. I just wanted to get a sense from AngloGold Ashanti as to what are your expectations from the new administration in terms of policy, the NDP and so forth? Thank you.

  • Srinivasan Venkatakrishnan - CEO

  • Okay. If I can pick up that question. In fact there is a bill which is currently awaiting presidential assent in terms of the amendment, in terms of policy. We've reviewed the bill. Generally it doesn't impact gold in any material way. In addition to that there has been a fair amount of consultation that has taken place through the Chamber of Mines with all of the producers so our input has actually been provided in. There are certain areas such as tailings and rock dumps etc. where there is a bit more clarity and an element of transition period which has been provided, so generally has been quite supportive in that regard.

  • There has been quite a bit of extensive dialogue that has taken place through the Chamber in which we as a company participated as well. I remember David making a presentation to the Portfolio Committee of the Parliament. So generally quite -- shouldn't impact AngloGold Ashanti.

  • Fundisa Mgidi - IR

  • We'll take one last question here.

  • Brendan Ryan - Media

  • Thank you. Brendan Ryan, Business Day. I just want to make sure I've got clear what you have in mind for Obuasi. You're saying you want to shut down the underground mine, retrench just about everybody on the mine at reduced rates. You don't want to pay them the full retrenchment amount; you want to keep it within this $220m total. And then you want to take time to go to the south of the mine and decide where you want to do underground mining again and then when you re-employ everybody it's going to be on a totally different basis. Is that right?

  • Srinivasan Venkatakrishnan - CEO

  • Not entirely right. If I can explain again. Firstly, with regard to Obuasi mine the consultation with the various stakeholders is in progress. They've been extremely supportive in terms of the blueprint plan which we have tabled across. We need to do more work in that regard. But fundamentally what it involves is effectively putting the underground production into snooze mode for a period.

  • We potentially may need to look at the scale of the retrenchment, because you still need an element of people -- and we don't want to quantify the number here -- who will still need to be retained to provide essential maintenance, security etc, but it will be a far more reduced number than the number we currently have. And that might result in us having to retrench everybody, because you can't have retrenching X per cent of the workforce and not Y percent of the workforce.

  • The $220m we have referred to there is paying their full retrenchment liability. It's not a case where we're not honoring our commitments under the employment contract. What that then provides us is to enable us to continue with targeted development on the underground in the southern section of the mine where we currently don't have the necessary infrastructure, where the decline is going exceptionally well from surface to 26 level. And there's another jumbo opening up 41 to the 26 level. And we should hopefully break the full tranche until the 26 level before the end of the year and 41 level the year thereafter.

  • So that part of it we'll probably continue to do and at the same stage Graham and his team will look at Obuasi as a project to see what's the best way to reconfigure the mine, reduce the social footprint and reduce the lease area so that we are targeting the area where we want to concentrate, which is the high-grade underground. And then look at the options which are available after that. So that is the progress.

  • So a significant reduction in the number of people at the mine and also the area covered by the mine for a period. And you can predict whatever the period is. I know the minister has said somewhere between 18 to 24 months. We're still working through the period. And then potentially socializing the feasibility study with the government and with the union and then looking at alternatives around that.

  • Brendan Ryan - Media

  • How many people are employed at the mine at the moment?

  • Srinivasan Venkatakrishnan - CEO

  • Currently, including contractors, around 6,500.

  • Brendan Ryan - Media

  • And do you have the figure in your head as to how much money you've pumped, AngloGold has pumped in to Obuasi since you took over the mine in 2003?

  • Srinivasan Venkatakrishnan - CEO

  • Yes, we've got the number to the nearest dollar, Brendan. It's around $600m which has been funded from corporate into Obuasi mine. And the total capital which has gone in, including cash generated by Obuasi, is around $1.1b to $1.15b. We know these numbers because we presented these to the government.

  • Brendan Ryan - Media

  • Okay. And is that a loss to the Group or not?

  • Srinivasan Venkatakrishnan - CEO

  • Listen, at the end of the day we have impaired the asset. So given where the gold price is and the discount rate is, yes.

  • Brendan Ryan - Media

  • So you've lost $1b on this mine?

  • Srinivasan Venkatakrishnan - CEO

  • We have impaired the asset to the tune of around $1b.

  • Brendan Ryan - Media

  • Thank you.

  • Fundisa Mgidi - IR

  • Alright. That concludes our presentation for today ladies and gentlemen. I'd like to invite you for refreshments outside. Thank you.