Operator
Good day, everyone, and welcome to the American Superconductor first quarter fiscal 2007 conference call. All participants will be in a listen-only mode until we've reached the question-and-answer session. Just a reminder, today's call is being recorded. With us on the call are American Superconductor's Chairman and Chief Executive Officer, Greg Yurek; Vice President and Chief Financial Officer Tom Rosa; and Investor Relations Manager Jason Fredette. And now for opening remarks, I'd like to turn the conference over to Mr. Greg Yurek. Please go ahead, sir.
- Chairman, CEO
Thank you, April. Good morning to everyone. We're very pleased with the progress that American Superconductor made in the first quarter and we're looking forward to providing with you an update. First, I'm going to ask Jason to read our Safe Harbor statement. Jason?
- Manager, Investor Relations
Thanks very much, Greg. I would like to point out that certain remarks we make this morning regarding our financial forecast and other beliefs, plans and expectations constitute forward-looking statements. There are a number of risks and uncertainties that may cause actual results to differ significantly from these statements. Please refer to our 10-K which was filed with the SEC on the 14th of June for information about these risks and uncertainties. This filing can be accessed from the investor section of our web site at AMsuper.com. Now, Tom Rosa will begin our discussion for the quarter. Tom?
- CFO
Thank you, Jason. And good morning, everyone. It is good to be speaking with you again. As we announced in the earnings report we released this morning, AMSC performed solidly in the first quarter. We're tracking well on our financial guidance. Order activity is solid. Backlog is up and our balance sheet remains strong.
Looking at our top line results, revenue for the first quarter came in at $14 million. This is up 15% from the $12.2 million of revenues we recognized in the first quarter of fiscal '06 driven by higher revenues in SuperMachines. On a business unit by business unit basis, AMSC Wires generated $1.3 million of revenue, which is down from $2.9 million in the year ago quarter. This year-over-year decline is primarily the result of a $900,000 decrease in revenue on the Long Island Power Authority cable project being funded by the Department of Energy.
Due to a limitation on contract funding in effect at the end of Q1, we recorded $1.2 million of LIPA program costs into inventory as of June 30, 2006, instead of as revenue. We expect this funding limitation from DOE to be resolved upon the start of the next government fiscal year on October 1, 2006.
HTS wire sales were also down by approximately $500,000 relating to our transition from first generation to second generation wire which we announced in May. We are currently in the process of installing, testing and qualifying capital equipment for our lower cost 2G wire called 344 Superconductors. Sales of 344 Superconductors will be constrained by manufacturing capacity until December of '07. As of June 30, we had more than 400,000 meters of 1G wire left in inventory to meet near-term customer needs for HTS wire.
SuperMachines generated $9.2 million in Q1 revenue. This is up approximately 54% from $6 million in the year ago quarter. This increase is primarily due to the $13.3 million contract amendment that was signed with the Office of Naval Research back in April. This amendment fully funded the $36.5 megawatt motor program and allowed us to recognize revenue on $3.1 million of deferred program cost which we had inventoried as of March 31, '06 due to a funding limitation in effect at that time.
We continue to build strong momentum in our Power Electronics System business unit. Power Electronics Systems generated $3.5 million in Q1 revenues. This is up approximately 8% from $3.3 million in the year ago quarter. But Power Electronics Systems posted a record quarter from an orders perspective booking over $12 million in new orders which will significantly increase its revenue contribution in the quarters ahead. As a result of this order progress, we have increased our full year revenue forecast for Power Electronics Systems from 35% to 50% growth year-over-year, or an increase from $15 million in revenues last year to about $22.5 million in revenues this fiscal year.
For AMSC as a whole, full year consolidated revenues are forecast to be approximately $51 million, or about the same level of revenues as we generated in fiscal '06. Higher revenues of Power Electronics Systems are expected to be mostly offset by lower revenues at SuperMachines and AMSC Wires, as we drive two major government contracts to conclusion in fiscal '07. New government contracts that we believe we will win by the end of this fiscal year will not contribute significantly, if at all, to our top line in fiscal '07.
AMSC received approximately $28.2 million in new orders and contracts during the first quarter of fiscal '07. Of this total, approximately 10% came from AMSC Wires, 47% from SuperMachines, and 43% from Power Electronics Systems. Backlog as of June 30 stood at $37.1 million. This is up 56% from $23.8 million of backlog as of March 31, 2006, again, due in large part to the strength of our Power Electronics System business and to the $13.3 million contract we signed with the Navy in April for the completion of the 36.5-megawatt motor.
AMSC incurred approximately $800,000 of stock-based compensation expense in the first quarter. This is the first time we've expensed stock options on our P&L in accordance with the rules of FAS 123(R.) In the prior year quarter, we incurred $100,000 of stock-based compensation expense associated with restricted stock only. As we forecasted in our last earnings call, we estimate that we will book between $2.5 million and $3.5 million in stock option and restricted stock expense in fiscal '07, most of which was not included in past years' expenses. Again, this was driven by our adoption of FAS 123(R) as of April 1, 2006.
Our operating loss for the first quarter of fiscal '07 was $7.4 million. This compares with an operating loss of $6.3 million for the first quarter of the prior year. In addition to the impact of higher stock-based compensation cost in Q1, the operating loss was also affected this quarter by the conversion of the 36.5-megawatt motor program from a cost-plus incentive fee contract to a firm fixed price. We experienced higher than anticipated cost from one subcontractor in Q1 which rolled through our bottom line but which is not expected to recur.
For the first quarter, the Company reported a net loss of $6.7 million, or $0.20 per share. This compares with a net loss of $5.6 million, or $0.17 per share for the first quarter of fiscal '06. As we forecasted at the beginning of fiscal '07, we expect that our net loss for fiscal '07 will be in the range of $23 million to $27 million, or $0.68 to $0.79 per share.
On the balance sheet, AMSC had no debt and $55.4 million in cash, cash equivalents and investments as of June 30, 2006. This compares with $65.7 million as of March 31, 2006. Our cash burn in Q1 was $10.3 million but we expect that burn rate to improve significantly in the second half of fiscal '07. Cash flow was impacted in Q1 by planned 2G capital expenditures and delayed payments from the Navy as we converted that contract from cost-based billings to milestone billings. This caused our accounts receivable balance to increase from $9 million at year end to approximately $16 million as of June 30.
We continue to expect our cash burn to average between $6 million and $7 million per quarter over the course of fiscal '07 and we remain firmly on track to exit the year with at least $38 million in cash, cash equivalents and marketable securities, which is what we forecasted at the beginning of our fiscal year.
Also, as previously forecasted, we expect capital expenditures from fiscal '07 to be in the range of $12.5 million to $14.5 million, almost all of which is for planned full-scale manufacturing equipment for production of 344 Superconductors. And now let me turn the call back over to Greg.
- Chairman, CEO
Thanks, Tom. As I mentioned at the outset, we had a very exciting and eventful first quarter. We'll walk you through some of the more major accomplishments, and then lay out our plan for the remainder of the year. Let's begin our discussion with our AMSC Wires business unit, and touch first on Superconductor power cable.
August 2 was really a day to remember for high temperature Superconductor power cables and HTS technology in general. On that day, we participated in a ground breaking ceremony with the Long Island Power Authority for the world's first Superconductor power transmission cable installed in a commercial power grid. AMSC is the prime contractor for this half-mile long cable system which is being manufactured by Nexon Cable Company utilizing AMSC's first generation HTS wire. It will be operated at 138,000 volts and will carry more power than all previous and current HTS cable demonstrations combined.
This electricity pipeline will have the capability to flow 600 megawatts of electrical power, enough juice to power 300,000 homes, a result that is three times the amount of power that could be carried in the same corridor by cables that utilize copper wire. We expect to have the cable installed in the ground by early 2007 and begin flowing power through it by March 31, 2007.
Also on August 2, an HTS power distribution cable [netted] a cable operating at lower voltages went live in Albany, New York, in a power grid operate by Niagara Mohawk, which is part of National Grid. This cable was manufactured by Sumitomo Electric using first generation HTS wire that they manufactured in Japan. These two HTS cable projects will be followed in September by the start-up of another HTS power distribution cable system in a substation operated by American Electric Power in Columbus, Ohio.
This Columbus, Ohio cable has been manufactured by a joint venture of Southwire Cable, a company here in the United States, and NKT Cables in Germany utilizing first generation wire manufactured by AMSC. The cable is a unique triaxial design that we believe is the cable architecture of choice for solving power distribution problems, such as those experience in the borough of Queens, New York, in recent weeks.
The three U.S.-based HTS cable projects currently underway are being mirrored by seven other HTS cable projects going on today in other parts of the world including China, Korea, Japan, and Mexico. Of the 10 ongoing HTS power cable projects, 60% of them utilize AMSC's world-leading HTS wire. The balance, with the exception of one of the Chinese cable projects, utilizes first generation wire manufactured by Sumitomo Electric Industries.
The U.S. projects come at an auspicious time. The great blackout of August 2003, in the northeast of the United States has been followed this summer by many smaller blackouts from California to New York. These recent blackouts serve notice that we have not solved the power gridlock problems in the United States. They also serve as a very blunt reminder that the demand for electricity to run our digital economy continues to grow.
Today, there are more plug-in hybrid electric vehicles, personal computers, iPods, air conditioning systems than ever before. It is clear that we need new electricity solutions to ensure the power grid is prepared to meet the needs of our growing electricity-based economy. We need a grid that is not shut down every time there is a hot spell in the weather. The Energy Policy Act of 2005, signed one year ago this very day, was designed to start addressing these challenges.
While I'm personally unhappy about how long it took for the Energy Policy Act to become law and even unhappier about how long it is taking to implement the components of this law, progress is being made. I'm delighted to report that the U.S. Department of Energy is taking action with respect to superconductor-based solutions dictated by the Energy Policy Act and that the DOE plans to issue a solicitation for proposals this month for HTS grid solutions.
The focus, we have learned, will be on electricity solutions based on HTS power cables and HTS grid level surge protectors called fault current limiters. You can count on AMSC to aggressively pursue contracts from the DOE for these applications, and indeed, our success in being selected by the DOE for a major HTS power cable project means we'll have achieved one of our key corporate benchmarks for fiscal 2007.
To be specific, projects that are won by AMSC under the solicitation from the Department of Energy will all utilize 344 Superconductors to brand name for our second generation, or 2G HTS wire.
Now, as many of you know, the first quarter marked a major turning point in the evolution of American Superconductor's HTS wire. June 30 was the last day that we produced our first generation HTS wire. As of June 30, we had built an inventory of more than 400,000 meters of 1G HTS wire. We expect to sell that wire to meet the needs of customers during the complete migration from 1G wires to 344 Superconductors. But from now on, our exclusive focus in HTS wire, R&D, and manufacturing is on 344 Superconductors. We now have orders in hand for 9,960 meters of 344 Superconductors to be delivered to customers in fiscal 2007. So, we're in great shape to achieve another key objective which is to sell 10,000 meters of 344 Superconductors to customers this fiscal year.
There's plenty of demand for 344 Superconductors. However, we plan to ship only 10,000 meters of the 30,000 meters we expect to produce this fiscal year with the extra 20,000 meters being devoted to internal development and testing to find new and better ways to push the performance envelope for 344 Superconductors. After all, customers who buy Superconductor wire pay for electrical performance. So our continuing success in the market place depends on our ability to remain the performance leader for HTS wire sales worldwide. Our hard work is paying off.
Based on our disciplined systematic approach to increasing electrical performance and scaling-up manufacture of 344 Superconductors, we achieved a major breakthrough in electricity with this wire. Two weeks ago, at a Department of Energy meeting, we announced we achieved commercial grade electrical performance for the first time in long lengths of 344 Superconductors made by our proprietary low-cost manufacturing process. With the 140-Ampere performance we announced a couple of weeks ago, we have now exceeded the commercial threshold level of 120 Amperes of electrical current, which is an enormous leap forward for HTS wires with industry-standard dimensions.
However, based on the breakthrough we have achieved we now have our sights set on electrical performance levels of 200 Amperes and even 300 Amperes. We already have proof of 200-Ampere performance in laboratory samples so that the 200-Ampere goal is an obtainable goal for the not-too-distant future. 200 Amperes is important because this is the next commercial threshold, the threshold we need to pass for broad market acceptance of HTS technology.
Achieving these higher performance levels will extend our competitive lead and ensure broad adoption of HTS technology in the years ahead. All of this is backed up by our patent portfolio for second generation HTS technology which is the deepest and broadest patent portfolio in the world.
Now, let's speak for a moment about our manufacturing scale-up efforts for 344 Superconductors. In a nutshell, it is going very well, indeed. For the first quarter, we were to have sent you all of the equipment needed for the initial step of our ramp-up which will take us to 720,000 meters of annual production in December 2007. As of now, we have 40% of all of the equipment for the December 2007 production levels installed, commissioned, and qualified in the manufacturing process.
During the next few quarters, we'll install more equipment and we certainly expect to achieve our key corporate benchmark of having 70% of all equipment installed, commissioned, and qualified by the end of our fiscal year. Given the tremendous results we've achieved with our pre-pilot manufacturing operation, including bringing new equipment on-line and achieving electrical performance levels well ahead of our expectations, means we are ahead of schedule in the manufacturing ramp-up of 344 Superconductors.
Now, let's move on to SuperMachines. In Q1, this business unit continued to work on two projects that are very important to American Superconductor's future. The first of these is the 36.5-megawatt HTS motor for the U.S. Navy's new DDG 1000 class of destroyers previously known as DD(X), and for additional classes of ships such as the CGX class of cruisers and future aircraft carriers and submarines.
We expect all major components, including the stater and rotor of this HTS demonstration motor to be out of the Northrop Grumman assembly and test facility in Philadelphia later this month. We also expect the motor to be fully assembled and to be either through or near completion of factory testing at the end of September. For the motor aficionados on the call, this means we expect to be at or near completion of IEEE 115 factory testing by the end of September.
We'll then deliver the motor to the U.S. Navy at their Philadelphia naval shipyards. We're very confident this first in the world superconductor ship propulsion motor will meet the rigorous standards the Navy has set forth. We believe this success is key to adoption of HTS ship propulsion motors and generators by the U.S. Navy, and other navies around the world as well as commercial ship owners and operators. We'll certainly keep you informed of progress of this very important corporate benchmark.
SuperMachines is also manufacturing the world's first two commercial HTS products, our SuperVAR synchronous condensers. The customer for this first commercial HTS grid reliability solution is the Tennessee Valley Authority which plans to use these systems to solve grid instability problems at an aluminum mill in Tennessee. Manufacturing of these first two commercial SuperVAR systems continued to track well in Q1 and we remain firmly on schedule to deliver the first of the two in December 2006 and the second in March 2007.
And now, let's turn to Power Electronic Systems. While our other two business units are setting the stage for near-term growth, Power Electronics System is growing strongly right now. And they're doing so at a remarkable rate. As our longer term investors know, this business unit offers a broad array of solutions that regulate voltage in power grids, which allows them to maximize power flow and transmission lines, provide ultra clean power to industrial sites and meet grid inter-connection standards for wind farms and other sources of renewable energy.
Q1 was a record quarter for Power Electronic Systems. During the quarter, this business unit generated over $12 million in new orders, an all-time high for Power Electronics Systems, and our sales came from a broad mix of markets. For instance, a major multinational semiconductor manufacturer ordered one of our Power Quality-Industrial Voltage Restorer systems, or PQ-IVRs, for use in one of their new nanned chip manufacturing facilities.
We also gained several new wind power and utility customers in Q1. And we received additional orders in July from wind farms which enable us to raise our growth forecast for Power Electronic Systems yet again. Previously, we revised our revenue growth upwards from 25% to 35% year-over-year. Today, we're revising our growth upwards to 50% revenue growth year-over-year. Demand for AMSC's Power Electronics solutions for wind farms has been a key component of our revenue growth in this business, and we expect that to continue. In fact, we continue to expect to double the amount of wind generated electricity served by AMSC's Power Electronics products to 2 billion watts of zero emission electricity by the end of our fiscal year, which means we'll achieve yet another of our key corporate benchmarks this year.
In addition to the wind energy market, we believe Power Electronic Systems will book an increasing number of orders from electric utilities to enhance power grid throughput and reliability, and we believe these orders will be a key additional contributor to our revenue growth in our next fiscal year. This belief is based on the amount of substantial utility business we're currently bidding on today for our DVC, or Dynamic VAR compensator, solutions.
Power Electronics Systems is doing really well and we expect this unit to achieve solid profitability for fiscal 2007 and moving forward. As for the rest of our benchmarks, we're right on track with them, as well. These key corporate benchmarks, which were first laid out in our February 2006 earnings call, are provided at the end of our earnings press release.
I won't go through the rest of these benchmarks now. We would be happy to take any questions you may have about them. And now, April, we'll open up the call for questions for those who are on the line.
Operator
Thank you, gentlemen. [OPERATOR INSTRUCTIONS] We'll pause for just a moment. Our first question will come from Walter Nasdeo with Ardour Capital.
- Analyst
Good morning.
- Chairman, CEO
Hi, Walter.
- Analyst
I would like to real briefly talk about what the capacity and the expectation for the build-out going forward and what type of capital expenditures you're looking at and if the cash on hand will get you where you need to be on the wire side. So, I know you touched on it. Can you go into a little bit more detail?
- Chairman, CEO
We're, obviously, ramping up in terms of capital expenditures this fiscal year, on plan. Tom mentioned, again, the $12.5 million to $14.5 million in cash we expect to lay out for the full-scale equipment for 344 Superconductors. We expect that -- the cash burn associated with those capital expenditures to go down significantly in the next fiscal year because most of that equipment will be in place.
That gets us to our December 2007 production capacity of 720,000 meters per year. Our next big step, Walter, is in 2009 to 2.7 million meters per year. We have the cash in the bank to allow us to make that expansion, as well, and even to go beyond that. So, we're in good shape vis-a-vis cash needs for building out 344 Superconductor production in the next two to three years for sure.
- Analyst
Okay. And as that build-out expands, are there going to be efficiencies in the process that will let you remain within the building that you have, or are you going to have to expand the building to increase the capacity?
- Chairman, CEO
We said before, one of the key advantages of the migration from first generation wire over to 344 Superconductors is the facility we have would have accommodated about 20 million meters of 1G wire production annually. Quite a bit in that facility. 344 Superconductors in that very same facility would allow us to get upwards of 60 million -- 6-0 million meters of 344 Superconductors per year, so there's plenty of room for expansion there. Again, it is a modular process.
We're breaking bottlenecks as we go forward by just putting in the next module, where we have a bottleneck. As we reported previously, you asked about efficiencies, even within this capacity, that we have there, we've already achieved some of those efficiencies.
That took us from 300,000 meters per year of production capacity, December '07, up to 720,000 meters per year at about the same capital expenditures. We're continuing to push the envelope and achieve additional efficiencies going forward. We'll see more of that.
- Analyst
Okay, listen, thank you very much.
- Chairman, CEO
Sure.
Operator
Our next question will come from Jim Ricchiuti with Needham and Company.
- Analyst
Yes. Good morning. Greg, I wonder if you would be willing to size the order you were alluding to from the Department of Energy. I assume that's also one of the big government contracts you mentioned. Could you elaborate on some of the other ones that might be out there and awarded by the end of the fiscal year?
- Chairman, CEO
Right. Well, certainly, the Department of Energy is coming out with a solicitation. Could be as soon as a couple of days from now from all reports we've heard. They're very much in tune now based on the law, Energy Policy Act of 2005, to really drive across the threshold with commercial Superconductor cables. So, you know, I would be looking here, Jim, for just to put it in certain terms, look at a cable system that might be something like five miles in length.
Five circuit miles of cable, remember, 400,000 meters of wire required per circuit mile, so five miles, five circuit miles, that's about two million meters of 344 Superconductors. So in those terms I think we would all agree that's a quite substantial contract for us to achieve. It will drive top line for us to be sure but it will also put the pull on our 344 Superconductor production capability. We'll be able to meet that need with the plan we're executing on now. That's one of them.
We think there's a real opportunity here. DOE is driving for these fault current limiters, surge protectors. Our partnership with Siemens continues to go very well. You would expect us to go after such a contract from the Department of Energy, which we, again, think would be a substantial contract.
On the Navy side, one of our key corporate benchmarks for this year is to receive the first in a series of new contracts that will be for the design, development, and ultimately manufacture of a militarized 36.5-megawatt motor. We think it is very likely we'll have that first in the series of contracts by September 30 of this year.
So, those are the kinds of contracts, Jim, that we see coming on board here through the remainder of this fiscal year. Again, a little bit too late to impact the top line for this year, but this really builds the backlog for the next year and beyond.
- Analyst
And if you were awarded these contracts, you would see the revenue contribution in, by the second half of next fiscal year or perhaps sooner?
- Chairman, CEO
No. This would be in the first half, Jim, I would expect, for example, the Department of Energy is saying the following. They're saying they're coming out with their solicitation. They're saying you have 75 days to respond to it. They say they're going to make decisions by the end of December. Let's say they make decisions by the end of January or February, we're looking at a start that's near the end of our fiscal year, certainly by April 1. We did see that right in the first half of our fiscal year.
- Analyst
Perfect. Thank you.
- Chairman, CEO
Sure.
Operator
[OPERATOR INSTRUCTIONS] and our next question will come from Stuart Bush from RBC Capital Markets.
- Analyst
Hi, good morning.
- Chairman, CEO
Good morning, Stuart.
- Analyst
Great quarter, guys. I wanted to dig in a little bit into this opportunity you see with the wind farms. Are you seeing a variety across geographies and maybe you can just help quantify, for me, how many D-VARs might be used in an excised wind farm and whether that's going out in just new builds or in retrofitted?
- Chairman, CEO
Let me answer that last one with an answer we've given before on that. It is a very rough answer because it always depends. It depends on the grid that you're interconnecting to, and so forth. But roughly speaking, it looks like one 8-megavar D-VAR system for about 60 megawatts of wind farm. We have a number of examples where that's been the case. So, I'll use that as a measure here.
In terms of geography, we have product installed in China right now. We're shipping product over there. Remember, 170 wind turbines going into China with our power modules inside. We have orders for D-VAR in Australia which has introduced grid interconnection standards in January. We have the U.K.,with very strict grid interconnection standards.
We're serving probably just about every wind farm in Canada which was probably the first country, province-by-province, to establish grid interconnection standards. We're look forward to Spain. Spain should be coming through relatively soon with the grid interconnection standards. We're poised to, in fact, see sales ramp up to meet the needs in Spain. They know very well about our solution.
In fact, our solution throughout the wind industry is quite well-known. If you're going to have to meet grid interconnection standards, you call American Superconductor. New Zealand, by the way, is also now established, grid interconnection standards, so look for us to get our first order from New Zealand soon.
- Analyst
So are you saying you don't have any competition for the, in the wind farms meeting these grid interconnection standards?
- Chairman, CEO
We're in very good shape because, again, if you have a country with grid interconnection standards, and depending, again, on where in the grid you're putting it and so forth and so on, you're going to have to have some way to interface with that grid and we provide the best solution. I know that sounds like I have a bias here and I do, but in fact, we're getting most of those orders where you have to meet grid interconnection standards.
- Analyst
Okay, great. I just want to switch over to the SuperVAR. Have you seen any progress in interest beyond the TVA applications?
- Chairman, CEO
Yes, absolutely. We've been doing studies, we have bids out now -- quotes I should say, for SuperVAR orders. We expect, it is one of our benchmarks for the year to close or follow-on, the first follow-on order to be on TVA by the end of our current fiscal year. In fact, I think I can say this, just this morning an e-mail came in from a customer who that wants to follow-up. Yes. There is activity there all the way from an interested customer with an e-mail this morning through quotes already out the door. We think we'll have a follow-on order by the end of the fiscal year.
- Analyst
Okay. Just one last technical question. When you make progress in the R&D labs increasing the Amperes on the second generation wire, does that impact at all the manufacturing steps that you guys are putting in?
- Chairman, CEO
Affect the manufacturing steps? With this electricity breakthrough that we announced a couple of weeks ago, you know, we affected one part of the manufacturing step by putting in -- the engineers hate when I say this, but when we put in some Foo-Foo dust into the mix there and change the composition, this is a slight amount of additional material we throw into the mix and it creates nano dots throughout a particular layer, but these are such minor changes, Stuart, that you know, we just keep moving forward.
By the way, in order to accommodate those kinds of tests, you're going to try something out. You don't know if it is going to work. You have plenty of evidence evidence from the laboratory that says it will, that's why out of this year's 30,000 meters of production we're only committed to shipping 10,000 meters to customers; 20,000 meters is used to improve, make better the performance of these wires.
As we go more into production mode, we're going to, of course, have very strict controls on who can change what on the floor. Everything we're doing is compatible with our manufacturing process. Don't forget it took us 11 years to get to this point. We've got it set up for expansion and growth.
- Analyst
Great. Thanks a lot, guys.
Operator
Our next question will come from Bill Benton with William Blair.
- Analyst
Good morning, guys.
- Chairman, CEO
Hi, Bill.
- Analyst
Greg, maybe you can just expand in terms of your announcement there a couple weeks ago in terms of the breakthrough there, in terms of the kind of applications you expect from the 344 wire that meet kind of cost performance specifications of the end markets that we should maybe look for over the next couple of years or so?
- Chairman, CEO
Sure, Bill. Let me put the performance level in context. I said in my remarks, 140 Amperes in industry standard dimensions. When I say that, 344 Superconductors have the same dimensions as the 1G wire we've been selling all around the world. 120 Amperes is the commercial threshold. 140 is clearly above that commercial threshold. Put that in further context. The wire that we've shipped, 155,000 meters to Nexon's for the LIPA, the Long Island Power Authority cable project, is about 135 Amperes performance, so it is higher performance than what's going in the commercial grid on Long Island.
It's also higher performance than the wire that's in the rotor right now for the 36.5-megawatt motor. That's also about 135 Amperes of performance. So, it is truly commercial grade. The same thing applies, by the way, for the SuperVAR synchronous condenser. We're shipping the first commercial one in December of this year. So, commercial grade is there.
And in terms of a specific application, let me take power cables. If I look at, you know, the price that you can sell 344 Superconductors at into that marketplace, what we're going to have to compete against is copper, and, you know, copper is helping us out these days, of course. They're more than doubling the price of copper over the last year or so. You take today's $3.50 a pound, the price performance ratio of our Superconductor, 344 Superconductors would be in the area of $43 to $51 per kilowatt meter to be very specific. We track this in great detail, as you can imagine.
That's right in the sweet spot of power cables. So, at that point, we are equivalent to the price performance ratio of copper and we're selling this for 30% plus gross margins. I expect, you know, that's what we're going to be doing here by the end of the decade. Just a few years away when we say end of the decade. That would be one key example.
- Analyst
Okay. Right now you're selling that for around, closer to $70?
- Chairman, CEO
Yes, we are selling that now, ASP, $70 per meter, as we get to full production and we're shipping this out the door to customers in, let's say 2009, 2010 time frame. Look for that to be on the order of $9 per meter, our cost will be less than that. We'll be making a profit on that wire.
- Analyst
Okay. And then in terms of the yields, how should we think about yields maybe impacting some of this going forward? I don't know where your yields are at currently and where you expect those to go over time here, if there's any significant improvements you would expect there?
- Chairman, CEO
Yes. Again, it is a hard question to give a definitive answer on at this stage since we're in this scale-up mode right now, but the yields are actually quite good. I won't quote a number for competitive reasons here, but they're quite good, and I'll tell you Angelo Santamaria , VP and general manager of AMSC Wires, is jumping up and down with excitement. This looks like it is going to be a very high yield process. So, I don't think we're going to have problems there as we go forward.
- Analyst
Okay.
- Chairman, CEO
It's inherently a high yield kind of process.
- Analyst
Okay. And then in terms of, I think these are both interrelated, this cost-plus, to firm fixed price contract, obviously, if you look kind of year-over-year at the revenue versus the operating numbers for SuperVAR and you talked about the accounts receivable going up sequentially, there, those are, obviously, interrelated to this cost-plus to firm fix. If you can provide more insight on what exactly happened there and kind of some of the thinking behind that, that would be real helpful?
- Chairman, CEO
Sure. I'll let Tom take that question. Tom?
- CFO
Sure, Bill. When the contract was converted from cost-plus to fixed price back in April, which was with our concurrence and blessing, the terms of the contract changed such that instead of us being able to bill on the basis of cost incurred by month, we're now billing on a milestone basis.
The timing of those milestone payments is such -- they're more heavily weighted toward the second half of our fiscal year than the first. So, we're continuing to book revenue as we continue to make progress on this program. But because the milestone payments are weighted toward the second half of the year, our receivable balance is building.
And the other thing that you mentioned, Bill, or asked about in regards to SuperMachines' situation is when we converted this program from cost-plus to fixed price, any cost overruns basically flow right to the bottom line, and what happened in Q1 is one of our subcontractors, as I mentioned, ran into some cost overruns, some problems. That caused the bottom line for SuperMachines to be about $1 million worse this fiscal year than it was in the first quarter of the prior fiscal year.
We think those problems are now behind us. We don't expect them to recur and we think going forward that program will still be very profitable to us.
- Analyst
Okay, and you think that was about $1 million this quarter that you kind of worked through?
- CFO
Yes, if you look at our $1.1 million loss this quarter versus the prior year, it is about a $1 million impact, yes.
- Analyst
Okay. Is the deferred revenue, the sequential move in the deferred revenue, which was up nicely sequentially there, is that also reflected there?
- CFO
That's tied more to the Power Electronics Systems business unit which we booked approximately $12 million of new orders in the quarter for that business unit which was a record. And a lot of those contracts carry with them down payments. So, as we bill those down payments, some of which won't be paid until Q2, we, the deferred balance going up directly as a result of the PES orders.
- Analyst
Okay. Thanks a lot.
- CFO
Thank you.
Operator
[OPERATOR INSTRUCTIONS] We'll now hear from Robert Smith from the Center for Performance Investing.
- Analyst
Hi. Good morning.
- Chairman, CEO
Hi, Bob.
- Analyst
Greg, could you just go over the 344 wire landscape again, as far as amps go because I'm a little unclear. I have a lot of numbers written down and one of your comments, you said something about going to 200 amps to really open up the market substantially which I wasn't clear about.
- Chairman, CEO
Sure. So, you know, these wires, these Superconductor wires, 344 Superconductors included, of course, are really sold on the basis of performance. Why would you go to a Superconductor wire when you could use a copper wire? Well, because our wires that we make every day carry more than 150 times the electrical current of a copper wire of the same dimensions. That allows you to shrink down big ship propulsion motors and take out cost, take out weight. It allows you to put five times more power through a right-of-way in Manhattan or Long Island, or any congested area of a city in the world. So, those are big advantages to be sure.
You want higher and higher electrical performance meaning higher and higher amperage or electrical current you can carry. By the way, to put it in perspective when we say commercial grade performance on 344 Superconductors that, 140 amps we talked about a couple of weeks ago, I mean one of those wires is enough to power 1,000 homes. So, a lot of different ways you can look at it but very, very impressive electrical performance.
We're not satisfied with that. It is good. It is not the commercial grade basically equivalent to the first generation wire we have today in inventory, but in fact, 200 amps has already been demonstrated in our laboratories. We're already transferring that technology, that capability on to the manufacturing floor. We're going to 200 Amperes. That will just put us much, much further ahead of any competition from around the world, in terms of providing what the customer wants.
They want more in a smaller package for lower cost. That's what we're doing with 344 Superconductors, and, by the way, we have our sights set on even 300 amps of performance. So why did that broaden and deepen the market, Bob? Part of your question, is because with that greater performance, we're coming down the price performance curve. We not only get equivalent to copper, we can literally go below the price performance ratio of copper and then, you know, you'll have much more rapid adoption, I believe of 344 Superconductors as we cross each one of those thresholds sequentially.
- Analyst
Thanks for that clarification. I have an additional question about the wind farms. If you look at the countries with grid interconnection standards in place now, what part of the market is that, would you say?
- Chairman, CEO
Oh, that's actually a pretty tiny fraction of the market. hat's one of the reasons we're so excited about the future, adding Spain on next means you have U.K. and Spain over in Europe, and you have to believe that the other European countries are going to be following on beyond that.
We're actually directly involved -- let me just say what it doesn't include. It does not include China, it does not include India, and both of those countries with very rapidly expanding economies are building out wind farms in dramatic ways, very fast growth. They will, I believe, establish, in fact, grid interconnection standards.
So, you know, with -- put another way, with about 15 billion watts of wind-generated electricity installed every year, certainly that's the number for this year, as we understand it. We're so far looking at only 10% to 15% penetration in terms of grid interconnection standards. So, we're expecting growth there. By the way, you wouldn't be surprised to know with our positive reputation there, we're actually helping countries establish their grid interconnection standards. A lot of growth left here.
- Analyst
And you have better than 50% market share in those countries that you do -- that do have these standards now?
- Chairman, CEO
Yes. To the extent in a country where you need to meet the grid interconnection standards. Not every wind farm, let's take the U.K., not every wind farm in the U.K. because of the nature of the farm or where it is inserted into the grid will -- doesn't necessarily need a D-VAR solution. So, for those cases in a country that has the standards, and you need an interconnection method like a D-VAR, we're way up there, over 80% for sure.
- Analyst
Thanks very much.
Operator
We'll now take a follow-up from Jim Ricchiuti.
- Analyst
Yes, should we assume that in the Wires business, that will be more back-end loaded this year, the revenue contribution?
- CFO
Yes, Jim. I would say yes. The primary reason is that the LIPA cable program is going to be -- we're not expecting to receive the balance of funding on the program until the second half of our fiscal year. Coincident with the beginning of the government's fiscal year on October 1, so on that basis, yes, we do expect the LIPA-related revenue within AMSC Wires to be second half loaded.
- Analyst
Okay. On the PES, more linear progression as you recognize the revenues and begin to ship off the backlog through the year?
- CFO
I think that will also be slightly, more heavily weighted toward the second half than the first.
- Chairman, CEO
The orders are in hand. We're manufacturing, assembly and testing, I should say, the product and shipping it out the door, but our plan is that it will be a bit more heavily loaded on the second half.
- Analyst
Okay. Okay. Thank you.
- Chairman, CEO
Sure.
Operator
Ladies and gentlemen, it appears there are no further questions. Mr. Yurek, I would like to turn the conference back to you for any additional or closing comments.
- Chairman, CEO
Thank you, April. I just want to thank everybody for participating and for those very good and detailed questions. I appreciate that and we look forward to seeing you on the next conference call a quarter from now. Thank you.
Operator
That will conclude today's conference. Thank you for joining us.