Anglogold Ashanti PLC (AU) 2007 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Charles Carter - EVP Business Strategy

  • Good morning and welcome to this presentation by the AngloGold Ashanti executive team of our results for the fourth quarter and year ended December 31, 2007.

  • Before we begin I'd just briefly like to go through basic safety procedures regarding this auditorium. In the event of a fire or other threat to your safety a siren will sound and information will be broadcast over the building's public address system. When you hear the siren please move quickly but in an orderly way to the nearest exit points. These are behind you to your left and behind me to your left and right. Having proceeded through these exit points please gather in the open space and then proceed to the west of this building where our safety wardens will advise additional procedures as needed.

  • Turning now to the presentation, the format will be as follows. Mark Cutifani, our Chief Executive Officer, will review AngloGold Ashanti's performance over the quarter and year, provide guidance for 2008 and provide some detail on the asset review process, underway together with first thoughts on the change in business strategy.

  • This will be followed by Venkat, our Financial Director, who will discuss our adjusted headline earnings for the quarter and year. We will then turn to Robbie Lazare for the discussion on African operations in detail while commentary on our international operations and exploration activities will be picked up by Mark during his presentation.

  • After these presentations we'll take your questions. Before we begin it is necessary for me to read a declaration regarding forward looking statements that will be made during the presentation. Certain statements made during this presentation, including without limitation those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, cash costs and other operating results, growth prospects and the outlook of AngloGold Ashanti's operations, including the completion and commencement of commercial operations or certain of our exploration and production projects, and the company's liquidity and capital resources and expenditure, contain certain forward looking statements regarding AngloGold Ashanti's operations, economic performance and financial condition.

  • Although the Company believes that the expectations reflected in such forward looking statements are reasonable, no assurance can be given that such expectations will prove to be correct. Accordingly results could differ materially from those set out in the forward looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in gold prices and exchange rates, and business and operational risk management. For a discussion of such factors, refer to AngloGold Ashanti's annual report for the year ended December 31, 2006, which was distributed to shareholders on March 29, 2007. AngloGold Ashanti undertakes no obligation to update publicly or release any revisions to these forward looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events.

  • In connection with the proposed merger transaction involving AngloGold Ashanti and Golden Cycle Gold Corporation, AngloGold Ashanti will file with the Securities and Exchange Commission a registration statement on Form F-4 and Golden Cycle will mail a proxy statement and prospectus to its shareholders and each will be filing other documents regarding the proposed transaction with the SEC as well. Before making any voting or investment decisions shareholders of Golden Cycle are urged to read the proxy statement and prospectus regarding the proposed transaction and any other relevant documents carefully when they become available because they will contain important information about the proposed transaction.

  • The final proxy statement and prospectus will be mailed to Golden Cycle shareholders and they can also obtain copies via the SEC's website at www.sec.gov. With that let me hand over to Mark. Thank you.

  • Mark Cutifani - CEO

  • Thank you Charles. For those that are aware, this is my first full quarterly or report after a full quarter, so I will be speaking a little longer and talk to a number of issues above and beyond what I would normally expect to do in a quarter. I would prefer to see some of the team doing a bit more of the talking but I think given this is my first full quarterly and that I've now spent four months within the business I think it's appropriate to spend a little bit more time talking to the issues. And obviously given some of the issues that we're working through at the moment I think again it's appropriate that I take that leadership and have that discussion.

  • With me we have some of our executives that during the course of the formal proceedings here I may ask to support with an answer on specific operating or other issues that are more appropriate for them to deal with. And they will be available to everyone outside the forum when we take tea and coffee after the formal proceedings. And I do encourage you to latch up to the team, particularly Eric, our exploration head to talk about some of the success we've had or any of the other issues you see as relevant during the course of today.

  • The only apology I do have is Ron Largent, our Head of the Americas -- new Head of the Americas. He does send his apologies. He is working reviewing leadership structures, key functions and the new accountability framework that we're rolling out through the business that is very important to the way we'll be doing business going forward and so, as I said, Ron passes his apologies.

  • It's been four months since I took over as CEO at AngloGold Ashanti. My tenure started with a bang with our completing a $3b secondary placement as our colleagues at Anglo America look at pursuing other interests and other strategic avenues in terms of their business. At the business level things have been eventful as we put in place safety initiatives, restructured the management team to ensure more focus and accountability on key issues, commenced our asset review and more recently started dealing with the power issues in South Africa. At the same time we've been busy looking at the business from a number of perspectives and we are building a clear sense of our strategic direction.

  • Based on a first impression, we are not delivering to our potential. We have started a process that is questioning every asset we possess, every action we take, and each strategy we've mapped for the business. The key question being, how does it add value? Consistent with asking the right questions and finding the right answers, we are putting in place the right people in the right place doing the right work. I would like to start with an overview of our performance for the quarter where I will outline the key issues we are facing.

  • This to me defines a starting point from where we are today and what it means for 2008. I will then outline how we intend to start reshaping the business, to work on our weaknesses and build off our strengths. Whereas you can appreciate these were initial impressions, the areas of critical focus are emerging very quickly and so I believe we can start some early strategy conversations, as we have promised, to help you understand how our thinking is developing and what will be some of the key elements of our strategy. We will consolidate this work at the end of March and report back with a view on growth and how we take the business forward in our March quarterly results.

  • To discuss performance we'll start with safety. In the first five weeks of the fourth quarter we reported eight fatalities, the loss of eight of our friends and colleagues. As at November 2nd we have reported the loss of 34 of our colleagues in 2007. For all of us at AngloGold Ashanti this is unacceptable. On November 8th we introduced our 'Safety is our First Value' campaign which accompanied a range of other collaborative interventions. Our partners in this work, our employees, union representatives and the Government, were aligned with us at our launch where we committed to work for and with each other to create a new AngloGold Ashanti.

  • While I will talk to this program a little later, I think it is encouraging or an encouraging outcome to note that at this point is that we did not report another fatal event in 2007 after the November 8 launch and in fact since November 2 in 2008. And 2008 -- in 2007 I'm sorry. And 2008 has certainly started off better than where we started in 2007.

  • On the production front, gold output was 5% down on Q3 at 1.37m ounces, following both planned and unplanned safety interventions in South Africa and the continuation of the poor and unacceptable performance at Geita. Cash costs of $404 an ounce were 13% higher, reflecting the lower production and the inclusion of some one off items that had been previously flagged.

  • The South African operations reported 9% lower production driven by lower volumes as a result of the fatal incidents in October and our broader safety related and other actions that we took on later in the quarter. As guided in the previous quarter, 300,000lbs of uranium was purchased to meet contractual obligations and the price dipped to around $75 a pound. As a result, total cash costs for South African operations increased to $405 an ounce, or $87,949 per gram per kilogram, up 14% for the quarter.

  • Despite the higher fixed cost base in South Africa, cost interventions were undertaken to minimize the impact of lower volumes and total cash costs, excluding the purchase of uranium, increased by only 4% quarter on quarter, demonstrating our ability to manage costs in these difficult times.

  • Looking at the operations in the Americas, they generally posted strong results. Starting with South America at AngloGold Ashanti's Brasil Mineracao operation production was 5% higher to 91,000 ounces. Cash costs took a hit following higher transport costs as we transported ore following downtime at one of the processing plants.

  • At Serra Grande production decreased 9% in line with the operating plan due to the lower grade material and feed from the open pit and Nova mine. While total cash costs were 9% higher at $292 and ounce, the adjusted gross profit improved 17% to $7m due to realized higher gold prices.

  • At Cerro Vanguardia in Argentina production improved 2% to 51,000 ounces due to higher feed grade. However, total cash costs increased 7% as a result of the lower silver by-product credits from lower sales. Gold sales were 30% lower due to ongoing discussions with the Government of Argentina regarding its proposed tax changes.

  • We believe that all stakeholders are important in the countries in which we operate and we will continue to work with the Government of Argentina on this tax issue and provide recommendations that should be beneficial to both parties.

  • At our North American operations, CC&V in Colorado, I'm pleased to report a solid quarter with production up 48% as solution flows and the leach pad normalized leading to increases in recoverable ounces. Total cash costs decreased 10% due to reduced royalty expense and improved production, while the adjusted gross profit increased by 87% to $28m.

  • In Australia, Sunrise Dam continued its positive run producing 150,000 ounces for the quarter, ending the year with a record 600,000 ounces. Total cash costs increased 19% to $392 per ounce owing to higher fuel costs and some inventory and stockpile movements.

  • In 2008, production at Sunrise Dam is expected to normalize to around 400,000 ounces as the high grade GQ lode has been depleted and we will produce from both stockpiles some residual open pit sources and the underground operations. This will see Sunrise Dam reduce its accounting contribution year on year as non-cash stockpile accounting entries are brought to book but the operation will continue to be a substantially cash flow positive operation.

  • Turning now to the financial performance for the quarter, the received gold price at $687 an ounce was 13% below the average spot price for the quarter as the Company continued to deliver a significant proportion of production into the hedge book.

  • Adjusted headline earnings for the fourth quarter were $18m. This is after some $64m in accounting adjustments which you will recall we flagged during the third quarter and to which Venkat will speak in more detail. I would just note that excluding these charges, adjusted headline earnings would have been marginally higher than the third quarter, despite the lower production and the material discount to spot pricing.

  • Looking at the year's results, starting with production which declined 3% to 5.5m ounces. This decline was largely attributable to a reduced contribution from Great Noligwa due to the lower grades mined in the SV3 area as well as lower ounces from TauTona where mining outside the zone of influence surrounding the shaft pillar was substantially redesigned following risks associated with safety assessments. These decreases were further exacerbated by the ongoing disappointing performance at Geita.

  • Total cash costs were 16% higher at $357 an ounce due to the lower production, stronger local currencies, increases in by-product losses, higher royalty payments, increased maintenance activity and the impact of [input] cost of inflation. Again, Venkat will break out some of these elements later in the financial component of the report.

  • Under the circumstances, I regard the cost performance as solid, particularly in the face of global energy and commodity input cost increases. In this context I think our performance relative to our global peers has been respectable but from our point of view still needs lots of work and there are still many opportunities for us to pursue to improve our position. We will continue to maintain our focus on managing our cost base through dedicated savings programs which this year has yielded $58m in sustainable cost reductions. These gains are in addition to the $73m achieved in 2006 and $160m in 2005. And based on what I've seen within the business, we still have a lot of opportunities to pursue and we'll be pursuing those more aggressively through 2008 and into 2009.

  • Adjusted headline earnings for the year were $278m following production reductions, high cost and the increased expenditure on exploration activities.

  • I've now been in the role for four months and I've visited more than half of our operations and sat one-on-one with more than 50 of our most senior managers within the business. In this context, and while reflecting on the results in 2007 and what it means for 2008, it is time to share with you my early observations and thoughts on the key issues going forward.

  • Again, let me start with safety. After putting in place some key interventions which followed some key changes made by Robbie Lazare in the third quarter of 2007 we've certainly improved off a disappointing base last year. For 2007 as a whole, the South African operations fatal injury rate was 17% lower than the prior year reflecting the good improvements towards the end of the year. And our Great Noligwa mine recorded its lowest number of fatalities since its inception.

  • I talked earlier about 'Safety is our First Value' campaign in which I set out seven key areas of action and redefined where safety fits and how we think about building the future. Higher productivity and efficient operations cannot be delivered without delivering safety. And we must look at all parts of the business through the lens of safety, the key to delivering sustainable and continuing improvement in our business. For us, safe operations must be a way of leading and way of managing continuing improvement in the business.

  • While the moral issues have been our starting point, as reflected in our 'Safety is our First Value' statement, the business context is no less compelling. In 2006 and 2007 we reported 37 and 34 fatalities respectively. In addition to the terrible suffering of families, friends and colleagues, the burden on the business was also significant. In 2007 we estimate 150,000 ounces were lost in production due to lost time and issues associated with rectification of safety issues. We should get it right the first time. In simple terms, from every aspect safety is simply the right business and the right business focus for AngloGold Ashanti. We are encouraged by the early results. A 75% decrease in our fatality frequency rates, but we are still very cautious and will continue to lead and persevere with change at every level in the organization.

  • Finally, to offer a word to our employees who are tuned into this broadcast, and their families, on November 8 safety became our first value, our core belief. We will redefine AngloGold's future and its commitment to its employees around safety.

  • As with safety being a personal priority, the South African power situation is now our most urgent immediate issue for the management team. As everyone is well aware, following recent announcements and widespread media commentary, power shortages in South Africa have had a significant impact on the country, the mining industry, the gold industry and our business. We're working around the clock to adapt our operating plans to the current situation and to understand what the likely scenarios are for us going forward.

  • While the story is still evolving, we are working towards a stable 90% power allocation from the current 430 megawatts, albeit with some fluctuations. We have experienced over the last couple of weeks or certainly in the last four days we've had a much more stable supply and certainly in discussions with Eskom we're seeing significant improvement as we go forward. It is very important for us to achieve that stability in supply so that we can actually bring all the operations to full capacity and that does take time when you're working in a deep gold mine.

  • We've been very focused on the conversations we've had with Government, with every level of the bureaucracy in helping them understand why the deep level gold mining industry is a special case and why we need to work very close to make sure we get the best outcome to protect obviously ourselves, our employees and the industry for the future. And certainly the encouraging thing I see from both Eskom, the Government and the bureaucratic levels is a growing awareness of the importance of sustainable and consistent power to our operations and how important we are to South Africa as a whole.

  • While we agree it is not a time to point fingers, it is a time for all the key players to walk -- to work towards a sustainable and best outcome for all key stakeholders.

  • If we assume a constant 90% power supply we'll have to reduce power consumption by around 10% from a standing start as of January 8. To put this challenge into perspective, since 2004 AngloGold Ashanti's South African operations have delivered energy efficiency improvements, reducing consumption by 17%. And that is a point I'm making very strongly to every regulator and Government official that I come in contact with. This Company has delivered on its commitments to the community, to the bureaucracy and to the Government and we'll continue to make that point very clearly. And we'll also make the point even stronger that we will stand with the Government in its efforts to improve efficiencies and provide an equitable distribution and outcome for the society within South Africa. We're partners in this and we'll take it forward together because together we've already reduced consumption inefficiency within our operations in the last four years by 17%.

  • In fact Robbie and I were talking early in January about our 15% efficiency improvement target that we were looking at over the next five years. So we are scrambling because our five years in fact turned into five days. And so we're scrambling to see what we can bring forward in a super accelerated timetable so as to address Eskom's current constraints.

  • In the meantime, if we are constrained to a reliable and stable 90% supply, we will be looking at a potential 200,000 ounce annual impact rate for AngloGold Ashanti. Fluctuations in supply will further impact the operations, but based on the conversations we're having and are very serious conversations, we're stressing the importance of that stability of supply.

  • Due to the sudden stoppage of all South African operations on January 25, 2008 and following the build up of power to supply to 90% later this week and concurrently with the steady build up production over the period January, production has been adversely impacted by an additional 200,000 ounces into February resulting in a total impact for our South African operation to be around 400,000 ounces for 2008.

  • I must stress that a steady and reliable power supply at 90% is important. We will be affected by around 200,000 ounces annually, but the team is working on all measures they can find to try and improve our efficiencies, to try and mitigate those losses. Again it's important that we work with Eskom. It's important we work with all the regulators to find solutions. And we'll do everything we can to stand with the country, stand with the Government, stand with every individual on finding solutions to the problem we face and we've got to face it together.

  • The final point I would make in the context of our business, 200,000 ounces at an annual rate is around 8% to 10% of our operations within South Africa and for our global operations, around 4% impact.

  • At a 90% scenario, this may result in the likelihood of at least one business unit closing and an additional one running at 50%, together with likely closure of surface stockpile reclaim operations. This rationale has been based on optimizing the current reduced power supply, taking into account long term risks as well as contractual obligations. We have a lot of work to do. We've actually cooperated union representatives and our employees in the search for efficiencies and again every one of us has to work through these issues together.

  • I'd like to turn then to my third area of initial focus, namely underperforming operations with significant turnaround potential. When I first walked through the door I was aware that Obuasi would need to be a key area of focus, firstly to understand the issues that it was facing and then to get the right set of actions in place, along with a team to deliver the recovery. We will outline the scope of the comprehensive asset review that is in process a little later. However, the evaluation of Obuasi has already been undertaken and the key issues for resolution are very clear. While the last quarter's performance was again disappointing compared to potential, the team has been working hard and has now stabilized production delivery from the asset.

  • The current primary mining methods in use at Obuasi are well known. Long-hole open stoping and sublevel caving. Along with the mine layout designs and associated development optimization, there is significant scope for improvement and optimization of the operation. A 2 gram per tonne, or 25% grade differential between geology and extraction delivery indicates we have a design and control gap in our core mining processes. By reducing ore loss and reducing waste dilution, along with optimizing extraction sequences and controls, we should be able to make significant inroads towards delivering grade improvement. While a practical 10% to 15% grade improvement is more realistic given available skills and local circumstance, the prize is still substantial and represents a compelling value proposition existing gold prices, particularly with the associated low marginal costs associated with delivering on this potential.

  • A further constraint that impacts on the ability to realize that potential is mining flexibility which is inhibited due to the low development mining rates, the scattered geography of its mining operations and the poor maintenance performance on critical equipment. We are also looking at high speed development strategies to key areas and focusing on key mining districts to consolidate mining activity to improve efficiencies to reduce costs.

  • In addition to the management team on the ground we have appointed world leading experts to help with the planning process to address these issues, as well as providing support on the development of the recovery plan. Now the people that we've contacted are people that I've personally worked with on the Leinster sublevel cave in Western Australia that people said couldn't work. On the sublevel caves in Inco and within Canada and in other operations around the world including the Cadia sublevel cave with the Newcrest operations.

  • So we're working with the people that have got the experience and expertise in very difficult operations and I would have to say that from a technical point of view we are not dealing with challenges above and beyond any of those operations. It's about people. It's about helping people see what the issues are and then supporting them in developing their skill sets and understanding what areas they need to focus on. And I think with Robbie's leadership, with John Mellor and the rest of the team, I'm sure we'll be successful with Obuasi but it will take some time. And that's what we're working with with the team in a very simple and constructive way, one step at a time. And we will get there.

  • The issue of accountability is central to our new organization structure and the key players in their new roles. And the one point I'd make is where we're supporting teams from external to the organization, or within the regional structure to the sites we are not removing the accountability for performance. And the word accountability is a word that is being heard a lot within our organization. And that's the one we all talk to.

  • The approach we're adopting across the (inaudible) [our review] is to put leaders in the field with our local and regional management teams to support them but not to do their job. And that's our job is to support the players in the field and develop them and help them develop the skills and experience to be successful. And that's our job as leaders.

  • And as leaders we're accountable for everything that happens in the business. There is no such thing as shared accountability. We own everything and we are accountable for everything that happens. So that's why today, in my first quarterly, I'm talking about the things as a team we'll be working on. But that accountability starts and finishes here. And that's the discussion we're in in this new organization.

  • Another obvious area of concern is the Geita operation. While the immediate issues are clear, the wall failure restricting access to the deeper high grade ore, the poor performance of the new mining fleet and the impact of the harder ore in the mill, ore that is being mined out of sequence and the loss of key staff, all these issues, to be blunt, have tended to deal with symptoms, not the driving issue.

  • The restructuring of the operation's leadership has been necessary to put the appropriate capability and experience in the key areas to deal with appropriately these challenges. In the case of Geita, the changes have impacted three levels of management, reduced to two with new leadership under Robbie Lazare, responsible for Africa, and Richard Le Seur, the new GM at Geita. We have moved quickly to put the right leadership in place to focus on the key issues. We are supporting the team with new and more appropriate technical expertise and we are looking to rebuild the operating team after a period of low morale and high turnover.

  • As you know, the performance at Geita this quarter was very disappointing with production down 47% to 58,000 ounces due to an 8% lower tonnage throughput and a 43% lower recovered grade. During November tonnage throughput was adversely affected by discharge pump failures on both mills and a large build up of mill scats due to the treatment of harder banded iron formation from Nyankanga pit. These problems were further exacerbated by the refractive nature of the ore from Geita Hill pit which reduces recoveries and was subsequently replaced with lower grade stockpiled material, further reducing production.

  • There are the details? There are the excuses. The process changed from here going forward. Total cash costs were impacted the Q, $722 an ounce, reflecting the litany of problems experienced. In addition to the cost impact, mineral resources and reserves have been reduced year on year by 2.2m ounces and 2m ounces respectively due to higher costs, changes in estimation methodologies, planning model changes and the flattening of mining slopes.

  • While I'm disappointed, and that's putting it mildly, with the short term implications of the poor operating performance, I am encouraged that the geological resource indicates the extensive presence of gold. The key is to correct the physical performance to address the cost blow out. The current under-performance has had significant implications for 2007 and for the year ahead, in particular our production and cost guidance.

  • Finally on Geita, we have reconstructed the management team and put in place new leadership. The asset review team has identified some key issues. As we rebuild the team we are developing the scope for the recovery works and we are supplementing the local team with additional expertise. We plan to have the broad work scoped by the end of March with detailed execution plans completed and in process by the end of June. In the meantime, we are supporting the new leadership with regional staff to help the recovery of the immediate issues. And by that, Robbie already has a team on the ground working on the key issues. He's already been talking to people again this morning about some of the rectification programs and things that we're already doing to sort the issues out.

  • I've been in the industry for 31 years and I've worked 12 years in coal with Rio Tinto working in some of the deepest and most difficult coal mines in the world. And in fact, in Australia, the deepest coal mine was in fact the highest productivity operation. I've worked in Kalgoorlie five years in gold, was the General Manager in charge of the development of the Super Pit and the rationalization of Kalgoorlie. I led Western Mining's nickel operations for four years through the major restructuring and they trebling of productivity over four years. I led the Normandy business and was the Chief Operating Officer for the Normandy business before actually AngloGold became a bidder for the asset, ultimately losing out to Newmont. I've actually been part of the team that reconstructed Inco's operations over the last five years and you've seen a 40% increase in productivity.

  • Geita will be fixed. It will take some time and Robbie and the team will need some support. But we've got the right people in the right places and we will fix the operation. It's not rocket science. It's about accountability. It's about leadership and making sure we focus on the right issues and we support the people in the field. And that's where we're going and we will get there.

  • 2008 will be a period of transition for us at Geita. It's necessary to take us through those issues and those changes and that's where we're going. And Robbie and the team have already started the process and we will get there. We will again report back in March and we will continue to report back our progress every quarter. And I expect you to hold us to account in terms of our delivery against those promises.

  • Moving away from operational issues and focusing on the hedge book. It is well known that I'm not a great fan of hedging, particularly in a rising gold price market. In the current gold price environment our received price continues to diverge in percentage terms from the spot price. At current gold price levels we anticipate that our received price will be in the range 18% to 20% below spot. However Mark Lynam and the team continue to manage our positions and have reduced our net exposure by around 200,000 ounces quarter on quarter to 10.4m ounces. Deliveries into contracts drove the reduction although the positive impact was dampened by an increase in the hedge delta, largely driven by the increasing gold price which increased by $92 an ounce over the quarter.

  • Over the last 12 months our hedge commitment has reduced by 300,000 ounces in an environment that saw the gold price rise 31%. At current gold spot prices and where we're delivering our existing positions, as planned, we will reduce the hedge delta by more than 2,000 --- 2m ounces in 2008.

  • Even more important than the absolute reduction in hedge delta is the percentage of reserves the hedge book represents. At the end of 2007 the hedge book represents 15% of reserves and only 5% of resources. The reduction in these ratios in 2007 has been material thanks to the significant ounces that we've added to both reserves and resources. And to the team, I add my congratulations. It's been a tough conversation and there's been some real highlights in what's happened in the last quarter. And certainly from a resources and reserves point of view, a real foundation is being built for the future of AngloGold Ashanti.

  • We would clearly prefer to increase our exposure to the spot gold price and we remain confident in the outlook for the price of gold. We will therefore continue to look at all ways in which we can effectively manage this exposure to improve our stakeholders' exposure to gold while at the same time managing solutions consistent with protecting shareholder value.

  • Now let me turn to 2008. We are and I am developing a good sense of the asset base and our future potential. In going forward, we are more focused on the strategy necessary to fully realize that potential. The good news is that we are fully aware of the key issues that were impacting performance and we are well progressed in building action plans to address them. We are very optimistic about the long term outlook, but there is a lot of work to do. Our opportunity pipeline is extremely robust with a number of positive developments coming into focus in the last few months which we will outline later.

  • In particular, the impact of power in South Africa will need to be managed as the story unfolds. We have taken a prudent approach to forecasting in this period of uncertainty. And while making sure we have the operating plans to ensure we optimize production and cost performance on an ongoing basis depending on power availability. We will continue to work on our contingency and mitigation plans in case we see further system weaknesses and again to mitigate against the strategy we already have in place.

  • Taking into account those risks, as I said, we are expecting the production in South Africa will reduce by around 400,000 ounces compared to our original plan for 2008. We have assumed the current stoppages will impact a net 200,000 ounces with a risk in the order of an additional 200,000 ounces on an ongoing basis as we described earlier.

  • While there may be some upside in these numbers, we are concerned we do not have as clear a picture as we need from Eskom, in particular to forecast with more confidence. The situation will also lead to a negative impact on costs. Therefore, taking into account the uncertain impact of Eskom power supply, together with Geita's near term under-performance, overall we anticipate annual production to be in the region of 4.8m to 5m ounces for the year with cash costs to be between 425 to $435 an ounce. This is based on an assumption of 90% power availability in South Africa and the January incident impact.

  • AngloGold Ashanti is navigating a crossroads in its history as it builds investment in exploration, new developments and brownfields projects. As a consequence, it is a period of substantial investment in our business and therefore we anticipate aggregate capital expenditure for 2008 to be in the region of $1.2b.

  • Despite the short term pressures on our business in our capital funding requirements, we remain robust on the long term outlook. Therefore we will keep the dividend at a similar par level to headline earnings as at the mid year. We are declaring a dividend of ZAR0.53 per share, $0.07 per share for the six months ended December 31 '07, bringing total dividend payment for the year to ZAR1.43 per share and $0.20 per share.

  • While we will maintain a close watch on the South African power situation, we will review our funding requirements as part of our ongoing strategic review and so we will keep our dividend policy under ongoing review.

  • In turning to the strategic discussion, the strategic plan is very clear. The focus of the strategic plan is very clear. Maximization of value. First, with the leadership team, we have defined value in the context of our management team and we have declared that value, or the definition of value in three parts. We will be a business generating cash and cash flow. We will focus on strategies driving growth, meaning more cash and cash flow underwritten by competitive returns on capital employed. Consistent with delivering on commitments so our shareholders know and understand our strategies and are willing to reward us for innovative and lateral pathways to delivering more cash and cash flow. And while I've set out some of the pathways to that growth in my conversation today, in our next quarterly report we will provide a more detailed and fulsome discussion on all the elements of our strategy.

  • We believe we have a number of key elements in play to drive value. Let me provide a brief update of where we are in that process and what we see as the next steps. The first priority is to ensure that we have the right management team in place with the right structure around that team, to ensure that every member of the team has a well defined role and clear about accountability. Accountability is not just a word and will not be just a word to the team.

  • Second, we want to ensure that we have the right assets in our portfolio and that there is a well considered operating and financial plan for all our assets. In order to do that, we have put an asset review in process. We will review -- we will outline the scope of the review, current status and next steps. Across the portfolio we need to ensure that we have a coordinated and coherent growth strategy built on a multi-platform foundation that gives us a range of pathways to value. And built on a proper understanding of what the assets can deliver. And again in the first four months that's been the key focus of the team and myself in understanding what we've got and how we build that future for the business.

  • Finally, we have to ensure that we've established the financial structure and the cash generating capability to maintain and build the potential of our asset and prospective portfolio.

  • You will already have seen that the changes I've made to the leadership structure with the implementation of a regional structure with Robbie Lazare heading Africa, Ron Largent leading the Americas and Graham Elm in Australia. I've also mentioned earlier the changes to the management team at Geita, reinforced with a direct reporting line to Robbie. The emphasis here is to remove non-value adding layers of management, bringing the operational reporting closer to the CEO and to ensure that there's a renewed focus on delivery of commitments on safety, productivity and business efficiencies. As CEO it is my accountability to have the right structure, the right people focused on the right work to deliver results.

  • Consistent with this personal accountability I have already had one-on-one interactions with more than 50 of the top managers in the Company. As part of that process we have agreed to part with 20% of the Managers impacted. This does not point to a weakness or failure in all cases. However, it does indicate the degree of focus we have on building a new culture focused on delivery on commitments. A full accountability for everything that occurs in the business.

  • That leaves us with a very high quality core team, all of whom will have clear scope and accountability in their role. We have extended the ethos across the business and our Johannesburg quarters have now been reduced by 60 people with 30 people in the process of relocating to our regional hubs in [Pozagroove] for the South African division and Akra for the West African division. We will continue to reassess the structure as our strategic planning evolves, but I will say that I think we are building a very high quality team to manage the challenges and develop to our full potential. And there will be no confusion as to what accountability means.

  • When I came through the door, one of the processes that I wanted to inaugurate was a work branch and leaf re-evaluation of every asset in the portfolio in order to define the value potential in all of our assets. In each case we are assessing where we are on the value journey and defining what actions are required to get us on the value pathway as quick as possible. The conclusions and recommendations from that review are now in the process of being finalized and for each asset. There will be an overall recommendation as to whether the asset should be sold, fixed or further optimized. No asset will remain untouched in the review in terms of actions going forward. However, I think it is important to point out that the philosophy is to constantly reassess the issues facing each asset and the business overall and to maintain flexibility to redeploy capital to where it will ultimately drive the most value to shareholders.

  • Once the initial process is complete we will at least have a baseline expectation on value and potential for each asset that can help inform those judgments as to where capital will be most effectively deployed. This is of course not a one-off exercise as this approach is a philosophy that will underpin an ongoing assessment of how to maximize value in the business and how best to renew the portfolio to deliver long term sustainable results.

  • As the asset review process has not been concluded because we've asked a number of the questions regarding some of the outputs that have come from the first phase of the review, I don't want to jump the gun by making premature judgments. However, I will say that what I've seen so far is very promising, particularly in sites around the gap between our greenfields and brownfields exploration programs. The potential to increase production intensity around a number of the operating assets and the opportunity to make favorable gains on process recoveries and cost efficiencies is material.

  • I've quite often talked to the reasons I joined AngloGold Ashanti. The quality of the reserve base, the core assets in the exploration portfolio arguably represent the most attractive potential in the industry. Beyond that there is value in the business that hadn't been appreciated prior to the review. [Those sites] include the iron ore deposits in Brazil, uranium tailings potential in South Africa and unrealized exploration potential at Siguiri and a number of other operations.

  • Some of the fix and optimize recommendations you've already heard in assessments of where we are with Obuasi and Geita. Some of the recommendations around rationalization of the portfolio have also come to light with our decision to consolidate the ownership of Iduapriem and through the proposed acquisition of Golden Cycle, our joint venture partner at CC&V. The pending sale of royalties to Royal Gold is another example of hidden value. Meanwhile, we have started a process to consider the disposal of our interest in Morila in Mali and we are also going to start a process in connection with our other assets in Mali, being Sadiola and Yatela where the current focus is on identifying the full upside potential of these assets with a view to then going to the market.

  • As I have said, I will go into more detail in an update around the time of our next results. In that strategy update we will also set out our growth plans.

  • To wrap my contribution I would like to take you through an outline of a few highlights, our revised reserve and resource statements which illustrate our great potential which will now provide an important foundation for the finalization of our strategy work in March.

  • I'm pleased to announce that during 2007 we've added some 34m ounces of resources which after depletion stand at almost 207.6m ounces, up 18%. Significant additions include 6.9m ounces from greenfields activities which were delineated by AngloGold Ashanti's greenfield exploration team at three key prospects, namely Tropicana in Western Australia, Mongbwalu in DRC and Gramalote in Colombia. And we will continue to update the greenfields exploration results during the course of the year because not all drill programs coincide with the calendar year end and associated reporting.

  • Significant other additions include 17.1m ounces at Mponeng as a result of improved economics and revisions to the estimates of methodology. And 4.7m ounces at Cripple Creek and Victor.

  • Looking at reserves, our 2007 mineral reserves have increased this year by 9% to 73.1m [sic. see presentation] ounces net of depletion. And when you do have a gold price at $900 an ounce and you want to look at the balance sheet between the hedge book and our reserve inventory, remembering that the hedge book represents 15% of our reserve base, then certainly there has been tremendous work on the reserve side of the equation. And I think that is a key to how we manage the process going forward and manage the assets going forward.

  • Significant assets include 3.8m ounces at Moab Khotsong with the inclusion of Project Zaaiplats, an area adjacent to the operational axis due to (inaudible) blocks to the southwest of the current mine. And 3.4m ounces were added in Mponeng due to the inclusion of the Carbon Leader rig project below 120. Certainly, that won't be the end of the story in those areas as we have mineralization adjacent to these areas.

  • We're also delighted to report today uranium reserves have increased by 65% from 17m pounds to 43m pounds for the year, making its contribution to the future of AngloGold Ashanti significant. In addition, both silver and copper reserves have increased year on year and total by-product contribution is expected to benefit cash costs significantly in the future.

  • In terms of brownfields development, the five key areas with news this year are Boddington, our joint venture in Australia. At the end of the year the Boddington expansion project reached 62% completion, achieving 4m man hours without a lost injury time -- lost time injury. The design and procurement are almost complete. Civil and concrete works have been completed and steel erection has commenced. Owner mining has commenced using two of the three large rope shovels, major equipment including Ball Mill secondary crushers and high pressure grinding rolls are being delivered to site and the operating team is currently being established. Start up remains scheduled for late 2008 striving into 2009.

  • The review of the project estimate has been completed and the capital estimate of the project has been increased. At a 33% attributable level, the capital estimate has been increased to AUD770m to AUD900m, up from the original AUD600m to AUD670m. These are Australian dollars. The adverse movement in the estimate is largely due to the flow on effects of the recent commodity boom that has resulted in labor rates and other input costs increasing by over 40% while commodity related products have soared affecting other parts of the cost estimate. We have also seen fuel costs double since the estimate was completed.

  • A further challenge was encountered, impacting scheduling costs with the purchase of offshore design and engineering. This has resulted in a slippage in the delivery of key elements which has then squeezed us on the critical path and impacted purchases of key items on the critical path resulting in further increases in costs.

  • On the positive side, the large plant design experience was brought to the project and the design has been optimized, reinforcing our confidence in the project achieving its design target. And for those that are aware, I've been through about six major projects of this size and scale and certainly I've been very impressed with what I've seen on the ground and seen the mills being constructed. And certainly the guys are doing a very good job and I expect the project to be a real success for both the partners Newmont and AngloGold Ashanti.

  • Whilst there has been approximately a 30% increase in the estimate, we are pleased to announce that the attributable resources of Boddington has increased by 2.1m ounces to 10.3m ounces from the original estimate. Attributable reserves are increased by 1.7 to 5.5m ounces increasing the life of the operation by an additional full year to over 20 years in total. Combined with a stronger gold price, the value attributable to the project is significantly increased.

  • Mponeng, our South African flagship operation that has had a long life, but it continues to provide further potential for growth. The Mponeng Carbon Leader project below 120 level has great potential to add 3.4m ounces. These ounces are anticipated to be mined through the tertiary shaft that will extend to a depth of 4,500 meters and first gold production is expected in 2015. The project is expected to extend the life of the project by 14 years and we will seek Board approval as part of a stage development strategy later this year.

  • At Moab, Project Zaaiplats has the potential to add 3.8m ounces by establishing double decline for access to deeper (inaudible) blocks to the south west of the current mine and extend the depth levels to 4,000 meters. We will likely approach our Board in October this year for again a staged project development approach with first gold targeted in 2015 and mine life extension potential beyond 14 years.

  • This will make Mponeng and Moab the longest life assets and investments involved with the region respectively and these projects are not expected to be constrained by power shortage given that the energy requirements will be shifted well after Eskom has resolved the current power shortages and in our case these power -- the power required to fuel these projects are power substitution projects that don't represent major lifts of additional power coming onto the grid.

  • Obuasi continues to provide upside and additional exploration in mineral resource mining has brought an additional 4m ounces into resources. The Obuasi ore body continues to look attractive and will continue to grow depth as further drilling is completed. This will obviously increase the life of the operation and its associated value which of course we intend to leverage off improved operating performance.

  • Cripple Creek and Victor has increased by 1m ounce of reserves and 4.7m ounces of resources with improved economics and exploration with the potential life for extension.

  • Looking at our greenfields projects, we refined our exploration programs over the last three years that we are now focused and we are delivering more potential than at any other time in the Company's history.

  • For 2007 we committed to deliver 6m ounces of inferred resources, a discovery cost of $15 an ounce. We are delighted to announce that we have delivered on this commitment with 9.1m ounces at 100% and 6.95m ounces at an attributable level and even more importantly, at a discovery cost of less than $15 an ounce. These ounces were delineated by the AngloGold Ashanti greenfields exploration team at three key prospects globally, namely Tropicana in Australia, Gramalote in Colombia and Mongbwalu in DRC. This will be an important focus in our strategy update next quarter but let me highlight threes areas with significant news in the resource update today and we hope more to come.

  • Looking at Tropicana, we're looking at 62.8m tons at a grade of 2g containing 4m ounces with AngloGold's attributable resource 2.8m ounces. The pre-feasibility is currently underway and is on track for completion in 2008. We will focus on the economics of the open pit mining of gold mineralization while we look at the ability to extend mineralization zones to make sure we get the scale and scope of the operation right for the potential development.

  • Our second resource generation planning comes from the DRC where we have 10,000 square kilometers of concession of which over 2,100 square kilometers of airborne surveys have been completed. At the deposit we've defined an initial open pittable inferred resource of 33m tons at a grade of 2.68g per ton for around 2.93m ounces of which 2.5 is attributable to AngloGold Ashanti. These results were based on data from 88,000 meters of diamond drilling and RC drilling that have been completed over a period of two and a half years.

  • Looking now to Colombia and people know that I'm actually very excited regarding our prospects in Colombia where we have first mover advantage staking rights to 10m hectares of exploration area where we have reduced this to 3m hectares following conceptual analysis. This is to ensure we focus on key targets. We continue to work with our JV partners on exploration projects. Resource drilling continues at our 100% owned La Colosa project and to date 12,000 meters have been drilled from 42 holes.

  • Additional drilling and conceptual studies are underway and the results are expected during the first quarter of 2008. At Gramalote we completed a conceptual economic study on the bulk tonnage prospect and have declared an inferred resource on a 100% basis of 57.8m tons at a grade of 1.14 grams per ton, around 2.12m ounces. This inferred resource was calculated using SA data derived from over 13 meters of diamond drilling from 43 holes and included open pit audit sampling.

  • Ownership of the Gramalote project is currently 75% AngloGold Ashanti and 25% B2B Corporation. However a non-binding memorandum has been signed with B2B in which they have the option to earn into 51% of the project in return for taking the project to feasibility.

  • On those positive notes and I'm passing across to Venkat. We'll let Venkat pick up the financial story. Thanks Venkat.

  • S. Venkatakrishnan - CFO

  • Thank you, Mark. I would like to cover four aspects in my presentation, namely unpacking the reason for the increase in units cash cost quarter on quarter. I'll walk you through the area and the accounting adjustments which we flagged at the end of the third quarter and its impact on adjusted headline earnings. So all the achievements we achieved this year from Group supply chain activities and cost saving initiatives and provide you with some guidance on amortization charges and exploration spend planned for 2008.

  • Turning to unit cash costs, the increase quarter on quarter from $357 an ounce to $404 an ounce can be explained as follows. If you think about the first two items which we applied at the time of the third quarter's result, impact of uranium purchase during the fourth quarter was $16 an ounce, and impact of stronger currencies was $11 an ounce. Impact of lower volume and grades primarily in South Africa and Geita added $15 an ounce at a Group level for the quarter. And lastly, inflation, higher royalties and inventory movements accounted for $5 an ounce.

  • You will recall that when we presented our third quarter's results in October of last year we noted that our fourth quarter's earnings would be significantly distorted due to accounting adjustments, including tax provisions, rehabilitation and inventory adjustments. During the quarter, these charges totaled $64m and can be broken down into three parts. So obviously, in respect of resetting the rehabilitation liabilities, primarily at Obuasi and certain other mines came to $25m.

  • Provision in respect of direct and indirect taxes in Mali, Tanzania and Brazil amounted to $31m. Increased amortization and redundancies in respect of Obuasi added some $8m. The impact of the above adjustments, which totaled $64m, has resulted in our adjusted headline earnings reducing from $81m recorded in the third quarter to $18m in the fourth quarter.

  • Turning now to cost saving reshapers, the Company has had a solid track record with regard to cost management and once again delivered savings to the value of $58m in cost avoidance and cost reduction to partially mitigate inflationary increases. This brings the total sustainable savings for the last three years to $291m. It has been achieved through various interventions, including efficiency targeting, procurement interventions and restructuring initiatives. The South African region has led the process again contributing $31m of the $58m savings for 2007.

  • With the change management structure, framework and accountability and processes in Africa, we will be rolling out the successful initiatives from South Africa and rest of Africa under the leadership of Robbie Lazare, working closely with our global supply chain team based in Johannesburg.

  • Our efforts for 2008, which are aimed at generating at least a similar amount of savings this year, will continue to focus on business improvement and efficiencies under Peter Rowe, restructuring activities and procurement activities, which will target three key areas, mainly low cost country sourcing. Secondly, capital spend rationalization. And thirdly, rolling out South African procurement savings model into the rest of Africa in areas particularly] [increase and field management.

  • Looking ahead for 2008, we estimate that our depreciation and amortization charge for the year will be around $600m to $610m and expense exploration will be around $114m.

  • Before handing over to Robbie, I just wish to point out an error in our quarterly release on page 10, wherein we have given guidance in terms of discount as compared to spot being 18% to 20% going forward for '08 on a price range of $700 to $900 an ounce. That is incorrect. The price range is on a $900 spot price. The $700 reference was incorrect. It also takes into account the lower production base and 2.2m ounces of scheduled maturities being delivered to -- in 2008.

  • On this note I'll pass you across to Robbie to take you through the African assets portfolio in more detail.

  • Robbie Lazare - EVP Africa

  • Thank you, Venkat. Ladies and gentlemen, before I start on the operational issues for the quarter, I would like to [undertake] some of the steps that we have taken on the electricity business in South African operations. A slight performance on cost savings -- that's been quite comprehensive as we have mentioned and in ensuring that all our input costs are optimized and that any opportunities capitalized, energy costs, that has always been an area of focus within South Africa. And we have [commented on this] over quite a number of years.

  • We have made a track record in South Africa of (technical difficulty) and realizing benefits for both parties guaranteeing our electricity consumption, as Mark has said, (technical difficulty) years. Our energy management strategy largely encompasses two areas and indeed the mine site management and the energy conservation (technical difficulty). On the demand side management (technical difficulty) our South African operations the peak demand goes up to about 500 megawatts while an average is about 450.

  • Saving projects which we have implemented includes optimizing our pumping schedules, equipping our domestic hot water cylinders in our furnaces with radio controlled switches, ice storage facilities, which we did at [Mponeng] quite successfully so that on the high usage time we don't actually generate ice but we actually flow the water over our ice plant areas so that we can cool down our mines. And then rock hoisting schedules as well.

  • Right before the critical power outage which stopped all of our mines, we agreed with Eskom to reduce our power consumption by 40% during the (inaudible) daily time span. As you would know, that is when the actual high peak demand in South Africa happens and everyone goes home and starts cooking and putting on heaters. So we actually committed to a 40% savings during that time period because the mines is actually in a low period. All the basic people are out to actually going into [drafting time] during that period so there's not a big number of people running that.

  • And this one is just managing the peak demands across South Africa, particularly as it relates to domestic use. The second approach, which is the energy conservation and efficiencies has been largely targeted to applying appropriate technology. At present, we are currently replacing some dewatering pumps at Moab mine with a superior system that works with principal of a U tube water to remove water from underground and in the process, actually uses far less electricity. This is expected to reduce Moab's electricity consumption by at least 3.5 megawatts and will be completed in the first week of March of this year. And this is a cofunded project with Eskom. It's ZAR54m. Eskom actually pays half of it and we pay the other half of it.

  • Other projects in progress include compressed air utilization, cyclic control of space heating in winter months. We mentioned (technical difficulty) savings. We are proud of our industry savings that we have realized to date. And I would like to recognize all my colleagues in South Africa operations who have made this possible.

  • As Mark has said, a 10% reduction in energy consumption in South African operations will result in a loss of annual production of 200,000 ounces. But for 2008, will impact by 400,000 ounces following across the board stoppage and then the startup. And as you know, starting up a deep level mine is not just flicking a switch and everything is back to normal again. We are still, after the stoppage of last week, in the process of building up our production in our (regional) operations.

  • The South African, under the leadership of (Robbie Lazare) who runs now the Southern Africa region Vice President and I'm hoping that he's going to turn all of the South African operations around to the extent that he turned [Mponeng] around over the last few years.

  • We are currently looking at all avenues to improve energy efficiencies with the constraints that we now face. This will allow us to optimize our production schedule. Timing is a major issue and we are in discussions with the unions to assist us in this process. Workshops with the unions and with the rest of the workforce are being held to identify opportunities, big and small. And we have set up this process now [with our discussion] to generate IPS is taking place.

  • What we need from Eskom is to ensure that we get at least a minimum of 90% power per system. As you can see from the 2008 (technical difficulty) 10% reduction in power leads to 18% reduction in gold. And power levels below 90% will rapidly double the potential gold loss. So it's quite important that Eskom commits itself to 90% or more.

  • Lastly, we are serious in our attempts to avoid retrenchments. Everybody is talking about retrenchments in mines and Mark's spoke a bit about it just now as well in terms of 1.5 mines. That would be the last resort. What we need to do is to find ways of actually saving the energy to continue operating our mines. The objective is to get our 10% through energy savings and innovative means. This is where our focus is right now. I can also give you assurance that all our mines in South Africa have backup power systems that will enable us to hoist up people in emergency situations.

  • Let me now turn to the operational performance for the fourth quarter. Starting with the South African assets, Moab Khotsong, our new deep level operations with a good growth potential, continuing with our ramp up on this asset with a volume peak that's up 14% and the value of the mine increasing 3% with gold production 39% higher at 736 kilograms. Total cash costs were marginally lower at ZAR150,000 a kilogram.

  • Gold production from Great Noligwa was lower by 2% as a result of lower yield. It was a 10% drop. And safety interventions that undertaken. And this safety intervention actually goes through to all of our operations. And of course the ones I focused on in South Africa as well.

  • Following the purchase of uranium to meet our obligations, Mark mentioned the 300,000 pounds. The total cash cost increased by 31% (inaudible). Excluding the purchase of uranium, the total cash cost Rand per kilogram would have been marginally lower (technical difficulty).

  • Following geological structures changes at Kopanag, the yield reduced by 5% and the volume reduced due to the safety. Gold production was reduced by 11% to 3,229 kilograms. Improved efficiencies assisted in partially offsetting the impact of the 11% lower production. The total cash cost only increased by 3% to ZAR71,500 a kilogram and costs when we've adjusted -- indeed the adjusted cost it was 3% lower.

  • Tau Lekoa was also unfavorably affected by fatal accidents due to an accident in the fourth quarter. And combined with the safety intervention and the strike, the rate was down by 4%. Sorry, the volume was down by 7% and 13%, respectively. Gold produced reduced by 7% and total cash cost reduced by only 3% as they managed their costs reasonably well.

  • Following five lost shifts at Mponeng when they had the multiple fatality accident at Mponeng in the fourth quarter, gold production was down 12%. Total cash cost increase was 14%.

  • Savuka mine, which has shown a nice stable performance over the last year saw a yield improvement. But we saw a grade dilution from lower levels of development, improved safety and this was offset by even bigger safety interventions, as I've mentioned before, saw a 13% lower gold production.

  • Various cost interventions resulted in total cash costs reducing marginally against the previous quarter, while adjusted profit increased almost twofold, ZAR29m amortization charge adjustment in (inaudible).

  • TauTona, the increased geological risk from seismic activity required re-planning. And as you know, this is the third re-planning cycle that we have gone through for TauTona surrounding the shaft pulling area, which we are doing for safety reasons. This resulted also in mine stoppages from accidents in the fourth quarter reduced volume and yield and gold production was 18% lower. Thus total cash costs increased by 7%.

  • At Navachab mine, gold production decreased by 5% due to a planned lower feed grade and total cash costs were 22% higher, $527 per ounce, due to a weaker U.S. dollar and higher feed costs.

  • On the back of this, the gold price was adjusted (inaudible) and there was an increase by 50%, $3m.

  • Turning to the operations in the rest of Africa, starting with Obuasi and as Mark has said, Obuasi was on par with the previous quarter which was disappointing. With the plant shutdown and this quarter's power outages at both of our operations Iduapriem and the Obuasi mine over the fourth quarter were affected by some of the power outages.

  • We have effected some of the restructuring in operations, which in the last quarter we've seen a further reduction of about 200 employees, reducing the total cash cost by 5% to $429 per ounce. If you look at what has happened over the last two years at Obuasi mine, in terms of the restructuring and right- sizing of the operations in terms of its people to it's production profile, we have now taken out about a -- sorry, 1,500 positions and associated people out of that operation.

  • At Iduapriem, also in Ghana, power shortages resulted in 60% -- 16% lower tonnage. And consequently, gold production declined 13% and total cash costs increased 15%.

  • As mentioned previously, regarding the ongoing power shortage in Ghana, the Chamber of Mines of Ghana has established a consortium representing the four major gold mining companies operating in Ghana. This consortium, working with the VRA is in the process of installing a 80 megawatt power generation unit which will feed into the national power network and will be for the use of the mining industry. To date, AngloGold Ashanti has contributed $5m (technical difficulty) and generated between 40 and 50 megawatts of power and we will ramp up that this quarter to the promised 80 megawatt of power.

  • It's also encouraging to note that the power outages have reduced following good interaction with the VRA and the installation of the generation unit. I had a meeting with the CEO of the power distribution network end of last year in Ghana and we can already see the difference in terms of what happened in the last quarter and with this quarter -- and in this quarter to date this year in terms of far less interruptions of power.

  • Siguiri in Guinea had a solid production performance, posting a 30% improvement to 83,000 ounces after 36% improvements in grade and 9% higher (inaudible). Total cash costs subsequently fell to 15 -- about 15% to $439 per ounce. And for 2007 we achieved a record annual production and we will continue to target further growth as discussed earlier as ways of (technical difficulty).

  • The MD of Siguiri Christian Rampa Luhembwe who used to work in South Africa also before has now been appointed as the Vice President of the West Africa region province and he can continue with the good work in West Africa that he's done at Siguiri mine.

  • The Malian assets had a mixed quarter with production steady at Morila with 52,000 ounces and total cash costs of -- were 15% higher, while at Yatela, production decreased 27%, due the release of low grade ore that was stacked in the previous quarter.

  • Production was 14% higher at Sadiola, 40,000 ounces as both grade and tonnage thanks to throughput improved. And the adjusted gross profit increased 17% to $7m.

  • You also have seen from Randgold's results earlier this week that we are in the process of handing over operatorship to Morila -- at Morila to Randgold which we are also in discussion on the potential sale of this asset.

  • That concludes the Africa operation and I'll hand over to Mark for (technical difficulty).

  • Mark Cutifani - CEO

  • Thanks, Robbie. We -- I'll just say a few words and wrap pretty quickly. Before I actually make some wrap comments, I'd like to acknowledge both Robbie and [Johan Villien]. I was involved in the Safety is our First Value launch on November 8. And what really did impress me was the rapport they have with every employee in the Group and the conviction that I think 800 people demonstrated on that day.

  • And what was encouraging is when we talked about safety, everybody was in the same conversation about making the business a better business and that fits with productivity in every other part of the business. So I think the leadership that the two of them have demonstrated, and certainly have really impressed me has been, for me, an insight into the potential that we have here in South Africa. And certainly, from my point of view, I've learned a lot.

  • I started on September 17. The honeymoon was over about October 3. We've had some issues to deal with, but I think we've come through some of those tough ones pretty well. And I think already we've seen some indications of improvement that I think are very important and very significant. They also probably taught me a few words in Afrikaans that I've been told I can't use publicly. It's part of that education.

  • But certainly, I've been impressed with the work they've done. And in fact, they'd started a lot of the safety work before I arrived. So I would give them credit for doing some really outstanding work. And we're all obviously hopeful that that will deliver. And again, that will provide a great base, I think, for the business going forward. And whilst in our industry we'll be thrown up with some challenges from time to time, I think we've got the team to take those challenges on and move forward.

  • So just a couple of comments to wrap. Firstly, as I said, safety is our number one value. I don't think I have to say anything more than that. Accountability and delivery on commitments is an imperative. It is a belief and that is the way business will be carried out with AngloGold Ashanti. And every conversation will be about accountability.

  • We have some challenges and we know what we have to do. We're setting the pathway and we're getting on with the job. We have the resources, we have the assets and we have the people and we're absolutely focused on delivering on our commitments. That's where we're going. In our next quarterly report, we'll -- we will talk more expansively about our strategy and our strategy for growth.

  • As I said, we can see the challenges. We've put them on the table today. We'll take them forward. We'll get on top of them and we'll take the business forward in a very positive and constructive way. And over the next 12 months I believe that with the team we have, we'll demonstrate how we'll deliver value and we'll deliver on those commitments and bring everyone within the business along in terms of where we're going. Thank you.

  • Unidentified Company Representative

  • Thank you, Mark. I'm mindful we're running late. We will take questions and we do have participants on the webcast. So I think we can run about another 10 minutes and then the management team will be here informally as we close off the formal proceedings.

  • Please wait for a mike and introduce yourself. Thank you. Steve.

  • Steven Shepherd - Analyst

  • Steve Shepherd from JP Morgan. (Technical difficulty). I have two questions. First one (technical difficulty).

  • Second question revolves around power. (technical difficulty). First of all have you considered using electric rock drills, which are obviously a hell of a lot more efficient than using (technical difficulty) drills. Second question. (Technical difficulty) generator. You get another 200,000 ounces. That's marginal cost. Could you give us your thoughts on that? So just those two questions. Thanks.

  • Unidentified Company Representative

  • In South Africa we have two focused year to date. One was a (technical difficulty).

  • Your second question in terms of the power (technical difficulty).

  • Unidentified Audience Member

  • (Inaudible question).

  • Unidentified Company Representative

  • In terms of electric drill bits we are actually the front runners in South Africa in terms of electric drill bits. TauTona is now 70% or 80% of their drilling machines is actually and we're in the process of rolling this out. The intent was to roll it out into new areas that we're opening up. But we are in the process of doing that and saying, where can we actually save on electricity if we can successfully roll out drill bits. So we are busy looking at those opportunities.

  • Many opportunities that we are looking as well. We are also looking at the most efficient [compressors] and actually allocating them at the right period so that we can save electricity there as well.

  • Self generation is extremely difficult. We've been warned by (inaudible) don't go into self-generation. If it is one pipeline of fuel coming from the urban site to Johannesburg. People now start doing self generation. The next crisis that will impact the State will be an absolute focusing of fuel in South Africa and specifically in the west, in the [Harping] -- in the [Harping] area.

  • So we have got our emergency power generators. We can generate about 60 megawatts of power through hose generators, but it is emergency power generators. You cannot continually run those generators. It's not a good thing for us to run these. And of course, generating your own power costs about three, five and eight times more per unit than what the South African cost is. As you know, power in South Africa is the cheapest in the world.

  • Mark Cutifani - CEO

  • To that I'd just add there Steve that we've suggested to Eskom some ideas on these sorts of things. And a few of us have been involved in the gas ring fencing system that was set up in WA and some of the systems up in Canada, as well. But as Robbie said, there are some barriers to those sorts of things. But we'll continue to explore possibilities in how we might wield power between user groups and all those sorts of things.

  • So it's quite an expansive conversation. But as Robbie said, in those conversations the issues are highlighted. And we said, okay. But let's see if we can find solutions to some of those issues. So we're very involved in those sort of conversations.

  • Unidentified Audience Member

  • (Inaudible) from JP Morgan. Briefly, could you elaborate on the iron ore deposits that you mentioned in Brazil? And then just some detailed guidance on Obuasi. You talk about the grade. Just what you're expecting, Robbie, in terms of tons, grade and costs from [Areja] Obuasi.

  • Mark Cutifani - CEO

  • I might ask Richard and Eric if they just want to take a minute or so to talk about the [Mabatar] and [Habatar] deposits in Brazil.

  • Richard Duffy - EVP Business Development

  • I'll start with that (inaudible). The fact that we have these deposits around our existing gold operations we think that they could potentially be quite significant but we don't (inaudible). Our first step is to (technical difficulty), put a couple of holes in it and to have a look at the quality and (technical difficulty). By the end of the next quarter, we'll have an update for you but it's really flagging the potential. But there's quite a bit of work to be done. And Eric wants to talk geology.

  • Mark Cutifani - CEO

  • I might just add to that the reason we flagged that today is proof that we'll be aware that we'll be doing some things and we'll be talking with a few people. And what we didn't want people to think is that we were thinking about starting an iron ore mine or that sort of thing. It's more about understanding what we've got on the property and how we can monetize that potential value on those properties. And having worked and been responsible for operations in Brazil, my ears pricked up straight away when somebody said iron ore and militia rights. And so -- but that was already identified by Roberto and a few of the guys and Eric and their team. So it's certainly worth a hard look.

  • Second issue, Robbie. Do you want to have a quick chat on that?

  • Robbie Lazare - EVP Africa

  • Yes. The Obuasi mine, we are looking at a guidance of capacity of about 390,000 ounces coming from Obuasi. The grades that we plan for Obuasi is about [14] grams per tonne. Now that does not take into account Mark's [2 grams] a tonne. That's (technical difficulty). Our actual plan is to work on those few grams per tonne. We will, we should see an increase on -- of 10% by year end of (technical difficulty) which is 4.8, 4.9m tonnes (investment). This is consistent with what we have given you over the last year.

  • Unidentified Company Representative

  • Are there any other questions?

  • Unidentified Audience Member

  • (Technical difficulty). We told last year that [technical audible]

  • S. Venkatakrishnan - CFO

  • (Inaudible) all of our operations. If we are unsuccessful in doing that and achieving the 10%, then [technical difficulty] operations. I personally would not like to (technical difficulty) at this time. It could actually open up more questions. We could actually say that potentially stop selling but they keep on developing as we have more (technical difficulty). That's one of the options (technical difficulty). The other one in terms of (inaudible), you can't just take a short term decision. But a longer term decision (technical difficulty), so you have to take that into account and make a decision. At the moment we are planning for (inaudible).

  • Mark Cutifani - CEO

  • On the day-to-day both Robbie and I are coming up the curve and Robbie's further up the curve. We would make a couple of observations. Firstly, the first thing I learned with Geita is that when we took over the asset, there were some issues we found with the geological model. And that the statistical processes used appeared to over estimate some of the high grade zones in the Nyankanga pit and some of the other areas. And so there was a change that's been implemented to the model. In fact, the core factors were down to 7%, I think, the year before they changed the model.

  • So there have been some changes to the geological model which then took the top off some of those forecasts that I believe you would have seen two or three years ago, first thing.

  • The pit wall failure has then, on those higher grade zones, has then exacerbated and obviously deferred in time, access to those pit areas. What we have in our forecast this year is the production that's anticipated based on the productivities that have been achieved and the processing performance that has been achieved at most recent times. Both Robbie and ourselves were in a pretty long discussion about, is that the right way to forecast? And we believe it is, based on my experience, based on Robbie's experience and based on the people that -- the new people that have gone in. We've said we're not going to promise anything until we can show a concrete plan to a new pathway.

  • Now the plan had a four year ramp to 2011. And at the moment they are still working on that same conceptual plan. But to be fair to Robbie and his team -- and this is what I've got to say, is to be fair to Robbie and his team, I've said to Robbie and the team, work the issues through. Make sure you turn over every rock. And they'll have done that by the end of March. And then he'll be rebuilding the plan for discussion at the end of June.

  • And so, certainly the forecast -- we stand by the forecast for this year. It is a little bit better than last year. And we know, based on some of the forecasts you've seen, it's a year late. Obviously what 2009 looks like is very important. But what I've said to Robbie and the team, I don't want to see that number until you show me where all the issues are. And that process will be between March and June. And we'll be talking to where we are in March.

  • I think there have been too many conversations that people have made, estimates where we haven't been right. And again, being fully accountable, we're going to put the numbers up that are right. Should now see some upside and real potential. It's simply the timing conversation that I think has been our -- is the key one and to be fair to Robbie, I'm saying we're on this year's forecast. We're obviously looking to do much better in 2009, but until we've got a plan that demonstrates we're going to get there, we're not going to go forward with anything more until we've got that. Robbie.

  • Robbie Lazare - EVP Africa

  • (Technical difficulty) I think quite a number of changes there over this last month and a half and as Mark has stated substantial technical complexities and how the puzzle fits together in terms of that full body. That is a technical mine (technical difficulty). I've already had to face (technical difficulty). That has just come back. I have spoken to him this morning on some of the challenges (technical difficulty) for the outcome of that is there's technical challenges (technical difficulty). And that's fixable and actually most of those things are really fixed now by the placing of people.

  • Unidentified Company Representative

  • We'll take one more question, given the webcast that's running and then we'll be outside to follow up informally. (Inaudible).

  • Unidentified Audience Member

  • (Inaudible) from Deutsche Bank. Mark and Venkat, just Mark quickly, I'm sure there's some vigorous debate with regard to the (inaudible). What was the reason for you guys (inaudible) just to understand. Maybe it would have you been prudent to keep some cash in reserve? And then for Venkat I noticed that the balance sheet net debt to analyzed EBITDA, I just ran the number. It looks like it is popping to above 1 on a ratio basis. Are you happy with the balance sheet this month? Will you look at potential debt funding to try and get through the CapEx spend -- to get (inaudible)?

  • Mark Cutifani - CEO

  • Yes, thanks (inaudible). Firstly, we've got two operations that haven't delivered. And they've impacted what we've guided and discussed in the market over the last three years. When you isolate those two issues and look at the rest of the business, we've actually got a very strong business. We've got a healthy business. And Eskom issues, we'll manage the Eskom issues. And it's likely that we've got one hell of a good business and we've got one hell of a good -- growth profile and asset base going forward. We will sort those two operations substantially out during the course of this year, I have no doubt about that.

  • And so the dividend speaks to our knowledge that we will fix those two issues. And from my point of view, very disappointed in what we've done, disappointed in the progress we've made. But we are very sensitive to shareholders and shareholders' value. And we think it would be an inappropriate message to cu the dividend on the basis of those two assets when we know that we can fix them.

  • So on a long term basis we've got a good business. We'd like to continue to maintain a balance between capital growth and dividend flow to shareholders. But of course, depending on Eskom we'll keep that under close review. But I'm optimistic about the future and I think that it's inappropriate to jump around on a dividend policy. I think we'd like to keep paying dividends. But again, of course we'll make the right call in terms of balance sheets.

  • And from our point of view, I think it's a very clear statement of our belief in the future. And I think that will be a lot clearer when we put all the pieces together on the strategy discussion. But as we said, we are prudent. We'll keep an eye on things. We'll watch the Eskom situation and the -- and keep all of our shareholders informed in terms of those discussions.

  • S. Venkatakrishnan - CFO

  • In terms of net debt to EBITDA, if you recall, back in 2005 it was around about 2.23 in terms of outlook. So we did the equity ratings, anticipating the (inaudible) monitor. It came down below 1. You're correct. It's just gone above 1.3 at the moment. We are conscious of this and hence we actually did upscale the revolving credit facilities. Therefore, at the end of last year, our projections still so that it will be within an acceptable range but that is something which we have to keep a watch on.

  • Mark Cutifani - CEO

  • Thank you. I think with that, let's stop the formal proceedings and we do invite you to carry on the conversation outside over coffee. Thank you.