Operator
Good morning and welcome to American Superconductor's fiscal year 2004 third quarter conference call. With us today is Greg Yurek, President and CEO; and Kevin Bisson, Senior Vice President and CFO, of American Superconductor. I would like now like to turn the call over to Greg Yurek.
- President and CEO
Good morning. With me today is Kevin Bisson, our Chief Financial Officer; and also Dave Paratore, Senior Vice President and General Manager of AMSC Wires; and John Howe, our Vice President for Electric Industry Affairs. In our conference call today, I will provide a brief update on operation and key metrics; and then we'll open up the session to your questions. First, however, I would like to ask Kevin to provide the Safe Harbor guidance and to provide highlights on our third quarter and nine month financial results. Kevin?
- CFO
Thanks, Greg and good morning, everyone. Before we begin discussing financial results for the third fiscal quarter, and our outlook for the remainder of the fiscal year, let me provide the following guidance. In our attempt to share information with you to provide insight to help you understand our business plan, we may use statements containing our beliefs, plans, and expectations which constitute forward-looking statements. There are a number of factors and uncertainties that may cause actual results to differ significantly. Please also refer to our SEC filings and, in particular, management's discussion and analysis for more information on these factors and uncertainties.
Now, turning to our third quarter results, revenue for the third quarter was $12.3 million, which was 347% higher than revenue of $2.8 million in the third quarter of fiscal 2003. It should be noted that the $12.3 million in revenue for the quarter represented the highest quarterly revenue number in the company's history. Strong year-over-year revenue growth was driven primarily by our SuperMachines business unit, with continued progress in the 36.5 megawatt HTS motor program with the U. S. Navy; accounting for $7.2 million of that unit's revenue for the quarter. Revenue for the first nine months of fiscal 2004 amounted to $29.7 million, which was $19.6 million, or nearly three times higher, than revenue of $10.1 million for the first nine months of fiscal 2003. This significant nine month revenue growth relative to the prior year's first nine months was due principally from increased revenue from the 36.5 megawatt motor program at SuperMachines. In addition, this revenue increase is also attributable to a four fold increase in HTS wire product sales, with the opening of our Devens manufacturing facility one year ago; as well as revenue in connection with our power cable project for the Long Island Power Authority, begun in April of 2003.
Orders received during the third quarter amounted to $2.9 million, which was nearly five times the $600,000 of orders generated in the third quarter of fiscal 2003. Significant orders received during the quarter included a power electronic systems D-VAR order from Vision Quest Wind Electric, Canada's largest wind farm developer. An order for power electric modules from United Defense Industries for use in their U.S. Army contract for weapons systems, and a contract for test support services in connection with the U.S. Navy's test of our prototype 5 megawatt HTS motor, delivered to the Navy in July of 2003. Backlog as of December 31st, 2003 stood at $75.2 million, substantially ahead of backlog of $6.9 million at December 31st, 2002. Of the $75.2 million dollars of backlog, as of December 31st, 2003, approximately $10.6 million is expected to be recognized as revenue in the fourth quarter of this fiscal year. Also, we expect to recognize as revenue, just over $40 million of this backlog in the new fiscal year that starts about eight weeks from now. Orders for the first nine months of this fiscal year total $24.8 million, which was significantly higher than the $5.9 million of orders generated in the first nine months of fiscal 2003.
Driving the year-over-year order growth was increased orders growth for HTS Wire, as well as the awarding of the Long Island Power Authority power cable contract in April of this year. The operating loss for the third quarter of $6.6 million was $6.2 million, or 48% favorable, to the operating loss of $12.8 million in the third quarter of fiscal 2003. The smaller loss between periods was led by the third consecutive quarterly profit for the SuperMachines business unit, due to continued steady progress on the Navy motor contract. As well as a significant reduction in the losses generated by AMSC Wires, due to a combination of higher year-over-year product revenues; as well as lower R&D and SG&A expenses resulting primarily from headcount and other cost reduction actions taken earlier this year. As we discussed if our last quarterly earnings conference call, the company in July implemented approximately $5 million of reductions in it's operating and capital budgets for fiscal 2004. Primarily through the elimination of 34 positions, including a reduction in force of 23 employees, or 8% of the work force. Reductions were also made in controllable expenses.
Through the third quarter of this fiscal year the company is ahead of it's projected savings, and anticipates exceeding the $5 million target by $500,000 to $1 million by March 31st of 2004. The operating loss for the first nine months of fiscal 2004 was $21 million, which was $13.5 million or 39% favorable to the operating loss of $34.5 million for the first nine months of fiscal 2003. Similar to the third quarter, the smaller loss for the first nine months of fiscal 2004 compared to the comparable period last year, stems from the turn to profitability this fiscal year for SuperMachines as a result of the Navy motor contract, higher HTS wire shipments, and previously discussed reductions in the cost structure at AMSC wires; as well as LIPA related revenues at AMSC wires. Net loss for the quarter was $6.5 million, which was $6.1 million or 48% favorable to the net loss of $12.6 million in last year's third quarter. Net loss per share for the quarter was 25 cents per share, which was 35 cents per share favorable to the 60 cents per share loss generated in last year's third quarter. Net loss and net loss per share for the first nine months of fiscal 2004 was $22.2 million and 96 cents per share, respectively. Both amounts compare favorably to the net loss and net loss per share of $33.7 million and $1.63 per share, respectively, for the same period in fiscal 2003.
The company ended the third fiscal quarter with $56.9 million in cash, cash equivalents and long-term investments, which was $48.1 million higher than the $8.8 million balance at September 30th, 2003. The increase in cash during the quarter was due to the company's issuance of 5.7 million shares of it's common stock in October, which generated cash proceeds net of underwriting discounts of $51.1 million. Excluding the effect of the stock offering, the company's cash burn in the second quarter was $3 million, which was the lowest quarterly cash burn in the last 15 quarters. The net loss of $6.5 million for the quarter was offset primarily by $1.8 million in non-cash depreciation and amortization expense, as well as lower working capital of $1.8 million. As we discussed in our earnings press release earlier this morning, the company has decided not to recognize revenue for it's D-VAR product for turnkey wind farm applications on the percentage of completion basis, as had been the company's intention previously. Instead, it will recognize revenues for these products no earlier than at the time of customer acceptance per the guidelines prescribed by Staff Accounting Bulletin, or SAB, 101 issued by the SEC in December of 1999.
As a result of this conclusion approximately $1 million of revenue in connection with the partial assembly of two wind farm D-VAR orders that the company expected to record as revenue in the fiscal third quarter, was instead recorded as deferred revenue on the company's balance sheet, at December 31st, 2003. Furthermore, because final customer acceptance related to these two D-VAR orders, which the company expects to ship this quarter, is not expected to happen until the first half of fiscal 2005, the company projects that approximately $2.5 million of anticipated revenue for fiscal 2004 will now be recognized in fiscal 2005. Also, the company had previously anticipated utilizing percentage of completion accounting for additional forecasted orders expected in the fourth quarter, but it has concluded that recognizing revenue upon customer acceptance is the more appropriate accounting treatment for these projected orders as well. As a result the company now expects fiscal 2004 revenue to be in the range of $40 to $42 million. The company also anticipates it's net loss to be in the range of $27 to $29 million, or $1.12 to $1.20 per share.
Before I turn it back to Greg for his remarks I would like to remind everyone that, consistent with our prior earnings conference calls, during the question-and-answer portion of the call we request that you ask only one question at a time. If you have an immediate follow-up question to clarify our response, we'll be happy to answer that question as well. Other wise, we ask that you return to the queue if you have more than one question, in order to allow as many people as possible to participate in the question-and-answer session. Thanks, and I will turn it back to Greg.
- President and CEO
Thanks, Kevin. I would now like to provide some highlights for each of our businesses. Let me start with the power electronic systems business. This business is responsible for the development and sales of our power module and power electronic converters; and the assembly, test, and sales of our dynamic VAR, or D-VAR, integrated power electronic systems. This business is also now responsible for marketing and selling of our SuperVAR dynamic synchronous condensers, the first prototype of which is going through initial shakedown before being hooked into the power grid in Tennessee. It makes sense for the power electronics systems sales team to be responsible for SuperVAR machine sales because this product, when it moves beyond the prototype stage, will be a new tool in our tool box of solutions for transmission grid reliability and industrial power quality applications. While we're going through the initial testing and subsystem checkouts of our first prototype SuperVAR machine, we're also actively engaged with customers for whom SuperVAR would be the optimum dynamic reactive power solution. Once we get hooked into the TVA grid in Tennessee, and the prototype SuperVAR machine demonstrates that it can reliably perform as designed, we'll be working to close additional SuperVAR orders with those customers for whom we are currently doing transmission grid analysis.
Returning to D-VAR-based solutions, we note that the pattern for orders for D-VAR systems for grid stabilization appears to be replicating the cycle experienced last fiscal year. During last fiscal year, over half of the orders and revenues for D-VAR systems were achieved in the last fiscal quarter as customers bought equipment to be installed in time to address peak summer demand for electric power. The total amount of business we are currently bidding on has continued to increase over the last several months. At the last earnings call we commented that we were actively engaged in about $80 million worth of new business opportunities. Several changes are worth noting since that time. First, of the 30 plus customers we are dealing with, four have decided that they won't buy a product from anyone this year. They'll take their chances with respect to transmission grid reliability. That's four customers. At the same time, seven new customers have come on the scene, and we have provided them with quotations for D-VAR solutions. Also in this period of time, we have not lost one potential order to a competitor. Potential customers have simply delayed making buying decisions.
We're still optimistic that these utility customers will begin making buying decisions shortly, and as they make their final buying decisions in preparation for the coming summer demand; we believe our product offering puts us in a strong position to continue to win a significant proportion of the potential orders. It's also worth noting that the activity level with potential industrial customers has picked up over the last several months, presumably based on stronger economic conditions, which drives industrials to achieve higher productivity through higher quality of power serving their manufacturing plants. As a result we have recently responded to requests for quotes from five potential industrial customers.
Let me now turn to our SuperMachines business. This business is responsible for the development and manufacture of large superconductor rotating machines, which include ship propulsion motors and generators and dynamic synchronous condensers for grid reliability. During the third quarter, SuperMachines oversaw the installation of the first 5 megawatt HTS ship propulsion motor at the U.S. Navy's designated site for initial testing of this motor. That is at the center for advanced power systems, a Navy center of excellence for electric warship research and development, at Florida State University. Please remember that this motor had already undergone successful factory testing, and is now about to undergo additional testing under simulated ship propulsion conditions in Florida. I'm pleased to report that we received a contract in November 2003 from the Navy for about $638,000 to oversee the simulation test in Florida. This keeps us very much on the front lines with the Navy as we continue to work toward adoption of HTS motors and generators by the Navy for electric warships. I'm also pleased to report that the 5 megawatt motor has successfully passed initial start-up tests in Florida. The center there now has received all of the equipment they need for full tests, and that the motor is expected to start simulation tests this quarter, as planned.
For the next phase of testing the motor is expected to be shipped later this year, to the Navy shipyard in Philadelphia, for special additional testing. In the meantime, we are continuing to work very actively with the Navy to achieve our goal to insert a 5 megawatt class motor on a Navy vessel for at sea demonstrations in calendar 2005. We believe prospects are good for achieving this goal, and we plan to let you know about our progress in our next arranged conference call in mid-May. In parallel, we have been working with more and more potential customers for the first insertion of a 5 megawatt class HTS ship propulsion motor on a commercial ship. Our goal here is to identify an early adopter of HTS motors, and to close an order as soon as possible. Prospects for achieving this goal this calendar year seem very good because we are in advanced discussions with several ship owners and operators, ship builders, and ship propulsion integrators; and initiated discussions with a number of additional potential players over the last several months. We'll give you an update on our progress toward an order for a first HTS ship propulsion motor in mid-May.
In the meantime, progress under our contract with the U.S. Navy to design, build, and test a 36.5 megawatt HTS motor has been going very well. In December we successfully achieved a key milestone by passing the formal preliminary design review by the Navy with flying colors. In fact, because the Navy deemed the design to be highly practical, we were awarded an additional incentive payment of about $317,000 to be received from the Navy this month. By the way, we'll only recognize as revenue $90,000 of this incentive fee in the third fiscal quarter and we'll recognize the balance of $227,000 over the remainder of the contract, which ends in March of 2006. This means that we are carrying the $227,000 as deferred revenue on our balance sheet. Having passed the preliminary design review this quarter we have initiated the detail design, and started to build HTS test coils for the superconductor rotor; a key next step in demonstrating components for the 36.5 megawatt motor.
As we continue to build and test HTS motors, I'm happy to report that on January 14 we won a new contract from the U.S. Navy, which is called analysis of HTS systems benefits. This seven-month long, $476,000 study will focus on completing a detailed evaluation of the system benefits offered by HTS technology in marine propulsions system design. This will be accomplished by comparing the impact of different motor, generator and drive configuration options on the size, weight, efficiency and operational flexibility of the resultant ship installation. The results of this study will be directly applicable to commercial ships, as well as to electric warships. We expect that we will recognize about a quarter of this contract as revenue in the current fiscal quarter, so this will add another $300,000 or so to our starting backlog for fiscal 2005. The SuperMachines business is also responsible for the development, testing and future manufacture of SuperVAR dynamic synchronous condensers. SuperVAR machines are based on our HTS ship propulsion motor platform. As I mentioned earlier we are going through the initial shakedown phase of the SuperVAR prototype.
We expect to have the machine hooked into the power grid in western Tennessee in the spring, and will let you know how things are going at our next earnings conference call in May. Our hopes are high for SuperVAR machines because their grid stabilization capabilities are complimentary to our power electronics-based D-VAR product line, and because there is a very clear need for dynamic reactive power solutions for power grids around the world; an addressable market that is very, very big. Once we go through the testing of the prototype in Tennessee and the Tennessee Valley Authority signs off on the prototype and releases the five SuperVAR machines that it has already ordered from us for production, we believe we'll be in a strong position to close orders with other potential customers. Let me now conclude with some comments on the AMSC wires business. January 2004 marked the first anniversary of the start of HTS wire production at our wire manufacturing plant in Devens, Massachusetts. As we discussed previously, we have had our share of the expected start-up issues with any new plant, especially one with a brand new product. The good news is that the main issues have, by and large, been overcome and we are now utilizing the learning curve from the first year of operation to our advantage in producing long lengths of high performance HTS wire.
Speaking of high performance, one of the important results of this last year was that we achieved significantly higher electric current carrying capability of the wires produced in Devens compared with the wires produced in our previous pilot plan, which already held the world record for HTS wire performance. We continued to achieve additional increases in the electrical performance of our HTS wire, which is important in continuing to reduce the price performance ratio of our product. Based on the learning curve we have marched up over the last year, we are now in a position to produce wire at a rate that should enable us to manufacture and ship a record amount of wire in fiscal 2005. We expect to start our new fiscal year eight weeks from now with a record wire backlog of over 500,000 meters, all for delivery in fiscal 2005. We expect we'll add to that backlog as the year progresses, and we'll give you additional insight into our production goals in the May earnings conference call.
The last point I want to make about our HTS wire manufacturing plant, is that we have achieved significant productivity gains during first year of operation, which has enabled to us increase the gross capacity of wire production from 900,000 meters per year to 1.4 million meters per year without the addition of further capital equipment. Because of these productivity gains, the company expects over the next two years to cut in half the $4 million it originally anticipated spending on capital equipment to expand the capacity of the Devens wire plant for first generation HTS wire. The AMSC Wires business is also responsible for managing our HTS power cable project for Long Island Power Authority, or LIPA. This project is moving along quite well, and is on schedule for successful installation of the first HTS cable at transmission voltages in the grid by the end of calendar year 2005. The LIPA HTS power cable wire project is the highest rated industrial superconductor project within the Department of Energy; and thus it gets a lot of attention by policy and decision makers in Washington, which we believe is ultimately quite good for our company.
Before close, I want to comment briefly on progress on our second generation or 2g HTS wireless technology. First I can report to you that we have more than doubled the performance of our record breaking 2g wire of a year ago. This wire, which is being produced in our research and development facility in 10 meter lengths, is the beneficiary of our nanotech surface treatment; which, in fact, is a necessary condition for successful production of high quality, high performance 2g HTS wires by the processing methodology we have adopted. The nanotech surface treatment which produces a highly structured, self assembled layer, of sulfur atoms that is one atom thick has been introduced by us into our low cost continuous manufacturing process during the last two years; and the process is ready to move to scale up in the pilot manufacturing stage. In addition, we recently announced that we have successfully leveraged our metal organic liquid deposition process to produce a dispersion of nanodots of inorganic materials throughout the superconductor layer in our 2g wire.
The result of applying this proprietary process is that we got an immediate 30% increase in the electric current carrying capability of our 2g wires in magnet field environments typical of commercial applications. Laboratory studies show that at least a doubling of performance is achievable through the nanotechnology approach, and we believe we'll attain that doubling once we have optimized our nanodot processing technology. We expect to scale up the nanodot processing technology to 10 meter lengths of wire over the next couple of months in order to determine the proper conditions to be utilized in our upcoming 2g pilot manufacturing operation. The volume of wire we expect to produce in the 2g pilot plan is similar to the quantities of 1g wire we are currently producing today. Our plan continues to be to start ordering the equipment for the 2g pilot plan around the end of this calendar year, and to be in commercial volume production of 2g wire in three to four years; which is the plan we have been on for some time now.
In conclusion, we are on track to effectively double revenues year-over-year when we close the books on fiscal 2004 in about eight weeks. We have a solid backlog with just over $40 million to be recognized as revenue in fiscal 2005, so we have a strong platform for continued revenue growth in fiscal 2005. And we have a solid balance sheet, both in terms of our cash, cash equivalents and long-term investments; and in terms of having no long-term debt on the balance sheet. Finally we have continued to strengthen our lead in both our techonolgies and our advanced grid products, and we believe we are well positioned to continue to lead and grow in this industry. Thank you for your attention. I would now like to open up the session for your questions.
Operator
Thank you, sir. At this time if you would like to ask a question, please press the star and one on your touch-tone phone. Again, to ask a question, please press the star and one on your touch-tone phone. If your question has already been answered you may withdraw by pressing the pound key. One moment while I queue up our first question. The first question today comes from Jim Rashidi with Needham & Company, go ahead, sir.
- Analyst
Yes, good morning.
- President and CEO
Good morning, Jim.
- Analyst
Greg, a question on the power electronic systems business. As you go after this business, these opportunities, and you talked about the fact that some of your customers would like to get this equipment in place for the summer season. What's the window of opportunity like, you know, for them to make that buying decision for this summer?
- President and CEO
I don't want to let them know that they have a little extra time here on this conference call, Jim. But effectively we're talking about February, March, maybe through April. In order for us to turn something around, to be in place in June. So if I think of the start of the summer as June, it's in that kind of time frame. You know, obviously, we'll be happy to crank up on an order that comes in May as well. Just like last year it was a rush of orders that came in February and March, and we were able to turn them around and ship them out the door in March. At this point in time we'll probably be shipping most of that, or certainly recognizing revenue for most of that, in the next fiscal year.
- Analyst
Do you recall what the orders were in February and March?
- President and CEO
From last year?
- Analyst
Yeah.
- President and CEO
Yeah it was about $6.5 million worth. It was three from Northeast Utilities, it was one from an Illinois utility, Rayburn for two D-VAR down in Texas. I think that's the summary. They all came in a rush in February and March of last year. I guess the new thing is, don't count on any industrial orders in terms of numbers for in fiscal year. We have been very consistent about that in every earnings conference call. The big new thing for us here is that all of a sudden we've now quoted on five industrial opportunities here. That's brand new. I won't promise anything here, but we like that the industrials are now coming back on the scene.
- Analyst
And less seasonality associated with that.
- President and CEO
In fact, yes. The seasonality varies around the world. So -- but, again there's a lot of it driven by summertime here, some by springtime, a lot of lightning storms tends to get their attention in the spring. There's some incentive to turn things around pretty quickly.
- Analyst
Okay. Thanks. I will jump back in the queue.
- President and CEO
Thanks.
Operator
The next comes from Peter Patterson with Green Mountain Investments.
- Analyst
Good morning.
- President and CEO
Good morning.
- Analyst
Looking at the grid lock in Washington. I guess this is a question for John. If something comes out of the machinery, maybe from help from Hilary Clinton and a few other people, would this provide incentive for these fellows to make decisions.
- VP, Electric Industry Affairs
Well, just a general comment on the status of legislation. It--obviously as we have seen in the last few months, the energy bill proved to be highly controversial. Just this week there's a report out that Senator Demenichi intends to issue a new pared back version of energy legislation. He's not giving up on getting something passed. One comment, and that is that for all the controversy surrounding this bill, the energy -- the electricity portion --
- Analyst
Exactly.
- VP, Electric Industry Affairs
Has generally regarded as the least controversial. So I think it's likely to survive in tact and that electricity title does provide some important provisions, in terms of enforceable reliability standards and so forth. In addition what we have seen in the past four to six months is that the federal energy regulatory commission has become much more focused on grid reliability; and is intending to undertake some new measures to expand it's authority, or exert as much authority as it can within it's existing statutory framework. All of which, I believe, will lead to more of a focus on grid technology solutions.
- Analyst
And, John, would you agree that hopefully when this gets done, that it would open up the business spicket?
- CFO
I will comment on that, and the answer is, yes. And, again we haven't factored any of that into our near term revenues by any means; but clearly we provide upside potential. There's no doubt about that.
- Analyst
Thank you.
Operator
The next question today is from Walter Nasdeo with Ardour capital.
- President and CEO
Hi, Walter.
- Analyst
Can you give me a little clarity on the backlog of orders and contracts, of the $75.2 million? You're kind of expecting a little over $10.5 million in the fiscal fourth. Is the rest of that going to roll out in '05? Is that how you are planning that, and what type of margins overall are you looking at on those orders?
- CFO
No, I think we we said $10.6 million of that $75 million we expect to recognize as revenue in the fourth quarter.
- Analyst
Right.
- CFO
I think Greg alluded to the fact that of that $75 million, we're expecting a little over $40 million of that to be recognized as revenue in fiscal '05, again to his point of setting ourselves up nicely for year-over-year growth in '05. And then the remainder of that $75 million would be in fiscal '06.
- Analyst
Okay. In '06. What type of margins are you expecting on that? I know they are all over the board, but kind of like an average.
- CFO
I -- I would be hesitant to do that. I haven't done the mental math on that and I wouldn't want to dissuade you. I think to give you sort of a prospective on that, the bulk of the backlog is really tied into the 36.5 megawatt program, the LIPA project.
- Analyst
Okay.
- CFO
I think that should give you a prospective on the margins.
- Analyst
I can do that one myself. Thank you.
Operator
Your next question is from Eric Prouty with Adams Harkness & Hill. Please go ahead, sir.
- Analyst
Thank you. A question similar to Jim's question. What--for revenue recognition purposes, what would be the turn around time and, again, this would kind of be on average; or maybe you could go through some of the different products between receiving an order and when you would actually be able to start recognizing revenue on the different product lines that you have in general.
- President and CEO
Eric, this is Greg. Let me just take the first piece of that and I will throw it back to Kevin as we need to. Just to give you the first part of your question, the turn around time has varied from as long -- from as short as one month, literally we get an order in and turn it around in 30 days to as long as 12 months. So it depends on the nature of the product, whether it's custom turnkey operation or it's a standard D-VAR project that we almost in a sense take off the shelf. We have quite a range depending on the nature of the product being ordered. Maybe Kevin, you want to expand.
- CFO
In the case of the ones that we alluded to in our press release, as well as in my remarks, these are clearly of the nature that they are a minimum of six and possibly as high as nine months. They are turnkey installation, they are not of the variety that Greg alluded to where it's more standardized; but for the reasons we specified before, we feel we've provided the appropriate treatment going forward from the accounting perspective.
- Analyst
Sorry, I guess what I was trying to get at with that is, generally, obviously we know what the March quarter is going to look like. New orders probably are not going to impact the June quarter and probably would be more for delivery or for recognition in kind of the September, December of the '05 quarter?
- CFO
I think it depends on, generally speaking, the customer types. I think if we -- I think the quicker turn around times that Greg alluded to are more suited towards the utility customers. I think if we start speaking more along the lines of the wind farm customers, and the industrials that Greg talked about before, I think your comment earlier is accurate.
- Analyst
Great. I will jump back in the queue. Thanks, guys.
Operator
The next question today is from Jarett Carson with RBC. Go ahead, sir.
- Analyst
Good morning. Regarding the backlog on the -- on the wire production, how much of that is -- is with LIPA at this point and what -- and can you give us an update on any additional opportunities that we have possibly for 2004?
- CFO
Yeah, the LIPA wire amount is about 120,000 meters and that will be delivered in our coming fiscal year. So Jarrett, does that answer the first part of your question?
- Analyst
Right out of the 500.
- CFO
That's correct. Out of the 500 that's currently in backlog, and we -- obviously we believe we're going to be growing that backlog as we move forward here; but that's a good starting point for us for the new fiscal year. And I sure -- what was the rest of your question?
- Analyst
Any additional new opportunities for 2004?
- CFO
Yes, there's a lot more coming from the international scene now. And, you know, we talked about our first order from China last summer, and, you know, perhaps I ought to turn it over to Dave Paratore. Do you want could comment on that?
- General Manager, AMSC Wires
Yes, I think the majority of the opportunity we have going into FY '05 is really centered around two types of people, either the development work being done on the government level internationally, most specifically or in Asia; or some of the OEMs on the rotating machines side in Europe. Those are the two sides that we focus on most in the next fiscal year.
- Analyst
And maybe a short related question, could you -- a little color around the significance of the patent win in the HTS segment. Is that one of the -- I guess the patent that kind of helped bring Sumitomo to the table over the last year or so, with regard to some of the projects that you've been engaged in?
- President and CEO
Well, you may well say that but I certainly wouldn't want to comment. Specifically on that point, but clearly, that patent has been in contention for now 14 years. It is almost a record holder in the U.S. patent office here. It's very strong because it has withstood all of those tests, challenges from various companies around the world. Finally it is issued. It is a very strong part of our patent portfolio and clearly it had a both the attention of Sumitomo earlier on, as well as others today.
- Analyst
Thank you.
Operator
Your next question today is from David Hurwitz with SC Fundamental. Go ahead, sir.
- Analyst
Hi, good morning. I just had a question on your new orders. It looks like they have been down sequentially a little bit. They were $17 million in the first quarter, $5 million last quarter, and just $3 million in the most recent quarter. Can you comment on that.
- President and CEO
Yes we commented on that in the last two earnings calls as well, that sustainability of those kind of huge orders that come in from major contracts is unlikely to be sustained. I don't know Kevin if you wand to add anything. In other words it's not unexpected at this point in time.
- CFO
Yeah, I mean, that $17 million was -- a very large chunk of that $17 million in the first quarter was the LIPA contract. I think those are -- it is obviously not the rule, but more -- more the exception in terms of the dollar value. But I think also we -- you know, we are seeing some wire orders coming in, but clearly, I think to say that we'll have $17 million sustainability over the succeeding quarter is not realistic.
- Analyst
That makes sense. Could you also follow up a little bit on that in terms of wire orders. I I think previously you expected $10 to $12 million for the fiscal year in wire orders, and I'm wondering if you're still expecting that type of range? For the fiscal year.
- President and CEO
No, I think we -- I think what you are referencing is in the past we have -- we have discussed $10 to $12 million as a revenue range for AMSC Wires. I think our position at this point is given the revised revenue guidance for the company in total, we'll stick to just talking about revenue in total for the fiscal year.
- Analyst
Okay. Thank you.
- CFO
Yep.
Operator
The next question is from Robert Smith with the Centers for Pro Forma. Go ahead, sir.
- Analyst
Hi, guys. Good morning.
- President and CEO
Hello.
- Analyst
The adjustment to the $80 million quote book, you said four dropped and seven new ones appeared. What does that $80 million become so to speak at this point?
- President and CEO
Yeah, good point, Bob. I should have thought about putting that in. It's around $90 million now.
- Analyst
Then you mentioned the industrial area of the -- the five industrial customers. What would that round out at about, I mean if taken together? I know they are just discussion and things like that.
- President and CEO
They are not discussions they are actually quotes that go in.
- Analyst
Okay.
- President and CEO
Look, oh, something like -- you know on the order of $10 million.
- Analyst
Okay. Thanks very much.
- President and CEO
Yep.
- Analyst
Good luck.
- President and CEO
Thanks.
Operator
Your next question is from Trenton Fagg with Wimberly Investments. Please go ahead, sir.
- Analyst
Good morning.
- President and CEO
Good morning.
- Analyst
Just on the wires division, I would like to know what -- whether you're production constrained or order constrained on what you are producing; and what the quarterly production rate has been over the last year.
- President and CEO
Well, we're not going to go into the quarterly stuff here. We don't do quarterly stuff here in the terms of that. I will answer the general question about constraints and Dave maybe wants to comment on that. But so far it's been production constraints at this stage of the game. So we have lots of backlog. We're working against that backlog, doing quite well now. Dave, I don't know if you want to add to that.
- General Manager, AMSC Wires
I think that's pretty much the answer. The question now is just -- is developing all the new customers that we have in queue.
- Analyst
Okay. So you're basically selling all you can produce?
- General Manager, AMSC Wires
At this point that's correct.
- Analyst
What's the pricing environment like?
- General Manager, AMSC Wires
On wire? We sell wire on a per meter basis, dollars per meter basis; and frankly right now because there's so few places they can go for wire, the wire pricing is in a development stage. So you are looking at most customers buying relatively small quantities and the pricing could be anywhere from $20 to $30 to $50 a meter depending on the specific application.
- President and CEO
We like to say, the ASP on this is about $20 per meter.
- Analyst
Okay. All right. Thank you very much.
- President and CEO
Sure.
Operator
We have a follow-up question from the site of Jim Rashidi.
- Analyst
Greg if you were to look at the opportunity again in the PE business, what do you think might be required to close this business? Is it just the slowness with which these customers move, or do you feel that you might have to add to your team in terms of being able to produce, perhaps more studies for these folks to get this to be converted into -- into orders? What's your sense on looking at that? Because clearly the opportunity seems to have gotten bigger.
- President and CEO
You're talking about the Power Electronic Systems right.
- Analyst
Yes, I am.
- President and CEO
Well, look, you know, we have General Electric, GE Energy now, is our partner. It's been almost four years now, so our reach, our marketing and sales reach is extended considerably through GE Energy. Through the regional sales guys, not just in North America. You may remember last June we added South America as well, and so we're actively engaged with them. We also have a direct sales force. We're actually getting close to hiring somebody to -- for our direct sales force out on the West Coast in California, the fifth largest economy in the world. There's probably now going to start producing more opportunity for us in PES sales so we're going after. Don't forget in Asia we have Britex Technology out of Singapore as our channel into the Asia Pacific region; primarily China and Taiwan at this stage of the game.
No question, Jim, we'll have to continue to expand on that front. You know, we're doing that I think in a very measured way. You don't want to overspend here, but last time, one of the previous earnings calls, I know during the last six months we commented that we did have a constraint in terms of our network analysis. We're getting more selective with the calls coming in and to say-- to really evaluate, put them through a screening process, would this potentially turn into an order or not. A couple of years ago we would take anything that moved, and now we have become more selective. So we seem to be holding our own on that front. But we are looking at in fact, expanding our network analysis team as well to be able to handle the continuing volume. We're watching this carefully. You heard Kevin talk earlier about our preservation of capital and watching our expenses. We're doing quite well on that; you don't want to go overboard. We don't want to be pennywise and pound foolish here. We're watching it very carefully.
- Analyst
I don't know if you have this number at your fingertips, you may not. I'm curious if you look at your headcount of folks that are focused in this area, roughly how many people are we talking about, knowing also that you have the additional support of GE and your Asian partner? But where is it roughly now and where do you think it would go in the next 12 months?
- President and CEO
Well when I include the transmission planning people in here, which we do, because they are clearly a part of the sales team, and if you threw me in there by the way; because I call on customers as well but keep me out of it and GE out of it, keep Britex out of it; we're at 10 to 12 people.
- Analyst
And you can see that going in the next 12 months?
- President and CEO
Yeah, dictated by demand. We'll probably get in the 15 to 20 range.
- Analyst
Okay. Thanks.
Operator
We have a follow-up question from the site of David Hurwtiz. Go ahead, sir.
- Analyst
I'm trying to understand some of the accounting changes. On a D-VAR order, in particular it sounded like on an answer to a previous question that that's something that would -- on an order would not go into deferred revenue; is that correct? Is that something that would be booked quickly?
- President and CEO
First of all, let me comment that there are no accounting changes. To be quite specific about it.
- Analyst
I'm sorry, I didn't mean to imply that.
- President and CEO
Okay. Thanks. And, you know, I will let Kevin give a little more detail too. It ranges. A D-VAR order is now a standard product. We get an order from a utility for a D-VAR order, we put it together and ship it. We are -- you know these wind farm orders that we specifically talked about in the press release are, you know, custom or semi custom. They are more standardized as each day and year goes by. They are turnkey projects. For example on the one that we're sending to Scottish and Southern in Summerview up in Canada, we are getting payments on a regular basis. We got, in one case, a cash down payment. We have already billed the other one. In fact by the time we ship these in March, on plan, we will have billed for about 80 to 90% of the value of those D-VAR units. So you know, we thought you might use percentage completion. Kevin do you want to comment further.
- CFO
Could you clarify the question just so that I -- I want to make sure I'm precise.
- Analyst
I guess the real question that I'm getting at is, it sounds like there's the hope of a rush of orders like there was to some extent last year in the fourth quarter for D-VAR and some other is similar products. But it looks like you're guiding after some of the percentage of completion changes to kind a flatish fourth quarter to last quarter and to last year's fourth quarter. So I was trying to balance those two to try to understand how those mesh together.
- CFO
Well, I think clearly with what we discussed earlier, in terms of the reexamination of our revenue recognition, there will be--the level of order activity in Power Electric Systems in a given quarter will not translate into revenue in that same quarter.
- Analyst
I see.
- CFO
There will be a delayed impact and I think that's what we're trying to convey here. So I think what Greg is alluding to is, you know, he has talked about the level of optimism in terms of the Power Electric Systems orders; but I think what we are trying to say is that there will be -- the idea of an order converting to revenue in a given quarter for a Power Electronic Systems order, you know, probably will not happen.
- Analyst
Okay. Great. Thanks.
- CFO
Okay?
Operator
We have a follow-up from Robert Smith. Go ahead, sir.
- Analyst
Maybe John can speak to this. Is there a -- what you might call a sense of urgency in the halls of Congress during an election year to have something with great reliability in the electricity to fly before the summer hits?
- VP, Electric Industry Affairs
That's very hard to predict. I would say of all of the energy topics on the table in Washington, grid reliability is considered the most urgent to address. So I think it's reasonably safe to say that if the energy bill sort of -- the wheels fall off the wagon and it comes apart, then something on grid reliability would likely move forward pretty quickly.
- Analyst
In time for the summer?
- VP, Electric Industry Affairs
Probably -- I don't know about in time for the summer. It -- it's very hard to predict the calendar.
- President and CEO
The electricity -- the electricity title in the energy bill doesn't say, you know we're going to spend x dollars --
- Analyst
I understand that but it would give certainly a message to the utilities.
- President and CEO
Oh, yes. Absolutely. I mean, look -- I mean utilities are great customers. We love them very much on the other hand they often make decisions to defer spending.
- Analyst
Sure.
- President and CEO
And so a little extra incentive doesn't hurt.
- Analyst
The other question I have is, is there anything to do with the patent award that reflects upon second generation?
- President and CEO
The patent we just talked about, what was it yesterday?
- Analyst
Yes.
- President and CEO
No. That's all first-generation oriented. That's the basic material, the superconductor material that's used in first generation wires.
- Analyst
So it just keeps competition away from first generation.
- President and CEO
Yes, protects our market position in first gen.
- Analyst
Okay. Thank you.
Operator
We have a question from the site of Carl Palmery. Go ahead, sir.
- President and CEO
Hello?
Operator
Mr. Palmery your line is open.
- President and CEO
Perhaps you want to move on to the next one.
Operator
We'll go next to Eric Prouty with Adams, Harkness, & Hill. Please go ahead.
- Analyst
Great. Maybe you can answer a question just on the capacity of the power electronics side. I think some of the work you were doing had been outsourced. What is the ability from a capacity standpoint to -- well what level of orders could you meet in a given period of time with the current capacity?
- President and CEO
Eric, you know, you are right. A core component, if you will, our subsystem, maybe I should call it in the D-VAR systems is a power module or these power converters and those are our proprietary design. We outsource that. So we receive from an outside source the subsystem called the power module. We then assemble those ourselves and it is an assembly. We connect them all up, optical fire communications, et cetera, et cetera; and put that incentive or trailer or container or in some cases we are building separate on the floor units. So how much capacity? Kevin, help me out on that. I think we have around $20 million worth of capacity in the current facility. And Kevin is shaking his head yes.
- Analyst
Okay. About a $20 million per year?
- President and CEO
Per year.
- CFO
Yeah.
- President and CEO
Capacity, existing capacity.
- CFO
And, Eric, I think the point on the capacity is-- the biggest constraint that we would have is essentially how quickly we can ramp up to supplier based, particularly the supplier that provides the guts of the power module. And we've had pretty good luck with fairly quick turn around time with that particular vendor. But in terms of our own internal ramp up of capacity, that is not an issue for us.
- Analyst
Right. Okay.
- President and CEO
It is basically, you know, buy a bigger warehouse to put the trailers through.
- Analyst
Sure. And then, Kevin, just a question on the change of the revenue recognition. When did you come to this conclusion during the quarter? Is this a post-quarter discussion with the accountants?
- CFO
We came to the conclusion within the last week.
- Analyst
Okay. Okay. Great. Thank you.
- CFO
Yep.
Operator
We have a follow-up from Jim Rashidi with Needham & Company. Go ahead.
- Analyst
Thanks. Kevin, can you help us at all with some of the line items in the P&L?
- CFO
Sure. Specifically, research and development expense for the quarter was $3.6 million.
- Analyst
Okay.
- CFO
SG&A was $1.6 million. And gross margin was about a negative $1 million.
- Analyst
Okay. Great. Thank you. And just in terms of your R&D, is that a level that we should think about, kind of going forward or as you start moving towards doing more of the 2g development work, you know, should we start moving that up?
- CFO
Yeah, I -- I think that I could probably more accurately answer that in the next call. Obviously we're going through our budgeting process for fiscal 2005 right now, Jim and those questions that you are asking are precisely the ones we're debating internally as well. So I would ask that, you know, if you would wait until the next quarter and I can be a little more precise on that.
- Analyst
Okay, thanks.
- CFO
Yep.
Operator
We have a follow-up from Peter Patterson. Please go ahead, sir.
- Analyst
Greg, hi.
- President and CEO
Hi.
- Analyst
Looking at the balance of the year, are you still -- hopeful of additional demonstration sites around the world.
- President and CEO
Yes is the answer. I mean we're still -- for example, in cables, we're still looking for another order for wire, for cable demonstration. I mean it won't be our cable demonstration, but certainly the wire for that is very important to us. So we'll see more of that. There's others that are being developed around the world. We're very much in contact with the people developing those, demonstration projects to be clear. If you talk about SuperVAR or ship propulsion motors, the answer is yes. In fact we specifically have had for some time now, a goal to get the first 5 megawatt motor out on the water in calendar 2005. We're marching towards that goal as we speak. It's one thing to have the land-based test and one going down at CAPS, Center for Advanced Power Systems, is pretty sophisticated with simulated ship propulsion conditions; but you really want to get one out on the water and that's been our goal and, again we'll keep marching towards it.
- Analyst
Thank you.
- President and CEO
Yep.
Operator
We're going next to the site of Carl Palmery. Go ahead, sir.
- Analyst
Hi. I'm just trying to find out when the negative cash flow will start. You may have answered that earlier. I apologize. I had to leave for a period. You had mentioned that you had some positive cash flow, and it looked like your negative cash flow was stopped in fiscal 2005.
- CFO
I -- I think I missed part of your question, but I will try to answer. Yes, we did have positive cash flow this year, included -- in this quarter, excuse me, this past quarter; which includes the proceeds from the stock offering. If you excluded the stock offering proceeds, we -- our cash burn was $3 million, which was the lowest in about 15 quarters. I think we have said in the past that we would be a cash consumer, at least for the next 18 months to two years. So I think that, again, we're going through our budgeting process now but I think that statement is still on hold. Still applicable.
- Analyst
Okay. So you will really -- for two years you will still continue to have cash burn?
- CFO
On an operating basis, yes.
- Analyst
And you still expect to have break even by 2005?
- CFO
Fiscal 2005?
- Analyst
Right.
- CFO
No. We have never said that.
- Analyst
Okay. Then I must be -- what was that?
- President and CEO
Could you get closer to the phone, sir?
- Analyst
Yeah, I'm sorry. How is that?
- President and CEO
Yeah, better.
- Analyst
I guess break even, what was it for the quarter was it -- I guess I got my information mixed up, so I will have to --
- President and CEO
Okay, well, maybe we'll get you next time.
- Analyst
Okay.
- CFO
Thanks.
- Analyst
Thank you.
Operator
Our next question is from Robert Smith. Go ahead, sir.
- Analyst
Could you just give any additional flavor to the international sector possibilities you mentioned in passing?
- President and CEO
Probably no -- I don't think we really can, quite frankly. There's some competitive issues we would not want to get into. But Dave mentioned Asia Pacific, clearly there as a lot of opportunity there. There's some opportunities in the ship propulsion arena, rotating machines over in Europe that we're actively pursuing; but beyond that we would rather not get into any more detail.
Operator
Going next to the site of Jeff Peeler. Go ahead, sir.
- Analyst
Hi, Greg. I would like to know, are you anticipating revenues from ship propulsion motors, besides the Navy contract, to be figured in 2005 estimate of revenues?
- President and CEO
Fiscal 2005 revenues, well that's probably on the edge. You know we hope to have something on the water. Whether we actually recognize revenues is still debatable. As we go through the budget process and I get the information from the teams, we will look at that more closely; and as we get to the May conference we'll be able to give you a better idea about that.
- Analyst
Thank you.
- President and CEO
Yeah, you're welcome.
Operator
The next question is from the site of Edward Rainert. Go ahead, sir.
- Analyst
Yes, I would like to know if there's any possibility that something will be salvaged in cable installation at Detroit Edison, that joint venture with Parelli.
- President and CEO
That project was ended, oh -- it's coming on two years now. The summer of 2002. So that's one from the past. So that's no longer in operation. It hasn't been for almost two years now.
- Analyst
There was an attempt to salvage that one phase of it and that's been abandoned as well?
- President and CEO
Yeah, that kind of passed by the end of the summer. The DOE and Parelli walked away from it at that point in time.
- Analyst
Thank you, sir.
Operator
We have a final question from the site of Jarett Carson.
- Analyst
Just a quick question on the industrial power quality orders. Is that coming from more semifab type stuff out of Asia, or are you seeing traditional manufacturing type customer flow? Can you give me more clarity there?
- President and CEO
It's primarily from more traditional processing industry, let's call it.
- Analyst
Okay.
- President and CEO
So there's some semi in there but it's primarily traditional processing.
- Analyst
Okay. Thanks.
- President and CEO
Sure.
Operator
We have no further questions Mr. Yurek. I will turn it over to you for any closing comments.
- President and CEO
Thank you for your time and questions today. We thank you for supporting the company and we look forward to meeting with you next May. Thanks.
Operator
That does conclude today's conference. You may now disconnect your lines. Thank you for your participation.