  • Operator

  • Good morning. Welcome to the Hanover Compressor Company second quarter 2007 earnings conference call. At this time I would like to inform you this conference is being recorded and that all participants from in a listen-only mode. At the request of the company, we'll open the teleconference for question and answers after the presentation. Earlier today, Hanover released its financial results for the second quarter ended June 30, 2007. If you have not received a copy, you'll find the information on Hanover's website at www.Hanover-Co.com. Again, that's www.Hanover-Co.com.

  • I want to remind listeners that the news release Hanover issued this morning, the company's prepared remarks on this conference call, and the related question and answer session include forward-looking statements. These forward-looking statements include projections and expectations of the company and represent the company's current belief. Various factors could cause Hanover's results to differ materially from those projected in its forward-looking statements. Information concerning the factors which could cause Hanover's actual results to differ materially from those in its forward-looking statements can be found in the company's press release, as well as the company's SEC Form 10-K for the year ended December 31, 2006, the company's SEC Form 10-Q for the three months ended March 31, 2007, and the company's other SEC filings. With us this morning are John Jackson, President and Chief Executive Officer, and Lee Beckelman, Senior Vice President and Chief Financial Officer. I would now like to turn the call over to your host, Mr. John Jackson. Mr. Jackson, you may begin your conference.

  • John Jackson - President, CEO

  • Thank you. I want to welcome everyone to our second quarter call. We're pleased today to report our continuing improving results. We had a number of records this quarter. We had record revenue, record EBITDA, record revenue and gross profit in fabrication, and we had record backlog and record bookings. So we continue to see strong activity in our business lines, especially in the international arena in the eastern hemisphere.

  • On top of that, we achieved these results and continue to achieve both first and second quarter results while working pretty extensively on the merger. As you imagine, we worked our way through the DOJ process and began to work on many facets of the speak gracious that we were allowed to work on during the last couple of months. It's taken a lot of employees' time and I want to compliment everyone on a job well done to continue to deliver these kind of improving results. The merger process continues on track and we are scheduled to have our shareholder vote on August 16, and then if all goes well there and it is approved, then we will close shortly thereafter.

  • Turning our attention back to the quarter, fabrication backlog reached a new record of $1.030 billion, versus 772 at the end of Q2. Bookings for the quarter and fabrication was also a record of $521 million. We had compression bookings of about $85 million, and production and processing bookings split between oil and gas and Belleli. Oil and gas of a little over $100 million and Belleli, a little over $300 million of bookings. Compression fab continues to perform very well for us. You can see we had some very nice margins this quarter. We recorded record gross profit margins. We ended up selling some units that would have typically gone in our rental fleet, but with the opportunities we had in front of us to sell these at very attractive margins, we went ahead and did that, as a number of these had purchase options on them anyway, so they weren't going to be in our rental fleet for more than a year or two.

  • The backlog at the end of June in compression is about 55% in the eastern hemisphere, which that's about where it's been the last three quarters, between 50 and 60% of our compression backlog continues to be outside of the U.S., and we can -- even with record revenues running off and compression fab, we continue to see strong activity, especially in the eastern hemisphere for production and processing and compression. On the production and processing side, we had nice revenue in gross profit. We had our margins in the 15 to 16% range, but we were hit by a little over, a little under $7 million charge for some rework of some product that we had at Belleli on one particular job and one particular incident. So very, very expensive issue for us and would have put our margins up closer to 20% without that incident, but in spite of that, we still had nice margins in the quarter and Belleli continued to see nice growth in their backlog.

  • On the rental side, the U.S. utilization continues to decline slightly quarter on quarter. The returns continue to be in the small horsepower and the large horsepower continues to be utilized around 90%-plus. We did have a price increase on June 1, which was a small modest 2% price increase, if you put it across the fleet, but that really was an attempt to move our month to month contracts to our new price list, which we instituted back in March, that we talked about. This has been our typical pattern. We'll put a price list out there and see what the market rates really are, and then we'll begin to move our month to month contracts to that price list. So we, we put that through in June, had reasonably good success with that, but again, we continue to see sort of a two-tier market. The smaller horsepower, higher returns and the larger horsepower high utilization.

  • On the international front, we had one project come on in Mexico this quarter. We have a number of scheduled to still come on later in the year that, and early next year that we'll talk about. Nigeria and Cawthorne Channel did begin to get some gas in July, so we processed intermittently throughout the month of July, as we're trying to bring that plant back online. So between gas supply interruptions and between maintenance repair to get the plant back online, it's been down for a year, we have had some processing going on, but it's not been at a full, stable rate for extended periods of time. But that is good news over the last 13 months. We haven't seen production there. We're seeing that hopefully turn around.

  • As we look ahead, the U.S. expects, we expect to continue to add new rental units in the second half of 2007, all on the large end. Our service excellence initiative continues to be under way. We are seeing higher costs right now, as we expected, as we try and do a lot more preventative maintenance today to avoid larger repair and maintenance costs in the future. That is leading to an acceleration of costs for the moment we believe will pay off in '08 and beyond.

  • On the international side, we continue to try and build our rental backlog into '08. We have a couple of projects in Latin America that should come online in the second half of this year. Towards the end of the year, we have a number of midsized jobs quoted in the eastern hemisphere and we have a couple of eastern hemisphere rental jobs that have been awarded that will start up in 2008. The eastern hemisphere's had a nice growth in activity, and if you look at it, the backlog that we're seeing today is of the $1.030 billion, 82% of our backlog is in the eastern hemisphere. And if you just carve Belleli out, compression, as I mentioned earlier, about 55% of it's eastern hemisphere, 69% of our production of processing oil and gas backlog is in the eastern hemisphere.

  • So as we sell product, what we're trying to do, then, is come behind that, begin to build the O and M activities, we're quoting a number of O and M jobs that go along with these sales and then ultimately we believe that leads to rental opportunities in country and we're beginning to see those start to come around. So the model for the last three years has been establish a presence in the country, sell first, O&M second, rent third. We've certainly got the sales side going very well at this point, with over $800 million of backlog in the eastern hemisphere, and now we're moving our way through the next two pieces of pour model. That meaning service and rental.

  • On the fabrication side, compression activity still remains strong. Our quote backlog is very high. We had solid bookings for the quarter, but we had record revenues, so our backlog's down slightly. We -- in the production and processing side, Belleli had a record quarter of bookings, but as we look ahead, again, we still have a lot of activity in the quote backlog, especially in the eastern hemisphere. On the production and processing side and the oil and gas division, we still have record quote activity. We have over 40 jobs of some sort of total solution that we're in the process of quoting in some form or fashion, being in the early bid stage and the late bid stage, and these are a little bit longer line. I think last quarter, we talked about $1 billion in quote backlog and we closed $0.5 billion of it in the quarter. Some of the quotes we're working on now have a little bit longer to run before they are going to be awarded, but we still expect to receive a large proportion of this activity once it's led.

  • On the merger front, we mentioned the shareholder vote is expected to happen August 16. The benefits continue to sit in front of us that we've seen before. I believe CDN filed today an S1 for an MLP, which is another privately owned compression company, so, again, getting this deal done and getting in to be part of the first compression MLP out there, and having a much bigger dropdown base we think is a big benefit for both companies. So I think both companies have done well, planning the integration and working together. We're well positioned for the merger, with a record backlog, international strong activity and we're working hard on the integration to make this as seamless as possible for our customers.

  • And finally before I turn the call over to Lee, I just want to say to the employees, I want to congratulate all the employees for the results for this year and how we're positioned as we move ahead. If the merger does get approved, which we anticipate and hope for, I want to thank you for all the work I've had the opportunity do with you all here at this company the last 5.5 years. It's a great place, great people. I am very excited about the future of the merged companies. So with that, Lee?

  • Lee Beckelman - VP/CFO

  • Thanks, John. I'll be going over the financial results for the second quarter and will be comparing those to first quarter 2007 results, beginning with U.S. rentals, revenues were flat compared with the first quarter to approximately $100 million, with gross margin decreasing marginally to 60% from 61% last quarter. The gross margin decreased primarily due to higher maintenance and repair expense and increased preventive maintenance costs associated with the implementation of ur service excellence program. Utilization did decline in the quarter to approximately 81% at the end of June, from 83% at the end of March. We continue to see a little lower utilization in our low smaller horsepower units due to higher churn. That was partially offset by increased activity in the higher horsepower units.

  • We are seeing more competition in the smaller unit categories, as well as customers optimizing their compression needs in the field and moving to higher horsepower units in centralized locations versus smaller units at the wellhead. In the quarter we added approximately 18,000 new horsepower to our fleet in the U.S., primarily all of which was larger horsepower units and we do, as John mentioned, continue to see high utilization and pricing and strong demand in the larger horsepower categories. In the third quarter we expect revenues and margins to be consistent with second quarter results.

  • Going on international rentals, revenues increased sequentially to $70 million versus $67 million last quarter. The gross margins did decrease to 60% versus 65% in the first quarter of 2007. Revenues were up primarily due to increased activity in Mexico and Argentina. In June, we did bring a new rental processing plant online in Mexico, and that will be fully online in the third quarter. Gross margins did decrease in the quarter due to increased expenses, primarily in Latin America, for repairs and some demobilization costs associated with some units that went off contract. Additionally, we did have high initial operating expenses on our project in Oman that was online, that came online during the quarter. Utilization remained at 96% at the end of June, and looking out into the third quarter, we expect revenues to be in the low $70 million range with margins in the mid 60% range.

  • Going on to parts and service, revenues for the quarter decreased to $73 million versus $81 million in the first quarter 2007, while margins improved to 23% from 19% last quarter. Base parts and service revenue increased to $50 million versus $47 million last quarter and margins improved to 27% compared to 24%. The revenue increase is primarily due to increased activity in the U.S., with margins improving primarily due to higher margins on international part sales. Installation and used rental equipment sales decreased to $23 million from $34 million in the third quarter, primarily due to lower installation activity. Margins were improved to 14% compared to 9% in the first quarter, and that was due primarily to higher margins on used equipment sales in the quarter. Looking out into the third quarter, we expect base parts and service revenues to be in the mid to high $40 million range, with margins in the mid 20% range.

  • Going on to compressor fabrication, as John talked about earlier, we had record results in compressor fabrication. Revenues increased by approximately $61 million to $140 million, with margins improving to 24% versus 20% last quarter. As we discussed on the last quarter's call, we did have compressor fabrication activity did pick up in the quarter, as we shifted more shop space to third party sale versus building fleet units. As John mentioned, our backlog did decline to $299 million at the end of June, compared to $354 million at the end of March. This reduction is primarily due to the high revenue recognition in the quarter, as John has already talked about, we continue to have very strong bid activity in the U.S., as well as very strong activity internationally. Looking out to the third quarter, we anticipate revenues being in the $115 million to $120 million range with margins in the low 20% range.

  • For production processing, equipment fabrication, revenues did decrease sequentially to $123 million versus $133 million last quarter, and margins declined slightly to 15% versus 16% last quarter. As John discussed earlier, margin in the quarter were negatively impacted by about, approximately $6.7 million of rework costs associated with one project at Belleli. That impacted margin about -- production processing margins in quarter by about 6%. Revenues were down primarily due to lower revenues at Belleli. Belleli's revenues went from $98 million last quarter to $81 million this quarter. That was primarily related to timing of projects running through the facility.

  • Looking at backlog, backlog increased to $732 million from $419 million at the end of the first quarter. And as we've discussed earlier, this has been driven by increasing strong activity in the eastern hemisphere. As we look to the third quarter, revenues are anticipated to be in the $140 million to $150 million range with margins in the mid teens, excluding any impact from foreign currency fluctuation. Looking at SG&A expense in the quarter it did increase to $56 million versus $52 million last quarter. That was primarily due to higher incentive compensation expenses and a full quarter of merit increases. We also did have $3 million of merger-related expenses in the quarter, with the anticipated close of the merger in the third quarter, margin-related expenses will be increasing. Universal will provide some update for that potential anticipated merger costs on their call next week.

  • EBITDA for the second quarter was $122 million versus $118 million last quarter, and as we've discussed, that EBITDA improvement was primarily driven by the improved compressor fabrication results, as well as the improved margins on parts and service business. Going on to net income for the quarter, we had net income of $26 million, or $0.23 per fully diluted share, which was basically flat with first quarter results. As we look at liquidity, total debt end of June was approximately $1.35 billion. We had $73 million of outstandings under our revolver at quarter end and today currently have approximately $63 million in outstandings. Letters of credit outstanding at the end of the quarter were $234 million and today we have around $243 million of letters of credit outstanding and currently we have approximately $145 million availability under our revolver, with no limitations currently on that availability.

  • As we look at capital expenditures, we spent $69 million in the quarter on capital, $30 million of gross capital was spent in the quarter. The split of that gross capital was $22 million international projects and $8 million for U.S. projects. Our maintenance capital was $30 million in the quarter. $7 million was spent on capital associated with our 200-plus program for refurbishment of idle units and $23 million was on regular maintenance and we had $9 million of other capital spend in the quarter, of which $7 million was related to improvements on equipment and our fabrication facilities and $2 million on other capital items. For 2007, we continue to expect capital expenditures to be in the 325 to $375 million range, with maintenance capital including capital with our 200-plus program to be in the 70 to $80 million range.

  • And with that, that's all our prepared comments and we'll be -- we would now like to open up for questions.

  • Operator

  • Thank you. (OPERATOR INSTRUCTIONS) We'll take our first question from Kevin Pollard with JPMorgan.

  • Kevin Pollard - Analyst

  • Good morning.

  • John Jackson - President, CEO

  • Good morning, Kevin.

  • Kevin Pollard - Analyst

  • I wanted to dive into the production processing margins a little bit more, without the one-time charges in Belleli this quarter, they would have been north of 20%. I'm wondering if that's indicative of where the margins can go, as we go forward and work through the backlog that you've been building.

  • John Jackson - President, CEO

  • Yes, there's really two pieces to it. The mix between the oil and gas business and the Belleli business, because those two do have different performance at the current time and I would say the oil and gas margins are clearly in the 20s, solidly in the 20s. The Belleli business has been moving in the single digits and with this quarter, we would have been around 14, 15% at Belleli, is that--

  • Lee Beckelman - VP/CFO

  • Without -- Belleli--

  • John Jackson - President, CEO

  • So I think depending on the mix of how much revenue is running through in any one quarter, 20% margin longer-term, with the backlog is I think reasonable to assume.

  • Kevin Pollard - Analyst

  • Okay. Based on, I'm assuming the orders you're booking now have margins higher than what's running through the P&L right now.

  • John Jackson - President, CEO

  • Yes, and, again, the mix, as you look at Belleli, they have been moving from the 8 to 10% to the 12 to 13, 14 to 15. As we book most of our projects going forward are higher than the 14 or 15 at Belleli. But they may be even more like 17 to 19, whereas the oil and gas may be 25. So depending on your mix, you could end up at, 20 or you could end up at 22 or somewhere in that mix, just depending how much in any one quarter is oil and gas versus Belleli. But, yes, most everything being booked today is being booked at higher than flowing through.

  • Kevin Pollard - Analyst

  • Okay. Thanks. Switching over to the domestic business real quick, I was -- the horsepower growth was a little bit less than I was expecting. I was wondering if the pending merger with Universal has had any impact on the rate at which you're attempting to deploy equipment, your domestic fleet, if there's any, any -- maybe slowing down a little bit, while you wait for the merger to close so it can be done under the new company's umbrella.

  • John Jackson - President, CEO

  • Well, certainly some of the activity you saw in compression fab this quarter was selling some units that would have gone in the rental fleet. And again, we had an opportunity to sell them at we thought very attractive margins and some of those came out of the rental fleet that were already in there at the end of March, so we had some of those units on rent and some of the units we were going to build and put on rent. That was an example. I think we took the opportunity to, let's just say, make the best return overall. Otherwise, I think we're really not slowing down what we're putting in the rental fleet as much as we're optimizing how quickly it goes in the rental fleet versus our sale opportunity. I think over the course of the year we'll still hit our 100,000 horsepower target. We just may have shifted more of the sales to the front half of the year and pushed the rental out a little bit. But I believe by the time the year gets done, we'll have moved most of that in the rental fleet. I wouldn't say any of it's really driven by the merger, just it's more opportunity and timing.

  • Kevin Pollard - Analyst

  • Okay, thanks.

  • John Jackson - President, CEO

  • Okay.

  • Operator

  • We'll take our next question from Mike Urban with Deutsche Bank.

  • Mike Urban - Analyst

  • Thanks, good morning. On the, in the international side, as you move to push more of the full suite of products and services, if you will, into some of the markets where you've been selling equipment, are there any markets in particular where you're further ahead in those efforts, or where we might see some success sooner rather than later in getting some of the parts and service and the rental business up, ramped up?

  • John Jackson - President, CEO

  • Yes, I would say there's some middle eastern and -stan countries that we've probably made more progress on. Oman's a good example. We had a rental project started earlier this year. We have another rental project we were awarded that will start plant and production starting next year and we have a compression rental job that should start next year. So we'll have a compression-rental only job at Oman at what we think are attractive rates, moving equipment over there. So Oman we've made a lot of progress in, Pakistan, we've sold our product, we've been able to get O&M behind that. We seem to be growing that base and then Kazakhstan is a country where we've sold a lot of product that we have actually moving a gentleman into the country to be the country manager to try and develop the O&M business and the rental business. And so we're trying to quota lot of O and M activity as we begin to deliver that compression at Kazakhstan. So I would say those are three examples we're probably further ahead. There's a number of other countries where we're selling a lot of product that we need to get people on the ground and up the curve that we feel comfortable delivering that O and M product, but I think right now we've been focused on the areas where we've been selling the most product and it seems to have worked pretty well.

  • Mike Urban - Analyst

  • Okay, and doesn't look like this -- it was the case given the backlog growth, but has there been any slowdown or need to pause in terms of pursuing new business as a result of the merger being out there?

  • John Jackson - President, CEO

  • No. I think the only reason we give pause on pursuing new business is our engineering and shop capacity to actually deliver it and do the kind of quality job that we're accustomed to doing. So that's really the only issue we continue to face, is as this backlog gets longer and as it gets bigger, do we have the place and the people to get it done and do it effectively, because we don't want to get ahead of our capability. So that's really our only constraint at this point.

  • Mike Urban - Analyst

  • So no concerns from the customers about who they are dealing with and who is going to be the on the other end of the project?

  • John Jackson - President, CEO

  • No. I -- again, over 80% of the backlog is in the eastern hemisphere and from their perspective, given, given our lack of overlap over there, it's really sort of side by side. We have the Universal folks in Singapore and Thailand and Australia, and we have very little overlap in countries and customer base. So they are going to see the same people and work with the same people from both companies generally speaking in that part of the world. So it's going to be probably the same three months from now to them as it is today.

  • Mike Urban - Analyst

  • Okay, great. Thank you.

  • John Jackson - President, CEO

  • All right.

  • Operator

  • Take your next question from Bruce Wilcox with Cumberland Associates.

  • Bruce Wilcox - Analyst

  • Hi, good morning.

  • Lee Beckelman - VP/CFO

  • Hi, Bruce.

  • John Jackson - President, CEO

  • Hi, Bruce.

  • Bruce Wilcox - Analyst

  • Felt very sentimental at you took your look back here, complimenting your work force. You guys have done a great job for us over a long time. I'm curious what you're doing or seeing in Venezuela right now because, we're aware that some of the smaller companies anyway are starting to gear up, but I'm not sure what the net-net of all the Chavez initiatives is.

  • John Jackson - President, CEO

  • What we're seeing in Venezuela is the opportunity -- we've had the opportunity to put some idle equipment in countries back to work on some jobs that we're already there and we just want to do some expansion. We've taken that opportunity and there's one additional project that should come online by the end of this year, hopefully fourth quarter-ish that is a fairly sizable project that will be new for us, but from a payment perspective and an activity perspective, it's probably as strong as it's ever been. It continues to be something we monitor very closely, but we haven't had any issues, but we actually have seen a little bit more activity in the last six months than we've seen in three years.

  • Bruce Wilcox - Analyst

  • And can you tell me, John, what the, what [Yukos] presence in that country is, if any?

  • John Jackson - President, CEO

  • It -- from what I can recall, reading, it's very small. I think they have a few units down there. I know they have bid on a couple of projects back in the spring or last fall I believe they were awarded. So from an overlap perspective, we're going to see a great diminishment in exposure as a relative size of the company in Venezuela. So this isn't one of Universal's larger countries. It tends to be more of the Brazils, Argentinas and Mexicos and Venezuela's pretty small on their radar.

  • Bruce Wilcox - Analyst

  • Okay. Go ahead.

  • Brian - Analyst

  • Sorry, sorry, guys. This is [Brian]. I was curious, I know you were gaining -- what, if you can say, what you're trying to achieve in terms of the merged balance sheet.

  • Lee Beckelman - VP/CFO

  • Well, Brian, we really can't say anything about that right now. We're going through the financings that are in place that are being led. We're also doing some tenders on some of Hanovers bonds that are public today and those are in process and they are going well. And to the extent there's any ability to give an update prior to the merger, I think those folks at Universal have a chance to do that next week.

  • Brian - Analyst

  • Okay, thanks.

  • Bruce Wilcox - Analyst

  • Thank you, guys.

  • John Jackson - President, CEO

  • Thanks.

  • Operator

  • (OPERATOR INSTRUCTIONS). We'll go next to Robert Christensen with Buckingham Research Group.

  • Robert Christensen - Analyst

  • Yes, coming to the U.S. compression market, the utilization rate slipping a little bit to 81%, can you just put a little more light on that -- never like to see that happen, but--

  • John Jackson - President, CEO

  • Yes. No, absolutely. There's -- we certainly talk about it a lot and focus on it and try and see what's going on and from our perspective, we're broken into three geographic regions today. We sort of have the west Texas Rockies region, the gulf coast, south Texas region and we have the mid continent Ark-La-Tex region. Most of the decline in the horsepower has been in the mid-continent Ark-La-Tex region. The other two regions are relatively flat. They have been able to hold their utilization. So what we're seeing is the smaller horsepower in some areas being replaced with larger customer-owned horsepower. So they are taking the well head units and the units up to, say, 4000 horsepower, and replacing them with 1000-horsepower units at more of a central station where they are trying to own and operate the horsepower, because they think they're going to have it there for a longer period of time.

  • That's one thing going on and I think the other thing is we, on the pricing front, on the smaller horsepower, continue to try and achieve what we consider to be a reasonable return on small horsepower and there is a lot of competition at the smaller horsepower level on a very regional basis. So, and those tend be very price sensitive, so we have not at this point changed our pricing down. In fact, it's been generally up so that we can make a good return on those units that we do have out. That has led to, I think, the combination of owned and larger horsepower by the customer, as well as pricing, we tend be on the high end of the pricing grid right now on the smaller end just because there's a lot of -- it's very easy to get a smaller horsepower unit and put it up for rent. We'll evaluate that as we move ahead on a combined company, and see how the combined company wants to focus on the smaller end horsepower, but right now that's really what's going on.

  • Robert Christensen - Analyst

  • In the Rockies, how should we look at that situation right now, coming out with the Rockies express coming out, is that going to help the compression market out this, or is it going to hurt the compression market? I'm trying to think of it two ways, just got off a conference call with Anadarko, they are talking about doubling their compression in the Powder River Basin because frankly they have got pressures to overcome right now. I don't know how to read, the fulcrum here. Is it positive or negative for the compression market in the Rockies?

  • John Jackson - President, CEO

  • Well, I think the Rocky Mountain Express is going to be positive. That's my view. It's going to be positive at the compression market because you should be able to take your wide swings and basis differentials in the Rockies and narrow that volatility a lot. You should get a lot closer to Henry hub pricing on a more static basis. So from a driller's perspective, and this is just my supposition, from a driller's perspective knowing they are not going to have $3 basis differentials in the Rockies that may be more stable at $0.50 or $1 or $0.75 and they can kind of plan their drilling budget around that and their production budget around that I think will lead to more sustained drilling and therefore more sustained production and with all the plays up there, definitely the sustaining for compression. Rockies, typically the Northern Rockies have been particularly an owned market, and then the San Juan Basin has a nice mix of owned and rented, but I think as the compression needs grow up there and as you will be able to actually grow the rental market in the Rockies, as well as grow the sales market. So I think for compression long term, it's going to be really good.

  • Robert Christensen - Analyst

  • One more international processing, the Dubai yard, does that yard eventually have to be expanded and what kind of throughput do you envision to that yard in way of getting--

  • John Jackson - President, CEO

  • Well, it's a nice problem to have. I think some of it depends -- some of the growth in the Belleli backlog was D Southland. There's two styles of D Southlands, one you build in the yard and one you build onsite. So to the extent you build it onsite you definitely use up manpower, but you don't use up yard space and then the other half of the Belleli growth was in the [Montreva] Italy reactor business and they are pretty, pretty full. So to the extent they add backlog, it really is linked, as we don't plan to do any expansions in Italy, but we can add links to the backlog and that's what we hope to do, by hopefully -- again, they have to plan further ahead. So the Belleli yard right now is very full. Both yards are very full, but we think we have the capacity to deal with it, because we can see a lot of it on the work site.

  • Robert Christensen - Analyst

  • Got you. Thank you.

  • John Jackson - President, CEO

  • All right. Thanks.

  • Operator

  • (OPERATOR INSTRUCTIONS). We'll go next to Geoff Kieburtz with Citi.

  • Geoff Kieburtz - Analyst

  • I guess it's probably more of a merger-related question, but, John, you mentioned that personnel is a constraint on your engineering personnel's constraint on your international growth. Could you elaborate a little bit more and maybe put it in the context of how that might change post merger?

  • John Jackson - President, CEO

  • Well, when you're bidding 45 or 35 or 25 projects that involve plants and treating and processing, it does take some engineering time to get a bid together and then heaven forbid if you actually win them all, you have to engineer all the detail and the site and a lot of these have site construction, so not only do you have bidded engineering, you have in the engineering to actually put the plans and ideas together and then have you what we'll call the onsite construction project management, which is another constraint inside this company. So what we've been trying to do is find a nice balance between having the staff to pursue these projects and not overstaffing to the point that we're trying to win everything that we don't have capacity for.

  • So I think as we move ahead, we'll be able to take some resources from Universal and take some resources from Hanover and rebalance the load, and find some efficiencies in a large part of the organization, but I think this is one area that if the activity continues to grow, there won't be a lot of synergy in, because we'll have much higher top line revenue growth. So we'll try and train some people that are in other facets of the company and move them over to this side, but project managers are kind of a skill set unto themselves, you have to really go out and find them and hire them. You can grow a few internally, but I don't see a lot of incremental resource coming out of the merger that's going to allow us to add a lot of capacity to the total solutions side. I think we're, again, going to have to kind of find that and grow that or hire it, but I don't think we'll get a lot of that out of the merger.

  • Geoff Kieburtz - Analyst

  • It sounds like hiring is going to be sort of the path forward, then. Is that--

  • John Jackson - President, CEO

  • Yes.

  • Geoff Kieburtz - Analyst

  • -- something Hanover is able to do in the, , in the advance of the merger? Are you bringing people into

  • John Jackson - President, CEO

  • On a very selected basis, that's absolutely true. When we had this backlog explosion here in the last three months, I think on the last call we said we had $1 billion in quote backlog and we won a lot of it. We expected to. So we have been selectively adding project management and/or engineering to this kind of the equation to help fund this growth. I think we've coordinated, the integration process as we look ahead, as far as how we're going to put the two companies together and drive synergies out, but on this end of the business, this is kind of a stand-alone business on our side that really isn't overlapping on the Universal side, so we continue to manage it as its own business.

  • Geoff Kieburtz - Analyst

  • Okay, and you are able to find the skill level of people that you're looking for?

  • John Jackson - President, CEO

  • With a lot of work.

  • Geoff Kieburtz - Analyst

  • Okay.

  • John Jackson - President, CEO

  • Yes, we have been successful in bringing some people in that -- we brought a gentleman in -- right before we announced the merger, with GE for quite some time, project manager with skills, very talented, has been a really nice add to the company and we continue to look for those kind of people and add them in both over in the eastern hemisphere and here in the U.S.

  • Geoff Kieburtz - Analyst

  • Great, thank you.

  • John Jackson - President, CEO

  • All right.

  • Operator

  • And we do have a follow-up question from Kevin Pollard with JPMorgan.

  • Kevin Pollard - Analyst

  • Thanks. John, I know it's kind of a moving target with all the different pieces into the production and processing backlog, but can you help us think about the $732 million backlog and how that, the timing of how that flows through the revenue line?

  • John Jackson - President, CEO

  • The backlog that's on production and processing, which is about $160 million, give or take, is probably, what, nine months, 12 months?

  • Lee Beckelman - VP/CFO

  • Typically the production processing, the backlog runs off of 9 to 12 months.

  • John Jackson - President, CEO

  • So it's -- the only reason it takes that long is some of the parts that you have to order, you have long lead items that may take six months to get in and that kind of thing. The Belleli component, which is the other 350, give or take, probably is an 18 to 24 months. Some of these will go out as long as 36 months from now and some of them are well under way and will be completed much sooner. So the Belleli is probably on average as an 18-month runout, some longer, some shorter. I think you could look at production and processing is sort of 9 and Belleli is 18.

  • Kevin Pollard - Analyst

  • Okay. If I, if I switch over to your CapEx guidance still around 350 at the midpoint for the year, which is , quite a bit higher than the run rate you've had in the first half, what's the reason for that ramping in the second half? Is that some of the eastern hemisphere projects that you had

  • Lee Beckelman - VP/CFO

  • Yes, we've got some international projects that we're investing in, in Latin America, a little bit in the eastern hemisphere that we would ramp up in the second half of the year, potentially if the timing keeps going the way they are timed today.

  • Kevin Pollard - Analyst

  • Okay, and last question, with regard to the eastern hemisphere jobs that you had mentioned starting in '08, can you give us a feel for the size of those, say, relative to some of your Latin America projects?

  • John Jackson - President, CEO

  • The size of the ones that we're quoting?

  • Kevin Pollard - Analyst

  • Well, the ones -- I think if I understood you correctly, you said you had won a couple of rental jobs--

  • John Jackson - President, CEO

  • -- coming on -- revenue size, I would say we're looking at probably 2.5 to $3.5 million of revenue a month once these projects come online. Is that about in the ball park?

  • Lee Beckelman - VP/CFO

  • Yes.

  • John Jackson - President, CEO

  • So 2.5 to $3.5 million a month revenue. So they're a good size for us.

  • Kevin Pollard - Analyst

  • In terms of the investment required, how does that compare with the 25 to $30 million that we typically see in Latin America?

  • John Jackson - President, CEO

  • Yes, I would say these, these are in the, I think when you add these two together, these two or three together, you'll be in the 25 or $30 million range in total, CapEx between the two.

  • Lee Beckelman - VP/CFO

  • Yes, most of the 2 main projects coming on in the year are Latin America projects, Kevin. We do have some compression, as John mentioned, and we do have another processing plant and rental project, both in the Middle East and Oman that will come on in the first half of next year with a lot of capital being spent in the second half of this year.

  • Kevin Pollard - Analyst

  • Okay, thanks, guys. Appreciate it.

  • Lee Beckelman - VP/CFO

  • Thanks.

  • Operator

  • And that does conclude our question and answer session today. At this time I would like to turn the call back over to Mr. Jackson for closing comments.

  • John Jackson - President, CEO

  • We thank you all for joining us, and we look forward to hearing you all on the Exterran call this fall in September, subject to shareholders voting to approve that. Thanks.

  • Lee Beckelman - VP/CFO

  • Thanks.

  • Operator

  • This does conclude today's conference call. We appreciate your participation. You may disconnect at this time.