  • Operator

  • Good morning ladies and gentlemen, and welcome to today's Ashanti Goldfield's second quarter results conference call. For your information this call is being recorded. At this time I would like to turn the call over to your host today, Mr. Sam Jonah. Please go ahead, sir.

  • Sam Jonah - CEO

  • Good morning ladies and gentlemen, welcome to Ashanti's presentation of the results for the second quarter. I have the usual team with me assist with the presentation. And of course we will be very happy to take questions after the formal presentations.

  • On the operational front total gold production in the second quarter was 370,978 ounces. This was 8% lower than the 403,734 ounces recorded in the second quarter of last year. Now I hope that this doesn't come as a surprise to you, as it is in line with the previously announced lower production profile for the first half of 2003.

  • Cash operating costs for the Group rose from $192 to $222 per ounce, mainly as a result of lower gold production, the impact of increased wages and fuel prices, higher costs of other inputs and increased costs associated with the Nyankanga pit cut back at Geita. The cash operating costs of $222 per ounce recorded during the second quarter represented $2 per ounce improvement on our first quarter's performance.

  • Having successfully replaced the damaged mill pinion at Obuasi, substantially completed the waste stripping in Nyankanga at Geita, and the progress which is made on the plant expansion at Iduapriem, we believe that we have laid the foundation to improve upon our first two quarters operational performance.

  • During the quarter we completed the sale of our rights in the Mampon concession to Golden Star Resources for a cash consideration of $9.5 million.

  • Ashanti's earnings, included an exceptional gain of $7.0m after tax, arising from the sale of the Mampon property for $14.8m. Earnings, excluding the exceptional gain and related tax, were $7.8m, down $11.0m on the corresponding period last year, but up $1.0m on the previous quarter. The reduction in earnings compared with last year was mainly in line with the previously announced lower production profile for the first half of 2003, and higher cash operating costs, offset partially by higher spot prices.

  • Earnings per share before exceptionals for the quarter were $0.06 and after exceptional items were $0.12.

  • During the quarter, Ashanti repaid $10.0m towards its Revolving Credit Facility reducing the amounts drawn under the facility from $149.0m to $139.0m . On the safety we maintained our strong safety standards with the Group's Lost Time Injury Frequency Rate of 0.24 injuries per 200,000 hours worked as compared to 0.38 for the corresponding period in 2002.

  • On exploration. Underground exploration at Obuasi continued to yield encouraging results both above and below 50 level. On 41 level, the three intersections from the 252 cross cut near the BSVS shaft returned 11.5 g/t over 8.2 meters, 11.2 g/t over 27.3 meters and 7.5 g/t over 15.38 meters. On 58 level, two intersections from 155 and 206 cross cuts yielded 41.9 g/t over 3.1 meters and 26.9 g/t over 6.6 meters respectively. Also at Geita, exploration drilling continued to yield good results at Nyankanga West and Geita Hill.

  • Now on the proposed merger with AngloGold, you will probably know that we have been advised by the Government of Ghana that Soc Gen has appointed to act as financial advisers. The Ghana Government of course does have a golden share and is also the regulator. And we need Soc Gen to advise in arriving at an informed decision. We welcome these developments as we have initiatives [indiscernible].

  • At this stage let me just say that we have nothing to add to this AngloGold proposed merger. You will certainly have recognized that we cannot answer any further questions on this subject at present.

  • I will now hand you over to Trevor Shultz.

  • Trevor Schultz - COO

  • Thank you, Sam, and good morning to everyone participating today. Sam has given you the highlights of the quarter. Let me give you some more details of each operation.

  • Obuasi produced 125,000 ounces at a cost of $202 an ounce, which was 5,000 ounces above the corresponding quarter last year. The shortfall in production was due to a continuation of the lower grades, which we experiencing in the first quarter as well, and a premature failure of the SAG mill in the [SDP], the SAG mill pinion. This pinion was replaced in the first week of July.

  • Even though we are mining in lower grade blocks, we are mounting a focused and sustained effort to try and reduce dilution from these blocks to try and improve the head grade, the feed that we feed into the SAG mill from the underground. Sam mentioned the exploration in Obuasi, I don't need to go into more detail on them.

  • Iduapriem/Teberebie. We produced 57,000 ounces, a lot more than the 40,000 that we produced in quarter two last year. But in quarter two last year the production was impacted by a fire in the [alution] circuit. The costs at $225 and ounce were similar to last year. Good progress was made on the continued commissioning and debugging of the CIL plant expansion, and most of the remaining work should be finished also this quarter. The outstanding work is mainly the widening of the approach ramp to the primary crusher so that we can conduct direct tipping operations. And the relocation of an additional secondary crusher from the CIL plant to the crushing installation at Teberebie, to give us a fine feed to the SAG mill.

  • Bibiani produced 53,000 ounces at a cost of $208 an ounce, compared to 61,000 ounces at $183 an ounce last year. The lower production was due to lower grades and lower recoveries. We made good progress in the decline to reach the old workings below the final pit bottom, and this is now 500 meters below the portal. The good news there is that so far the ground conditions have been excellent.

  • We drilled a 1,200 meter exploration hole on the north side of the mine, and we made to mineralized intersections there with 4.9 g/t over 8.0 meters. This included a section of 13.2 g/t over 2.1 meters. And 8.0 g/t over 1.3 meters. We plan to do some more drilling in this area in the near future.

  • I should remind you though that the two holes that we drilled in the southern area of the mine, the deep holes there, although we intersected the [fissure] with wide width, we did not find all grade mineralization.

  • Siguiri produced 64,000 ounces, compared to 79,000 in quarter two last year. This was due mainly to lower grades which were stacked in the first quarter. The costs at $264 an ounce were much higher than the $185 in quarter two last year. This was mainly due to much higher fuel costs and much higher cement consumption as the amount of [indiscernible] ore in the feed increased.

  • A decision was made during the quarter to terminate the lump sum contract for construction of the CIP plant. Apparently the project is under review, and a decision will be made during this quarter on whether we continue with this plant expansion.

  • At Freda-Rebecca gold production as 9,560 ounces, compared with 27,000 in the second quarter last year. The production was severely impacted by lack of equipment for underground haulage and drilling, caused mainly by the shortage of foreign exchange in the country. Also recoveries were very low due to intermittent production, as we had water power disruption. Costs were $262 an ounce compared to $224 an ounce last year.

  • Geita produced 124,000 ounces, compared to 153,000 last year. With costs at $214 an ounce compared to $156. The lower production was due to the lower grades as we've been forecasting. Nyankanga stripping is on schedule, and so we should start to see the better grades coming in this quarter. In fact we should start seeing them coming in the next month.

  • And Sam has mentioned that we continue to get some good exploration results at Nyankanga west, and also in the Geita Hill area.

  • At this stage I will hand you over to Venkat for the presentation on the financial results.

  • Venkat - CFO, Director

  • Thank you, Trevor. Good morning ladies and gentlemen.

  • Ashanti's earnings for the second quarter were $14.8m. This included an exceptional gain after tax of $7.0m, arising from the sale of the Mampon property. Earnings for the second quarter, excluding the exceptional income and related tax, were $7.8m, down $11.0m on the corresponding period last year. But up $1.0m on the previous quarter. The reduction in earnings compared to last year is as a result of the previously announced lower production profile for the first half of 2003, higher cash operating costs, offset partially by higher spot prices.

  • The $11.0m dollar reduction in the second quarter's earning as compared to last year can be reconciled as follows. The reduction in turnover due to lower production, and lower release of the [indiscernible] income, partially mitigated by higher spot prices, $12.9m. Increase in cash operating costs, $5.0m. Increase in other costs, $2.1m. Lower depreciation and amortization charges, $6.6m. Reduction in interest charge following refinancing, $1.7m. Other items, $0.7m, total $11.0m.

  • Earnings per share before exceptional items for the second quarter were $0.06 as compared to $0.17 recorded last year. And after exceptional items were $0.12, as compared to the loss of $0.03 recorded after absorbing refinancing costs last year.

  • Earnings before exceptional items for the six months to 30 June 2003 were $14.6m compared to $36.3m recorded in 2002. Earnings after exceptional items of $7.0m were $21.6m as compared to $12.8m recorded in 2002.

  • Total spot revenue for the quarter was $129.4m, which equates to $349 per ounce, as compared to the $315 per ounce achieved in 2002.

  • Total hedging income for the quarter was negative $1.1m, and this comprised $3.2m of deferred hedging income and $4.3m of net cash payments in respect of maturing hedge contracts for both the Ashanti and Geita hedge books. Total realized gold price for the quarter was $346 per ounce, as compared to $350 per ounce achieved in 2002. Based on year-to-date total revenue of $257.2m the realized gold price equated to $342 per ounce.

  • The second quarter's realized gold price of $346 per ounce can be analyzed as follows. Average spot prices realized from bullion sales of $349 per ounce. Plus profits from previously closed down hedge contract [indiscernible] to the profit and loss account of $9.0 per ounce. Less net cash paid on maturing hedge contracts of $6.0 per ounce in respect of the Ashanti hedge book, and $36.0 per ounce in respect of the Geita hedge book, which on a weighted average basis equates to $12 per ounce [indiscernible].

  • Turning to hedging. At 30 June 2003 Ashanti had 4.5m ounces protected at an average price of $360 per ounce [indiscernible] on the hedge book, with commitments of 6.4m ounces. The mark-to-market valuation of the Ashanti hedge book at 30 June was negative $108m based on a spot price of $346 per ounce. Ashanti's 50% share of the Geita hedge book was negative $39m.

  • Mark Arnesen is available to answer any questions you may have on our hedge portfolios.

  • Turning to cash operating costs for the second quarter. Cash operating costs were $222 per ounce, up $30 per ounce on last year, but represented at $2.0 per ounce improvement on the previous quarter. Costs, as in the first quarter, were impacted by lower production, higher costs of inputs, increased costs associated with the Nyankanga pit cut-back at Geita and higher ore rehandling at Iduapriem. The cash operating costs for the six months to 30 June 2003 were $223 per ounce, which represents a $32 per ounce increase on $191 per ounce recorded last year.

  • In response to your question raised during the last conference call, this increase can be explained as follows. Impact of reduction in production on per unit costs, $16 per ounce. Impact of increased wages and fuel price increase, approximately $7.0 per ounce. Other factors, ore rehandling at Iduapriem, Geita pit cut-back, costs of inputs at [indiscernible] Siguiri, etc. $9.0 per ounce.

  • Total operating profit before exceptional items for the quarter was $13.6m. Non-mine site exploration expenditure written off in the second quarter was $900,000, bringing year-to-date expenditure to $1.6m. Corporate administration expenditure for the quarter was $6.3m and year-to-date $12.3m.

  • Interest charge for the quarter of $4.6m was $1.7m lower than last year following the refinancing in June 2002 and the current prevailing lower interest rates.

  • In June Ashanti sold its interest in the Mampon property near Obuasi to Bogoso Gold Limited and Golden Star Resources Limited, for a cash consideration of $9.5m, resulting in a profit on sale before taxes of $7.8m.

  • The tax charge for the quarter was $1.8m and comprised $800,000 tax on the sale of the Mampon property, $800,000 in respect of Geita's profits subject to United Kingdom tax and other tax of $0.2m.

  • Cash inflow from operating activities for the quarter was $15.3m and $32.1m year-to-date. Net interest payments in the quarter were $2.2m as compared to $5.1m recorded last year. And you will recall that the last year's payment included the final interest payment on the exchangeable notes which were redeemed far ahead of schedule.

  • Capital expenditure for the quarter was $20.5m, higher than the $15.7m recorded in 2002. And it included $8.6m at Obuasi, $4.3m at Iduapriem and $5.9m at Siguiri.

  • As explained in the operation review in the announcement, the feasibility of the CIP plant expansion project is under review, following recent difficulties with the termination of the construction contract. Discussions are currently under way with potential replacement contractors. Expenditure to date of approximately $7.2m continues to be capitalized pending the outcome of this project review.

  • In May, $6.6m was raised from the exercise of a further 2.18m warrants. As a result the stated capital increased to 130.8m shares and 2.5m warrants currently remain outstanding.

  • During the quarter, Ashanti paid down $10.0m of its Revolving Credit Facility, reducing the amounts drawn to $139.0m. At the quarter end, the gross debt level, excluding the 50% share of the non-recourse Geita project finance loan, was lower at $245.7m, as compared to the $255.9m lat year. Ant it can be analyzed as follows. Amount drawn under the $200m Revolving Credit Facility $139.0m. Iduapriem/Teberebie project finance loans $22.1m. Other loans, net of deferred loan fees, $9.6m. Mandatory Exchangeable Notes, $75.0m

  • This concludes on my side, and I now hand you back to Sam.

  • Sam Jonah - CEO

  • Well ladies and gentlemen, we will now take questions.

  • Operator

  • Yes, sir. The question and answer session will be conducted electronically. To ask a question press the star or asterisk key on your telephone keypad, followed by the digit one at this time. We will take as many questions as time permits, and proceed in the order that you signal us. Once again, press star, one to ask a question. We will pause for a moment to assemble the roster.

  • We will take our first question from Mr. Mark Smith of The Royal Bank of Canada. Please go ahead, sir.

  • Mark Smith - Analyst

  • Hi there. Just some questions for Trevor really, housekeeping on Geita and Siguiri. Going forward, what would be a good strip ratio for Nyankanga pit? Also we've seen the grade come down to 8.2, what's the outlook for the next six months and going into 2004 on anticipation of getting higher grade from Nyankanga? Also the recoveries are slightly down, 91.5. What is the guidance there going forward for recoveries?

  • At Siguiri, really just some guidance on the cash costs going forward. As you said they have increased due to the increased [indiscernible] core, and cementation costs at 2.74. Going forward over the next 12 months, perhaps some guidance on the costs? And also any timing on the CIP expansion and when we can expect some replacements for the contractors? Thank you.

  • Trevor Schultz - COO

  • Okay, Mark, this is Trevor. A long list of questions there. So if I miss something out just remind me. Starting off at Geita you asked about the strip ratio going forward, I think, particularly at Nyankanga. Nyankanga towards the end of the [pit] gets up to very high strip ratios, in the region of 20. it currently be running around 10 to 11. But there are a series of cut-backs which take place over the next few years, and the strip ratio will increase obviously with each cut-back.

  • Then you asked about the grades in Nyankanga. Once we get into the meters, the high grades, which should be probably around mid August, I expect the grade for Nyankanga will be over 4 grams. In fact they should be between 4g grams and 5 grams between now and the end of the year when we get into that high grade zone. We have already started hitting some of the [hanging wall] splays, but they are relatively tonnages. But we have already grades over 4 grams coming out of the hanging wall space.

  • The recoveries have been lower at Geita. That is partly a function of the lower grades that we've been feeding to the mill. But it's also, if you look at, it's also a function of the higher throughputs. We have been getting much better throughputs there. In fact we've been getting throughputs in individual months at an annualized rate which would give us 6.0m tons a year through the plant. You might remember when we designed it we said the throughput was going to be between 5.5m and 6.0m on the year, so we are achieving the design throughput rate.

  • In conjunction with those higher throughputs we made the decision earlier this year to put in some additional leech tanks and an oxygen plant. As those will only be completed towards the end of the year - they're due for commissioning in November. So I think we will continue to see somewhat lower grades, although I do expect some pick-up when we start getting the higher grade feed to the mill. But we probably won't be back up to 93% until we get those additional leech tanks put in and the oxygen plant. Which as I said should be by November. And once we've got that in then I expect we will see the recoveries again around 93%.

  • At Siguiri the cash costs for the next 12 months, I'm not ready to give you those yet. We are just doing our next life of mine plans for Siguiri. I wouldn't like to give you a figure now, which is way out of line. But I think we will continue to see high cash costs at Siguiri. But I'd like to take a time out on giving you the actual level of those costs until we've completed this planning cycle. We will certainly have them when we make our next quarterly announcements.

  • The CIP plant, we are currently doing a review. In fact we will be interviewing potential replacement contractors over the next few days. But the entire project is being reviewed, the entire feasibility, because we know that the capital costs are going to be significantly higher than we previously announced. But we have to review everything, the entire feasibility of the project. We will decide during the course of this quarter, and the decision will be made before the end of this quarter whether we continue with that project or not.

  • Mark, I hope I've covered all your questions? Was there something else?

  • Mark Smith - Analyst

  • No, that's fine, thanks very much.

  • Operator

  • We will take our next question from [Patrick Chardley] of [Barnett Jacobs Mellett]. Please go ahead, sir.

  • Patrick Chardley - Analyst

  • Hello, everybody. I just wanted to ask if there's any update on the Obuasi [indiscernible] project at all?

  • Trevor Schultz - COO

  • Patrick, Trevor again. No, there isn't anything new to announce. Sam announced some more drill intersections below 50 level.

  • Patrick Chardley - Analyst

  • Yes, very good.

  • Trevor Schultz - COO

  • But we're continuing with the feasibility of the deep levels. We don't have anything significant to announce at this time, Patrick.

  • Patrick Chardley - Analyst

  • Any idea when there might be some sort of announcement on that? This year, next your, or --?

  • Trevor Schultz - COO

  • I think early next year. It's going to take us the rest of this year working on the various aspects of the feasibility and continuing with the drilling we will soon have drilled rigs in the northern plunge as well. So I wouldn't expect anything significant to announce until early next year.

  • Patrick Chardley - Analyst

  • Great, okay, thanks.

  • Operator

  • As a reminder, to ask a question press the start or asterisk key on your telephone keypad, followed by the digit one at this time. As there are no questions remaining in the queue at this time, I would like to turn the call back over to Mr. Jonah for additional or closing remarks. Please go ahead, sir.

  • Sam Jonah - CEO

  • Thank you. Once again thank you very much, for coming on the line. And we look forward to having you back in three-months time. Thank you. Bye-bye.

  • Operator

  • that will conclude today's conference call. Thank you for your participation, you may now disconnect.