Anglogold Ashanti PLC (AU) 2013 Q2 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Stewart Bailey - VP, IR

  • All right, everyone, welcome to AngloGold Ashanti's Q2 results, and that's for the three months to the end of June. With us in the front row, on the far left, Mike O'Hare, Chief Operating Officer of our South Africa region; to his right, Richard Duffy, our Chief Financial Officer; Venkat you know is our CEO, to his right; and Ron Largent, our Chief Operating Officer for our International Assets, to my left.

  • It's a fairly long presentation today, quite considerable detail around a lot of the initiatives that have been underway since May, since we spoke last, so please bear with us. There will be time for questions afterwards. Everyone will be speaking and, hopefully, we'll preempt a lot of the concerns and questions you might have.

  • As is customary, I'm just going to go through our Safe Harbor statement, which is important. Certain statements contained in this document other than statements of historical fact including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, cash costs and other operating results, return on equity, productivity improvements, growth prospects and outlook of AngloGold Ashanti's operations, individually or in the aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of AngloGold Ashanti's exploration and production projects, and the completion of acquisitions and dispositions, AngloGold Ashanti's liquidity and capital resources and capital expenditures, and the outcome and consequence of any potential or pending litigation, or regulatory proceedings or environmental issues, are forward-looking statements regarding AngloGold Ashanti's operations, economic performance and financial condition.

  • These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause AngloGold Ashanti's actual results, performance, or achievements to differ materially from the anticipated results, performance, or achievements, expressed or implied in the forward-looking statements. Although AngloGold Ashanti believes the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct.

  • Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, amongst other factors, changes in economic, social and political and market conditions, the success of business and operating initiatives, changes in the regulatory environment, and other government actions, including environmental improvements, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, and business and operational risk management.

  • For a discussion of these risk factors, refer to the document entitled risk factors related to AngloGold Ashanti suite of 2012 reports, on the online corporate report website at aga-reports.com. These factors are not necessarily all of the important factors that could cause AngloGold Ashanti's actually results to differ materially from those expressed in any forward-looking statements. Other unknown, or unpredictable, factors could also have material adverse effects on future results. Consequently, readers are cautioned not to place undue reliance on forward-looking statements.

  • AngloGold Ashanti undertakes no obligation to update publicly, or release any revision to, these forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti, or any person acting on its behalf, are qualified by the cautionary statements herein.

  • This communication may contain certain non-GAAP financial measures. AngloGold Ashanti uses these measures and ratios in managing the business. Non-GAAP financial measures should be viewed in addition to, and not as an alternative for, the reported operating results, or cash flow from operations, or other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies may use.

  • AngloGold Ashanti posts the information important to investors on the main page of the website at anglogoldashanti.com, and under the investors tab on the main page. The information is updated regularly, and investors should visit this website to obtain important information about the Company.

  • Venkat, over to you.

  • Srinivasan Venkatakrishnan - CEO

  • Thank you, Stewart. Good morning, ladies and gentlemen. If we can kick off with the slide where we left you with at the last presentation, you'll see it, our strategy was to generate sustainable free cash flow from our high-quality portfolio, whilst maintaining the integrity of the business. And if we can put a couple of markers there. We talked about capital allocation; we talked about cost-saving initiatives; we talked about keeping our balance sheet robust for all environments.

  • We then referred to major projects which are coming on stream; we'll cover that in this presentation in terms of where we are. And also, more than 500,000 ounces of quality production at lower costs coming in for 2014. We also said that we'll keep our optionality, both in the international portfolio in the form of Colombia, and for the South African portfolio in terms of our technology initiatives intact.

  • And through this entire process, we said safety of our people will not be compromised. That will remain our first value. And we also said we have a leadership team here to deliver these results. That's where we left you at the end of the last quarter.

  • If we can kick off with safety. Safety, as we said, always remains our first value. We have done a lot of good work over the last five years in terms of making step changes in safety. And there is greater focus on safety during this quite challenging period for the gold industry, because when the operations are under pressure, potentially safety is at risk. And what we are keen is to ensure that we follow the due process and procedures, and don't take short cuts, to provide a safe environment.

  • Regrettably, we had two fatalities in the West Wits region; one related to a fall-of-ground incident at TauTona; and the other was a locomotive incident in relation to Mponeng. They were both isolated to West Wits. Mike O'Hare and the team, along with the Executive Committee, has gone through each of the fatalities which have happened in South Africa since the start of the year, and also the near misses, and lessons to be learned from each one of those, and put in place steps to ensure that this doesn't happen.

  • Fatalities is quite close to our heart, particularly personally my heart, because I don't think a loss of life is worth any justification. I think it's quite tragic. And importantly, in that regard, if you look at where we were in the first six months of 2012, compared to where we are in the first six months of 2013, and you've got to remember this is on the backdrop of when fatalities were flat at AngloGold Ashanti for the last five years, we've seen a step change in the level of fatalities that have happened.

  • Vaal River has been fatality free in the first six months of this year. So have all of our international operations, Continental Africa, Australia, Americas, and the exploration portfolio. But having said that, there's a lot more work to be done, and one thing we can't afford is complacency to set in. What we have noticed in Continental Africa and in the month of June, why June is important is that was the month when Continental Africa was transitioning from Richard over to Ron Largent, it's the most exposed period from a safety point of view.

  • They worked 5.4 million hours, and didn't have a single lost-time injury, and both not having fatalities for the last six months of the year, in respect of the operations we outlined, and the achievement in Continental Africa were an all-time record. So our focus here is to continue the good work and remain vigilant to ensure that we don't worsen our record.

  • Then looking at the second quarter overview, covering it at a fairly high level. Our production for the quarter was 935,000 ounces. It was up 4% on the previous quarter, and it was within the guided range, on the right-hand side of the guided range.

  • Our cash costs initially were between $900 an ounce to $950 an ounce. When we pre-announced our numbers we narrowed that range to $900 an ounce to $920 an ounce; we came in at around $898 an ounce. And there was improvement in performance from our Continental African assets in terms of Geita, Obuasi, and also in terms of Serra Grande from our American portfolio.

  • We recorded an adjusted headline loss during the quarter, largely driven by the drop in the gold price. But the big swing, in terms of the analysts' estimates, were how the writedown in stockpiles were treated. If it was excluded, then we recorded a small profit of around $9 million adjusted headline profit if you were to strip out the one-off items.

  • We also recorded accounting impairments, and Richard will cover that in his presentation. There has been solid progress across the Group in focusing on the spend in terms of capital expenditure, exploration and corporate costs.

  • In terms of new projects, we'll cover them separately in terms of Tropicana and Kibali pouring gold ahead of schedule.

  • We were proactive in terms of managing our balance sheet, and we issued a $1.25 billion bond, diversifying our sources of funding, improving our maturity profile and the debt portfolio. It also added $500 million of liquidity at a marginal interest cost. It was a preemptive step on our part to basically de-risk the exposure in terms of refinancing.

  • In terms of dividend, we did declare a ZAR0.50 per share dividend in the first quarter. The Board of Directors of AngloGold Ashanti spent a considerable amount of time debating the quarterly dividend profile. And we have concluded it would be prudent, given the fact the volatile environment we are in, in terms of the gold price moves, and also the macro environment here, that it would be prudent, as we bring these projects online, to pass on the two quarterly dividends, second and the third quarter and review the final dividend in the fourth quarter of this year. And we'll be switching back to making six-monthly dividend payments in 2014.

  • Moving on to the team, we do have a fully committed and experienced management team here; you know most of them. The transition has been relatively smooth. It's not been without its teething challenges, but we are working through that. Importantly, the Executive team is fully committed to AngloGold Ashanti and the challenges the business is going to face, not just AGA but the gold industry, over the next 12 to 18 months.

  • What we have done is got greater focus, from an operational and technical point of view, narrowed the focus and put the operations and technical hub under three of the operators. And I apologize here on behalf of Graham. Graham was here last week, but he couldn't join us in this call. He's gone to Tropicana this week to basically supervise the additional commissioning that is going on in Tropicana.

  • But if I can spend a few minutes just looking at the operational hubs. Ron Largent is our Chief Operating Officer, International, and he's currently taken on the Americas portfolios, which he has anyway, both North and South America. Our Continental African portfolio has transitioned under Ron, and he's also driving the direct cost saving initiatives across the mines.

  • Mike O'Hare, as you know, knows the old bodies in South Africa backwards. He's managing the South African portfolio, spending a significant amount of time at the mines right now.

  • With regard to Graham, Graham is still overseeing the Australia portfolio and, until the projects are commissioned and reach steady state, he's also taken on the planning and technical portfolio from Tony O'Neill, and the exploration portfolio globally.

  • Between these three operators, I did my calculations yesterday, they have close to 105 years of operating experience between the three of them, just the three of them. So we are not short on operating talent.

  • Moving on to perhaps the most important slide from my presentation is, how are we tackling the challenges facing AGA head on? And here we are looking at it from two aspects; revenue enhancement and also cost reduction, thereby opening up margins as we go into 2014.

  • The two new projects, Tropicana and Kibali, are coming on stream. They are due to add between 550,000 to 600,000 ounces in 2014 at a below average cost of where we find ourselves in. The two new projects are coming on time and on budget. In fact if any, Tropicana is perhaps a little early. We're looking at targeting gold pour this quarter, the third quarter, and we are pleased that our joint venture partner and operator, Randgold Resources, their CEO commented that they are targeting a gold pour in the month of October. So these are good news coming in which will change the quality of the cash flow and the operating costs.

  • At the same time, we are proceeding with the Cripple Creek & Victor expansion in Americas. It starts to produce incremental gold in '14, '15 and beyond. It extends the life of the mine and it is a quality asset within the portfolio.

  • Whilst at the same time bringing these projects on stream, what we are also doing, with the help of the three operators, is looking at all of our mine plans. We are planning for, potentially, a conservative gold price. We are looking at $1,100 base potentially but looking at various upsides and downsides within our planning schedules. And we are spending the next five to six months re-planning all of our operations.

  • Some of the operations will be relatively un-impacted. Some assets won't make it. Some of them may end up mining stockpiles for a period of a year or two, and some of them would be earmarked for closure, care and maintenance, or to be sold. At this stage, we do not want to speculate where it would be because we are going back to clean sheet design and starting the mine plans from scratch effectively, and looking at how we are going to change this. And that exercise is being headed by Graham with support from both Ron Largent and Mike O'Hare.

  • Whilst at the same time of dealing with the revenue, we're also attacking cost in a fairly aggressive manner. Project capital comes down next year, as you'd appreciate that currently, in 2013, we have $1 billion of project capital spend. That should reduce, given that Tropicana would be completed and Kibali will only have an element of underground spend, but it will be bringing in cash flows. We are looking at our capital cost targets for next year, and we'll provide guidance at the time of our annual results.

  • Likewise, we are looking at our sustainable capital costs as well, which have increased year on year, and looking at how we can tackle that by bringing it down by putting greater emphasis on asset integrity. At the same time, Ron is looking at the direct cost spend across the mines. And if you remember, we said we're looking at taking $100 an ounce across our direct operating costs when we met last time, over an 18 month period. That exercise is ongoing, and Ron will give you initial indications of what we are seeing at the mine sites.

  • The key here, from an operating point of view, having been the CFO of the Company, of the enlarged entity, for close to 12 years, if you want the operators to start making the changes, you've got to lead from the top. Show by example. Therefore, any reductions in terms of costs have started from the Executive. We have trimmed down the size of the Executive from 13 to 10. That's a reduction of over 25%. And at the same time, on a payroll cost to Company that has dropped by around roughly 35% to 40%.

  • So what we have also tackled in that process is looked at our exploration costs and corporate savings, and there are separate slides here which we'll come on to, but we have looked at that fairly closely for the last six months. And if we can begin with capital discipline first, then exploration and then our corporate costs.

  • Starting with capital discipline, Stewart. In terms of capital discipline, we have not touched the capital spend in terms of our key anchor projects, Tropicana and Kibali. That would have been the wrong move. And we have continued with the capital spend given that they bring in gold at the time when we need it.

  • What we have however, done, in addition to suspending the Mongbwalu project and pushing out the Sadiola Deep Sulphides project, Mike has looking at Moab Khotsong and Mponeng. At Moab, he has postponed whilst he is looking at alternative options with regard to Moab. At Mponeng, he's looking at a different way of carrying out the deepening project, and that has actually been slowed down. Most of these cuts are coming in, in the second half of this year, 2013, and we are looking at removing between $100 million to $150 million of capital spend.

  • We have then explained Cripple Creek & Victor expansion is proceeding, along with the Obuasi ramp, given how it changes the mine profile, going forward. And we have also talked about the mine plans which are being re-planned at quite conservative gold prices. As Graham correctly says, you can't go with a single plan for each asset. You've got to have multiple approaches which you will change, depending on where your view on the price changes in terms of a long-term potential.

  • What we have also done is we are in the process of implementing an ERP project which has gone live in South Africa. It has also gone live in Australia; it's gone live in Argentina; it's currently looking at transitioning in Brazil and Americas. We'll complete that and we are then taking a pause with regard to the Continental African portfolio for implementing ERP, and that's a saving of $113 million over three years.

  • We have gone about this quite methodically and scientifically and not purely as an accountant, simply looking at what number is tolerable and working backwards to that number.

  • A similar approach has been followed with regard to exploration, and I know AGA has been criticized for the level of exploration spend in the past. But one has to bear in mind, it was this level of expenditure which brought us Tropicana, we didn't acquire Tropicana from anyone, and it also gave us Colombia.

  • So exploration has been relooked at with better focus, and it's been effectively a bottom up approach, asking the exploration team where they think the best bang for the buck is. On that basis, we have reduced our expensed exploration and evaluation down by around $50 million approximately in the second half of this year.

  • And for 2014, we have locked in our exploration spend at between $150 million to $175 million. This is expensed exploration and evaluation spend, as compared to 2012; I think we spent over $460 million or $470 million against that category. That has been narrowed down to $150 million to $175 million.

  • To give you a flavor of that spend, expensed Greenfield expenditure is around $35 million to $40 million. Colombian investment is between $75 million to $86 million, to preserve the tenement and carry on more exploration work there because that's the long-term optionality.

  • And expensed Brownfield, it's not capitalized Brownfield, so we have not compromised the immediate order book of any particular mine. The expensed Brownfield expenditure is between $10 million to $12 million. And we have kept the SA technology project going, between $30 million to $35 million.

  • We have ensured that the core exploration skills are retained within the Company, to ensure institutional knowledge and continuity. And we have asked the exploration team where they believe the best bang for the buck is. The response was, around the Tropicana belt because it's a new mine and we have not completed exploration around the vicinity, and we are starting to see very good results come out around the Tropicana belt.

  • Likewise in Siguiri, again, going back to capital rationing, this is a mine which has delivered on its production targets. Every step of the way, it gets a higher allocation to basically bring in more feed to the plant. And an element of Greenfield spend in Colombia, which is narrower and focused.

  • What it means is that we're effectively withdrawing from 13 regions where we potentially don't have a mine site, given where the current market conditions are. We're not aborting those projects. We're looking at how best we can preserve some value by venting it into equity or taking some royalty kickers, etc., but we are pulling out of 13 regions and focusing on the key areas.

  • Looking then on to corporate costs, which is quite a key area which will be looked at by our operating colleagues across the mine, because they would certainly want the corporate to lead by example.

  • Corporate costs, to recap, in 2012 were $291 million, close to around $80 an ounce, and they are forecast for 2013 at around $240 million. If you remember, we said we are targeting a saving of $50 million.

  • We are leaving the guidance for '13 unchanged, and I'll explain to the logic to you later on, because often, when you start making reductions in corporate costs, there is a time lag for these to kick in. But we are looking at targeting our corporate costs for 2014 to between $120 million to $140 million.

  • Here, these are costs which are incurred outside of the mine area and we have gone about this quite methodically. We are running the budgets in advance, three months in advance, so that we have a clear line of sight of whether the $120 million/$140 million is locked in quite early before we go into the next year.

  • This has followed two initiatives; one, an extensive organizational redesign, which has identified and eliminated areas of duplication, which has happened over a period. And as a result of streamlining management structures, some of the roles no longer are needed.

  • We have also taken a decision that we need to put technical support closer to the mines, rather than people arriving from head office, saying I'm here to help you, advise and report. We have put people closer to the mine site and the operations where the help is needed. And we are quite in an advanced stage of removing around 40% of the global corporate roles across the business.

  • To give you a scale of numbers, across the globe, we are looking at around 2,000 employees who are not based attached to a mine or a plant. By the end of this year, we're looking at removing 40% of that roles; that's across Greenfields, Brownfields, corporate costs, regional costs, country costs, etc. And we are closing down a number of small satellite offices, which we have in a number of countries.

  • Whilst, at the same time, payroll costs are being tackled, we are also looking at indirect spend across the Group. You would have seen in the flat screens as you walked in, a number of cost-cutting initiatives flash up. And that's what you see wherever you go in the building, just reminding people to be frugal.

  • We have cut down the use of consultants. We're rationalizing travel spend, using better communication means, looking at the IT costs, etc. So looking at every dollar within the business which can be rationalized because once this is done, it's a permanent saving going out into the future. And when you do the NPV analysis of what $400 million is worth every year, it's quite a significant amount.

  • Although there is a time lag in terms of corporate cost savings coming through, given notice periods and termination payments, etc., quarter on quarter, you would see a 13% reduction in our corporate costs, including separation costs.

  • And exploration, although was flat quarter on quarter, for those analysts in the room, you will know our quarterly profile tends to step up when you look at corporate costs and exploration, but we have held that flat.

  • What management is committed is to exercise diligent oversight to ensure that this cost creep doesn't occur when the price were to increase, probably next year or so. We wouldn't be spending more money, just because the price has actually gone up.

  • So to summarize, in terms of where we have got to in our overhead reduction, and this is as we go into 2014, in 2012, the collective spend was around $760 million, give or take around roughly $200 per production ounce.

  • We have taken that down to around $600 million in our initial guidance, and we have pulled that down further. It is quite aggressive. We'll do our best to meet that in terms of the remainder of the year. And bear in mind, most of these savings come in only in the last six months of this year.

  • But importantly, when you compare the 2014 spend compared to 2012, there's a saving of around $460 million, equating to over $100 a production ounce, based on where current production levels are. That's quite a big saving, which will flow in through our all-in sustaining cost and would provide the tailwind needed for Ron, Mike and Graham to start impacting on the operational cost savings.

  • With that note, I'll hand you over to Mike O'Hare.

  • Mike O'Hare - Co-COO

  • Thank you, Venkat, and good morning to everybody. I think a great start from Q1 of the beginning of this year. The challenge was always going to be to replicate and improve on that in Q2.

  • Unfortunately, we tripped over in April, coming out of the Easter break, and that really set us back for this quarter. The key issues during the quarter probably at two mines, firstly at Mponeng mine, where the grade continues to decline, as we predicted. The bigger issue being, however, that we just didn't mine the required volumes.

  • The volume was impacted by the very unfortunate fatality we had in April and late in March. We have changed the management team at the mine, and we're now refocusing on those key mining issues, which will increase the volume we mine at Mponeng. Early green shoots show that we appear to be successful, and I'm confident we'll get Mponeng back to where it needs to be.

  • During the quarter, a number of employees were dismissed for an illegal strike at Moab Khotsong. The subsequent reorganization that needed to take place took us quite a while to get done, but I believe my Moab Khotsong is now back to where it should be.

  • Surface sources continue to be stable, and we're very happy with the improvements that we've seen since acquisition at Mine Waste Solutions or First Uranium where tonnage treated is now 40% higher than what it was doing when we acquired the ore body.

  • Because we've been able to use our own tailings facilities, which are higher grade than the ones we've purchased, we've managed to increase the incoming grades by over 15%. And the project to start producing uranium from that acquisition is going ahead nicely, and we expect to produce the first uranium in early Q4.

  • An added benefit of that uranium production will be that we will also be able to increase the amount, the recovery that we get from the gold circuit.

  • If I move on to the next slide, which is really talking to the key challenges for the South African region in the shorter term mostly, but definitely impacting on the medium term.

  • I think firstly, finding a sustainable solution to the 2013 wage negotiations is an issue that's occupying many hours of my time and Venkat's time. The industry, as we all know, is seriously challenged with a radically decreased gold price, rising costs and bedeviled by a decreasing level of productivity.

  • The gold producers bargained together under the auspices of the Chamber of Mines, and we have now got to the point where an independent mediator has taken over. Two meetings have been held, at which the gold producers have put forward their proposals and unions have put their side of the story to the mediator.

  • It's pleasing to see that all the unions and associations have remained involved in this process. That process is one now that will unfold as the mediator moves through the process envisaged.

  • Clearly, as a Company, we would like to find a win-win situation, but it has to be a sustainable one. We clearly understand that the events of August last year should not and cannot be repeated this time around, and we understand what this wage negotiation means, not only for our Company, but really for the gold industry and the country as a whole.

  • The drop in the gold price creates the margin squeeze, which means we need to react in a restructuring manner, and we have tackled this in three different ways. We've firstly done a detailed analysis of our regional overheads as opposed to what Venkat talked about which are our corporate overheads.

  • We've looked for duplicated work. We've looked for legacy work, and we look for those areas that we would loosely term nice to haves. We've decided where we would like to change, and that work of restructuring or streamlining is being undertaken as we speak.

  • The second area we looked at was mines that have shrunk over time. A number of these have been put together under a single management team. For instance, Great Noligwa and Kopanang are now managed under a single management team, as well as Savuka and TauTona.

  • The third area is that each mine has received a benchmarking template, against which, they are now able to do a fairly aggressive zero-based budgeting. We expect to complete the planning work by the end of August and hope to have the full implementation done at the end of November, so that when we start 2014, we're already at the kind of restructure that we need to be.

  • The third challenge is looking at our capital spend. We've already mentioned that we've reviewed the Moab Khotsong project and decided to postpone that project for a couple of years whilst we review alternative ways that we could access that reserve.

  • The Mponeng Phase 2 project has been slowed down, so effectively what that means is that the project life is extended by one year.

  • We've also done a careful analysis of our ore reserve development spend, and particularly looked for those areas where we had developed a long way ahead of the mining plan, and we've been able to slow down some of those expenditures.

  • It's critical that we see the real drop in those capital amounts in Q3 and, certainly, that would accelerate into Q4.

  • There's been a significant productivity decline, I think, across the industry, but we certainly look at 2012 versus 2011 and we note the drop between the two years. Our challenge is that, in 2013, we are not yet going back up the productivity curve.

  • The areas that we're focusing on, from a management point of view, that we believe are the two single biggest drivers of productivity outside of the macro issues that we have very little control over like a declining grade or an increasing depth or distance of travel for our people to get to the face, are really the two issues of proper planning to ensure that each and every mining crew has a productive working place to work in, and that we do via the BPF process which we've talked about over many presentations.

  • The implementation of the ERP system that Venkat talks about is now allowing us to integrate both the BPF work and the ERP work, and we've seen significant benefits in the Vaal River region where we've implemented the most aggressively from putting those two together and managing according to those principles.

  • We're currently rolling that system out at the Mponeng mine. The manager who is managing that mine comes from the Kopanang region, which led the planning process, and I think we understand what it is we need to implement there.

  • The next piece would be the mining rate piece. In other words, are the crews blasting enough, and is their frequency high enough and are they achieving the correct advance per blast?

  • We have three focus areas that we're tackling and this is really back to basics in mining. That would be looking at, on a daily basis, the actual advance for each blast we get; the frequency of the number of blasts; stope width, which clearly helps your productivity and improves your dilution numbers; and then lastly, our mining is really about logistics, ensuring we can get the rock out and we can get the material in.

  • However, we need a different and an improved mining method. We've said on a number of occasions that we think we've found a solution and we are investing significantly in the technology that will allow us to improve the way we mine in the deep-level South African mines.

  • I'm happy to talk about the fact that we've now decided on what machines we want to do our reef boring with. We've designed the machines; we've ordered them; they're currently under construction. So we should have four machines arriving at site ready to start drilling reef in the first quarter of 2014.

  • Our new cutter heads have been delivered. We redesigned the geometry of the cutter heads, and we're very comfortable that that cutter head will improve the penetration rates that we currently have.

  • The drilling, the geological drilling, is an important part of this process, and the troubles we were experiencing going beyond 100 meters of drilling with the RC, we think we've found a solution to that problem as well. We're just awaiting the arrival of a stronger drill rod string which should allow us to put more pressure on that string, which will increase the penetration rates. So that work's going really well.

  • We need to ensure that we have sites for these technologies to go into. And we remind ourselves that what we said is that we're going to target areas of our resource which currently aren't in our reserve.

  • You'll see we've targeted our construction sites at the shaft pillar areas in the Vaal River region -- sorry, in the West Wits region. These are areas of very high grade that we retreated from a number of years ago, when we felt they were too unsafe to mine.

  • You'll see there that three production sites are being constructed in that area at TauTona mine, and the fourth one, at Kopanang, where the intention here is really to see whether we can drill out a very narrow reef band.

  • The success of this is important because we have a full-blown reef, what we would call a marginal reef or a secondary reef in the Vaal River known as the C reef. This kind of technology would be then applied to that kind of reef to make that reef profitable.

  • So I think we're progressing well with the technology, and we'll keep you updated.

  • With that, I'll hand over to Ron, who's going to talk to us about the Project 500.

  • Ron Largent - Co-COO International

  • Thank you, Mike. Good morning, everybody. I'd like to start and maybe add to what Venkat was talking about on some of these structural cost changes that we're in the middle of in the Company.

  • In reality, these costs, I'll probably do a little bit more discussion on the direct operating costs, but it's an inclusive structural cost work across [the] business, capital, project capital and overheads, of course, what Venkat detailed quite specifically. But I wanted to talk you through a little bit how we're doing, because the key that I keep getting asked is, how do you make this structural, and probably is a good question.

  • But I think that's the key to the whole project. We've talked about a lot in the past, the project one or the business process framework, that is the platform which you have to have. You have to have some sort of platform to do structural changes in anything you want to do.

  • So we're using that; that's a framework that gives us data, that gives us history, that gives us efficiencies, however we want to pull data from the sites. With that, we were taking a multi-disciplinary team and going into our sites, taking the data, going into the sites. The sites are the management of this, it's the GM, and identifying specific areas of how to change. It isn't to say, let's change the use of explosives; let's get more hours out of a set of tires. Those are the outcomes of work you can do.

  • So I think you have to go through and really get into the identification of how you change this; it has to be a site-specific and site-led project. With that, we started with four sites; Geita, Moab, Cuiaba and Siguiri were our pilot sites.

  • Of course, we've made changes since we started those sites, but we've had some very good outputs. And what I mean by that is, we were able to change as we moved into CC&V and Sunrise Dam, and now we're currently hitting Serra Grande and Cerro Vanguardia that the team is starting to understand, when we get there the site's actually already done most of the work.

  • And when we get into this it's like tearing apart your contract mining aspects. It's not just, can I get cheaper, it's how's my mining plan? What have I changed? Peak power demand management through downtime of operations; it's optimizing the life cycle of HME equipment.

  • And if we didn't have the BPF work being done with, maybe it's a little bit too much detail, but if we weren't into building our work management systems, we couldn't get into project life cycles on engines, transmissions, those sort of things. So for example, at Sunrise Dam there's 20-some-odd projects that end up creating about $25 million worth of savings, and there's a commitment to that.

  • So I go through that very briefly and there's a lot to it. But the bottom line is, we're getting excited about it; [they're] the ownership of them. And what we've been able to do is use all the work we've done in the past few years in setting up a framework that now allows us to really go in, take work we've done from one site and the output goes to another site, change it around, see how that impacts, and we're having some very good success.

  • And the ultimate outcome is to be led by the sites, so it's continuous and it is in our business plan for 2014. Next slide.

  • I will spend very little time on this, but what I want to say is, there's a process, there's an analysis; you've got to get to site, detailed planning and implementation and tracking. And I think that some of the keys come back to, there's all about identification, prioritization and, ultimately, getting into your business plan.

  • And it's surprising, I think this is some of the best outcomes that we've seen from the process framework that we've done over the last few [years]. All the hard work that we've done to get our work management systems put in place across our sites, this has become a very real and fast moving cost savings initiative. So that's what I'll say on the -- hopefully, the outcome is quarterly as we start seeing cost reduction will be the arbiter of the whole process.

  • Okay, going onto the Continental Africa region, I guess the highlights I'd like to point out is production increase for the region to 343,000 ounces, and we had, primarily on a production increase, a cost per ounce decrease. But a few of the highlights, I think, should be brought up is that the Geita production increased to 113,000 ounces. That's on the heels of quarter 1 where we had the planned downtime of the SAG mill, but they ended up with a decent quarter following up the first quarter's reduced production.

  • Siguiri, sixth quarter in a row that they've met or exceeded the targets; continue to have good output for Siguiri. In Obuasi the transition to owner development continues and, at the end of the quarter, we've seen an increase in underground ore production by about 20% at quarter's end.

  • Additionally at Obuasi, as per our Board approved project, our decline development for new access to the underground is well underway. We're greater than 250 meters into the decline, which changes our access and a lot of our optionality as we move down the road at Obuasi.

  • At Kibali, just an overview of what's going on. First gold pour, as Venkat said, before the year's end; I think Mark has stated October, Venkat? But I think there's some key points there, and there's more than 1 million tonnes on the ground of open pit ore ready for the mill. The underground mine is progressing well and, as far as the ultimate asset, we still maintain the project is 485,000 ounce at 100% at $750 per ounce. That's still the ultimate long-term project at Kibali.

  • The next slide just shows a few pictures. I guess instead of just saying that Kibali's on its way, here's a pictorial view of the mechanical works at Kibali, meaning the CIL tanks, flotation banks, the gold room and the generation farm. So it's well on its way and, by the next time we talk, we should be very close to having it in our outlook for gold production.

  • As far as the Americas, constant production at 235,000 ounces at $733 dollars per ounce. The largest cost increase was in Brazil; we had a lower byproduct, but we also had lower production out of the Cuiaba mine, so those caused the cost per ounce to go up considerably in Brazil.

  • Cerro Vanguardia continues to be challenged, cost challenged, with the inflationary environment. Their production has been very consistent, but it is a challenging environment to control costs. We've identified areas to impact that, but as you guys see over the past few years, it's just been an inflationary nightmare to work on a cash cost basis in Argentina.

  • The other project in the portfolio that we have is, another one, is the CC&V expansion project. I guess the major milestones at CC&V that we can report on is, engineering is at 99% complete, a few little things to clean up there. And the major contracts have been awarded for the civil and mechanical work for the -- currently the earth moving is going on for the new heap leach facility, and the first concrete has been poured at the mill site.

  • The best way I think to report back on this, in a project sense, engineering and your construction, if you aren't on budget and time at that point, you're maybe challenged to get to the end of the day on time and on budget. And right now it's on budget, on time for quarter 4 completion, 2014.

  • In Australia, of course it's Sunrise Dam. You can see that Graham is not here, as Venkat said, because he's out spending time at the commissioning of the Tropicana project. Sunrise Dam had, by numbers wise, a challenging quarter, but I think that the main cost addition was doing the work to access the Crown Pillar between the open pit and the underground. And those benefits will be in quarter 3 and quarter 4, you will see those benefits come out of Sunrise Dam.

  • I think the exciting piece is the Tropicana project with commissioning for first gold in quarter 3, 2013. The next slide is -- we have a few just on Tropicana. I think, where we sat as of a couple of days ago, the commissioning of the dry and wet plant are well underway. The power house and the tailings facilities completed.

  • We've been mining for a full year, which I think is key, in preparation for the startup. And I think, at the bottom of this slide where we talk about grade control, is always a key indicator of our next step, which is producing to the production plan that's been set at Tropicana. So having initial grade control results in line with resource model is very key.

  • This next is a couple of pictures; you can see the first draw through the conveyor on the down side or the product side of the crusher. And the next slide is the mine, and again I go back to since we've been talking about commissioning the plant, and the capital around the plant, I think it's also key to say the mine operation is set to feed it ore when the initial operations start.

  • And I think one last slide on Tropicana, which I think is also a positive where you've got throughout the implementation by Graham and his team and the construction of the asset, they have been also able to improve, really, the validity of that ore body and take the ore reserves up close to 4 million on a 4 million ounce resource through that same timeframe. So we're looking forward to this production adding to the portfolio of AngloGold Ashanti as it starts producing in quarter 3.

  • So with that said, I'd turn it over to Richard.

  • Richard Duffy - CFO

  • Thanks, Ron. Our adjusted headline earnings for quarter 2 were a negative $135 million as compared to a positive $113 million in quarter 1. Reasons for this reduction include a much lower gold price, $1,421 an ounce, versus the $1,636 an ounce in quarter 1, which contributed some $140 million in lost earnings after tax.

  • Inventory lockup of gold resulting in 15,000 ounces of gold being produced but not sold, and then the net realizable value writedown of ore stock piles totaling $125 million, indirect tax provisions of $15 million, and corporate restructuring costs of $4 million.

  • After adjusting for these exceptional items, this results in adjusted headline earnings of $9 million.

  • On July 15, in our pre-quarterly announcement, we noted that we would be booking an impairment of between $2.2 billion and $2.6 billion in quarter 2. The review of the carrying value of our mining assets, including ore stockpiles, was in accordance with international financial reporting standards, given a number of indicators that had changed, including a sharp drop in the gold price, higher discount rates, and a reduction in our market capitalization.

  • The impairment has now been finalized at just under $2.4 billion, post tax. Impairments of our Continental Africa assets totaled $1.56 billion, $608 million in the Americas and $213 in South Africa. Importantly, these charges do not impact our cash flow, and are excluded for the purposes of the financial covenant included in our banking agreement.

  • Turning to the balance sheet, at the end of the quarter our net debt had increased to $2.78 billion, largely as a result of funding capital expenditure and compounded by the lower gold price.

  • Our net debt to EBITDA was 1.56 times, well within the loan covenant on our bank facilities of 3 times.

  • The successful issuance of the $1.25 billion seven-year bond at an 8.5% coupon eliminates our refinancing risk around a $733 million, 3.5% convertible bond which falls due in May of next year. It improves our debt maturity profile and provides additional liquidity of around $500 million, as Venkat has mentioned.

  • We have also launched a tender offer for the early redemption of the $733 million convertible bond which expires on the 25th of this month.

  • As the result of this refinancing, the $750 million standby facility is no longer required and has been cancelled. In addition, the new $1.25 billion bond has been structured to provide us with some flexibility through an early repayment option.

  • Once the $789 million, 6% mandatory convertible bond has been redeemed in September of this year through the issue of just over 18.1 million shares, our net interest charge will increase by around $30 million.

  • Turning now to the outlook for quarter 3 and the full year. In quarter 3, production is forecast to be between 950,000 and 1 million ounces at a total cash cost of between $860 to $890 an ounce, which incorporates the ongoing winter power tariffs and the impact of the annual power increases in South Africa.

  • For the full year, as detailed in our pre-quarterly announcement on July 15, we have reduced our annual production guidance to between 4 million and 4.1 million ounces.

  • We are projecting a strong second half of the year with the two new projects, Tropicana and Kibali, coming on stream, as mentioned by Venkat and Ron, Sunrise Dam accessing the higher grade Crown Pillar, and Geita having two full quarters of production following the extended shutdown of the SAG in quarter 1.

  • We have also allowed for the removal of unprofitable ounces at these lower gold prices. Our cash cost outlook for the year remains unchanged, at between $815 and $845 an ounce, with the lower guided production being mitigated by weaker local currencies.

  • We expect our all-in sustaining cash cost for the year to be around $1,200 an ounce, this is based on the World Gold Council measure, which includes our total cash cost, sustaining CapEx, and corporate overhead.

  • Through the revenue enhancement from Tropicana and Kibali, and the cost and capital reductions outlined by Venkat and Ron, we are targeting an all-in sustaining cash cost of $1,000 in 2014.

  • With that, I'll hand back to Venkat to wrap up.

  • Srinivasan Venkatakrishnan - CEO

  • Thank you, Richard. If we can then wrap up quickly and leave this marker for the next quarter's presentation; our key areas of focus, the strategic priorities still remain the same.

  • We are certainly looking at the volatility in the gold price and are taking a preemptive position to weather the storm in the event of a low gold price, and if the price recovers we maximize margin.

  • 2014 has got a number of events in the macro level, in terms of the quantitative easing, and the Central Bank Accord coming up for renewal, etc., so it's best to be cautious in terms of the gold price.

  • At the same time, we want to preserve the long term optionality at a reasonable cost, because markets and industries go through a cycle. If the US were to recover, then inflationary fears will set in over time, which would provide long-term support to the gold price.

  • If US recovery indeed doesn't happen, then we will start to see QE come through again in a different form, and that would again start supporting the gold price. So preparing to brace ourselves during the low gold price environment, but keeping the long-term optionality intact.

  • To realize savings across the portfolio, and we hope to provide more markers in the next quarterly call, and when we stand here same time next quarter, we'd like to be able to show and report production from both Tropicana and from Kibali, fingers crossed.

  • At the same time, Charles and the team are looking at options around sales of some of our assets and partnership, wherever it's appropriate, and we are keeping our focus on the balance sheet and a preemptive refinancing to bolster our liquidity and our debt maturity profile.

  • So with that wrap up slide, we're very happy to take any questions, and apologies for a long presentation.

  • Adrian Hammond - Analyst

  • Adrian Hammond, BNP Cadiz. I have a couple of questions; I'll just list them. Firstly, the issue of your new bond at 8.5%, do you not think you're a bit conservative in that number, considering it was oversubscribed?

  • Secondly, the asset writedowns you mentioned in the three key regions, could you just give the top -- the assets in those three regions, just the first asset as to which one incurred the largest writedown in each region?

  • And of your outstanding, or of your debt facilities at the moment, what debt can be called and what are the covenants pertaining to that debt? Thanks very much.

  • Richard Duffy - CFO

  • Thanks, Adrian. Okay; if I just respond to those. The first question was around the bond, the $1.25 billion bond, and whether we shouldn't have taken a bit more, given the oversubscription.

  • I think when we looked at the investors in the book build, we looked at our requirements in terms of liquidity and refinancing, we felt that taking $1.25 billion was appropriate, given that we could settle and refinance the convert, the $733 million, and have an additional $500 million in liquidity.

  • So we didn't want to over-gear the balance sheet; we think that the $1.25 billion meets our requirements, and gives us sufficient space to go and restructure the business, as Venkat has said.

  • Also, going above that would have started to see the coupon go out, and we thought that, for all of those reasons, settling where we did was appropriate for the business.

  • If I talk to the impairment question which was, can we give a sense of where the impairments specifically happened, really if you look at the assets in Continental Africa Obuasi and Geita, South Africa Moab Khotsong, in the Americas CC&V, AGA [Minera Sol], really represented about 80% of the total impairment, and the impairment across those assets varied between $200 million up to $700 million.

  • So those assets, and it is in our quarterly if you want to just check them up again, represent about 80% of the impairment, and the range on those assets $200 million to $700 million.

  • The last question, if you could just repeat that for me, please?

  • Adrian Hammond - Analyst

  • Banking covenants, what are the covenants?

  • Richard Duffy - CFO

  • Okay, what are the covenants. We have one covenant on our banking agreements, and that's a net debt to EBITDA ratio which cannot exceed 3 times. As we reported, that net debt to EBITDA was 1.56 times at the end of June. The way it works is, every six months we have to test the covenant, so we test it again in December.

  • We actually look at it in February, but it's for the December period and you look back over 12 months. That's the only covenant that we have, and it applies to our banking facilities, the two revolving credit facilities, the $1 billion and the AUD600 million.

  • Adrian Hammond - Analyst

  • Thanks very much.

  • Johann Steyn - Analyst

  • Johann Steyn, Citi. Just a quick question around Project 500; how can we measure the success of that, because I know with Project ONE, you always quoted that you managed to save $1.1 billion, etc. It's very difficult to judge that, given the fact that you didn't outperform your peers on the unit cost basis, but you didn't outperform your peers on a production basis. That $500 million that you guys are targeting, how can we measure that or reconcile that?

  • Ron Largent - Co-COO International

  • What I'm telling the Group is there's only one measurement and that's cash spent, right, in reality at the end of the day. So I think first we got to realize, and I go through this with the people working on it, is that the industry's had a cost increase, whatever you want to put on it, 8%, 10%, 12% per year.

  • We first have to flatten that, so our first objective is going to be how do we maintain a cost instead of seeing an increase. And secondly, it will be where can we drive -- and I'm not looking at cost per ounce, I've got to look at direct costs out the door. So our measurement will be, ultimately it's cash cost, it's a measurement, but the cost per operation out the door will be our measurement.

  • We first have to reduce it. We've got to compare '12 where we are in '13 because when you go through and, maybe this won't answer your question, and we look at labor across the globe, again it's anywhere from 3% to 25% increases, so you have that challenge. Then when you break it down and you look into consumable cost of cyanide, tires, lime, diesel, whatever, you get into contracts and you look at them in each country, and you constantly see this every year creep up in costs.

  • My point is that may be true but, ultimately, we've got to get the accumulation of all the direct costs to first flatten out and then drop off. So to me, there's only one. If we spend $400 million at this site on a per annum basis, what are we spending on month to month and break those down and look at a cost reduction. That's the only way I can measure it is on a total cost basis.

  • We can measure each little project we work on, whether it's save consumption, increased throughput, reduce tire, we can measure them but, ultimately, it's got to be on a cash spend. There's no other way for us to do it in the industry, in my opinion.

  • Johann Steyn - Analyst

  • No, I understand, but it's just with corporate costs and exploration costs, we can quite clearly see next year whether you've delivered on those targets. But $500 million, you can tell us you've saved it; we won't have a clue if you really did.

  • Ron Largent - Co-COO International

  • No, and I think that's up to us to somehow bring it back. And ultimately, it's got to show up in a cash cost per ounce.

  • Srinivasan Venkatakrishnan - CEO

  • That's exactly right, Johann, you've got to show it in a unit cash cost per ounce, and if there's an element of inflation, but the savings will break it down.

  • Johann Steyn - Analyst

  • That will allow you to outperform your peers, on a unit cost basis, you believe?

  • Srinivasan Venkatakrishnan - CEO

  • We believe it would. I think it's not just that initiate alone; it's a combination of all we outlined on that slide.

  • Johann Steyn - Analyst

  • Maybe just a question then on the intended asset sales at this stage. Are there any buyers at this stage? Have you engaged with people that might be interested in buying some of your assets, and I think there are probably 10 assets that I can think of that should be disposed of. Early indications where you guys are in this process?

  • Srinivasan Venkatakrishnan - CEO

  • Early indications as we said, firstly where you're correct is the market currently is not necessarily the most favorable seller's market, as you'd appreciate, given number of assets available for sale. I think one has to be realistic about it. Therefore, one has to also be careful that you are not giving away assets for knock-down value, only to find that, further down the line, you've probably given away value purely because we were operating and shooting from the hip or panic mode.

  • So the assets we identified for sale, obviously the one which we announced at the last call was [Navachab]. That is progressing as we had originally anticipated. Interested buyers have been shortlisted; we are in discussion with them. A couple of them have required funding and, therefore, we've given them time to basically get funding.

  • As far as Ron is concerned, his objective is to have a plan to operate the asset if the sale doesn't happen. So that's the only one we can put out in the public domain at this stage, because we have completed the consultation process. The rest of it, Charles is working on, and the only time we'll be able to announce is after we have done the full consultation, unfortunately. [You'd] appreciate it.

  • Johann Steyn - Analyst

  • Thanks. One last quick question, if I may? Just the restructuring charges that you guys anticipate with all the corporate costs being cut, what kind of restructuring --?

  • Srinivasan Venkatakrishnan - CEO

  • It's a good question, Johann. We are assuming, and that's one of the reasons where we are [receiving] probably a $20 million, $30 million saving in corporate costs for the year and that is likely to be eroded with notice period, terminations, people taking leave, etc. But the payback is within a one-year period, so that's why we have kept the corporate guidance intact for the year and only banked the $50 million saving.

  • Johann Steyn - Analyst

  • Thanks.

  • Srinivasan Venkatakrishnan - CEO

  • Sorry, that excludes any other thing; you're talking just the corporate restructuring, so that's right.

  • Allan Cooke - Analyst

  • Allan Cooke, JPMorgan. Will you be reporting the new industry standard all-in sustaining, all-in costs disclosure? I couldn't find it exactly in the reports. When you begin to do that please, Richard, could you give us the history of that number, if possible, if you see the definitions because those will be interesting, I guess, going forward? And what were they for this quarter? Do you have those numbers?

  • Richard Duffy - CFO

  • I can just do -- to answer the question, we haven't detailed -- or we haven't got the disclosure detailed in the quarterly -- under the World Gold Council process, they've targeted beginning of next year. We'll see whether we report sooner than that. But we did think it was sensible just to give you a sense, given that some of the companies have come out with that number.

  • So what we've said is for this year, we would expect that number to be around $1,200 an ounce; for this quarter, it was around $1,300 an ounce. As I said, all of the initiatives that we are currently engaging with and the focus around efficiency on sustaining CapEx, the cuts in corporate cost, we're targeting $1,000 an ounce, 2014. Certainly, when we do formally publish, we'll provide a little history so that you can see where we've come from.

  • Allan Cooke - Analyst

  • Thanks, Richard. Then Venkat, as the industry, not just AngloGold, moves its focus from growth to austerity, are you also thinking about when you look at the portfolio that this Group has, this very big portfolio, are you thinking about the size of the Group and including all options, not just looking at it asset by asset, but thinking of maybe a smaller group, spinouts of assets, the type of thing that the Barrick Gold fields and others have done in the past, is that still an option, or is that not something that's exercising your minds as you review the strategy of AngloGold Ashanti?

  • Srinivasan Venkatakrishnan - CEO

  • To answer that question, Allan, you never say never. That answer hasn't changed since the last few quarters where you've asked the question. It is part of the strategy review, as you would expect. Really, what we don't want that to do, however, is distract from the fundamental aspect of fixing the underlying business.

  • You've got to do this, and all of these overlays can happen subsequently or later. So that's still on the cards, but the primary driver here is to get the business to start to spin the wheels more efficiently and generate more cash flow, but all our options are on the table, 100%.

  • Allan Cooke - Analyst

  • Thanks, guys.

  • Chris Nicholson - Analyst

  • Chris Nicholson, RMB Morgan Stanley. Three questions, if I may? Just the first one is on your full year guidance. I understand you're still keeping 4 million to 4.1 million ounces at $815 an ounce to $845 an ounce. If I look at what you've done for the first three quarters and try to work back -- or what you're guiding for the third quarter and try and work back what that implies for the fourth, about 1.2 million ounces, but a cash cost is probably going to have to come down to $750 an ounce or so to get to the top end of that guidance. Is that realistic? That's the first one.

  • Second one, just to go back to Adrian's question earlier. Not in terms of the quantum of the bond you raise but the actual pricing, so the 8.5% coupon rate, I think the question referred to, given how oversubscribed that issue was, was that maybe perhaps a bit rich on your side, bit high?

  • Then the last one, this might be a bit more difficult to answer, but under your estimates, if we have spot price going forward, at what point do you see net debt start to come down? Is that a 2014 type of time horizon and when, sorry. Thanks, guys.

  • Srinivasan Venkatakrishnan - CEO

  • I think if I can answer those three questions here. In reverse order, yes it is in 2014. I think one has to be realistic. There is still a CapEx outlay coming for the rest of the year, and we'd expect the net debt to go up going into the third quarter, and even maybe the fourth quarter, before you start to see it come down.

  • The second question is in terms of the coupon and whether we could have priced the coupon. Just in terms of the 8.5% coupon on the bond, one has to bear in mind there was a rating action taken by one of the rating agencies. Another rating agency has kept us investment grade, but put a negative outlook; that has an impact on the coupon. It's also reflective of where the bond markets were at that stage.

  • Really, our balancing act in terms of coupon and quantum had to be done quite carefully, and as Richard mentioned, $1.25 billion was the sweet spot. We looked at even cramming down the quantum of the bond, but it was insensitive to the coupon. That was the conclusion we came to when we were doing the book build.

  • Going back to your first question, you are correct; the number is not far out in terms of your cash cost, etc., for the fourth quarter. The fourth quarter, the real upticks coming are Sunrise Dam feeding in the high grade from the Crown Pillar; the second area is around Tropicana coming on stream; the third is Geita having a better second half than the first half of the year, and the risk is around the illegal mining activity which was on the slide, which we are seeing on Geita. The final area is around South Africa having an uninterrupted second half of the year. It has got its challenges, but from what we see currently, it can be achieved if these four boxes can be ticked.

  • Stewart Bailey - VP, IR

  • All right. I think that looks like we don't have any more questions. Venkat, anything you want to say to wrap up?

  • Srinivasan Venkatakrishnan - CEO

  • No, nothing.

  • Stewart Bailey - VP, IR

  • All right. Well, thank you everybody for coming. We'll have some refreshments outside and you can engage with the team out there again. Thank you.