使用警語:中文譯文來源為 Google 翻譯,僅供參考,實際內容請以英文原文為主
Operator
Good day, and welcome to Agnico Eagle Mines Limited Q2 2014 call. Today's conference is being recorded. At this time, I'd like to turn the conference over to Mr. Sean Boyd, President and CEO. Please go ahead, Mr. Boyd.
Sean Boyd - President and CEO
Thank you, Operator, and good morning everyone, and thank you for joining our Q2 conference call. I'd like to start with going through some of the highlights of the quarter, and then we'll take you through our operations. We'll also talk about exploration results this quarter, because we did put out an exploration update, along with our quarterly numbers and results.
If we look at the second quarter and the first half, we saw record production and also record safety performance, and if you look at the quarterly cost per tonne at our mines, essentially all the mines at operating at a cost-per-tonne level that's below budget. So, excellent results, and it's a credit to the hard work and focus of all of our employees.
Another highlight of the quarter was the joint acquisition with Yamana Gold of Osisko Mining, completed in June. I'll spend some time on that during the presentation and talk about where we are and where we're headed with that asset. But, I'd also like to welcome -- in the room today with us is an old friend of ours, Daniel Racine, who's now with Yamana Gold as a SVP on their Canadian operations and helping them on the operating side, and our team is working closely with Yamana and Dan on the Canadian Malartic asset. So, as I said, I'll talk a bit more about that in the presentation.
We also did increase our guidance, and absent the addition of Canadian Malartic, we did see an increase in the ounces being produced out of the Agnico Eagle mines. As we indicated earlier this year, we would be updating the guidance, which we did, and essentially, pre-Canadian Malartic, we're seeing our production estimate for this year go from a level of 1.19 million ounces to 1.23 million ounces. And we've also indicated in this press release that, given the stronger performance that we expect to see next year at Meadowbank and Kittila, Goldex, and our southern business unit, that we'll be updating our 2015 production guidance with our Q3 numbers this year as we advance through the budgeting process for next year.
And as I said, we'll take about our exploration results as we move through the presentation, when we talk about each of the operating units. But the highlights there were continued good drilling results at the IDR property, which is about 50 kilometers north of Meadowbank, and also a very good deep intersection at Kittila, which suggests that deposit is continuing to grow.
As far as the operating results, if we quickly go through just the highlights on each mine, La Ronde, we get continued good cost numbers, so good cost-per-tonne performance. The mine is ramping up, [and] the lower mine will see an increase in the grade in the second half of the year, continuing into next year, as we get more [stolts] open up in the lower mine. Another highlight was Goldex. Another strong quarterly result from Goldex in terms of production costs, and we're also ahead of schedule in terms of our ability to run the operation at 6,000 tonnes a day, probably about six months ahead of schedule.
At Kittila, the mill expansion is ahead of schedule, and also the original target was to get the plant up to a capacity of about 3,750 tonnes per day. It looks like the plant will handle about 4,000 tonnes a day, which will have an impact on production over the next several years at Kittila.
Meadowbank, very good cost per tonne performance. We're now mining closer to reserve grade. In the second half, we're looking at average production on a quarterly basis in the 90,000-ounce range, but that bounces back nicely next year, where we'll be in the sort of 100,000 to 110,000 ounce range in the quarter, so another strong year coming from Meadowbank in 2015.
And in our southern business, good, low-cost, really good cash generation contribution, to the Company's cash flow, and the La India project is ramping up nicely.
In terms of cash margin, almost $200 million in the quarter, so a good operating quarter. As far as financial results, I would also like to point out the cash flow on a per-share basis. So, in the quarter, our cash provided by operating activities, about $1.06 per share, $198 million. That's up about 160% from the second quarter of 2013.
If we look at the first half of this year, $445 million cash provided by operating activities. That's a double over where we were for the first half of last year, and that's despite a 12% drop in the realized gold price. So, another strong quarter, a strong first half, and that allowed us, as we said, to increase our production guidance and lower our cash cost guidance.
From a financial position standpoint, a balance sheet that still has a lot of financial flexibility. Our net debt is slightly more than $1 billion, very manageable. We had our investment-grade credit rating reaffirmed in the quarter by DDRS at BB-low with a stable trend.
On the capital side, we're seeing a slight increase in our CapEx. Some of that is coming from Canadian Malartic. I'll provide some details in a minute, but we're also seeing a little bit more at Goldex. We're accelerating the ramp access in the upper part of the D zone, and that will result in us being able to put that into our life-of-mine plan as we look at the various satellite zones at Goldex.
And we also have the completion of the plant expansion at Kittila about six months ahead of schedule. So, we were spending money faster than we had expected, and actually the Kittila expansion is actually on budget, maybe slightly below budget in total.
Just going through each mine individually, La Ronde, again, extremely strong cost per tonne performance coming out of La Ronde. In July, we did have a three-week shutdown where we upgraded the hoist drive. That was giving us some trouble over the last year, so that resulted in some down time, unscheduled down time, so we fixed that issue right now. As far as the cost performance, per tonne we're about 8% below budget, and we're ramping up nicely in the lower part of the mine. The first half grade, about 3.2 grams per tonne. We're looking at second half grade in the sort of 3.5 grams per tonne. The underground development is going well and on schedule.
At Meadowbank, Q2 cost per tonne, really good performance, CAD71 a tonne. That's down from a year-earlier number by about 15%. So, the mine is working extremely well, record throughput in the quarter, 11,500 tonnes a day, average grade about 3.7 grams per tonne.
As we said in the opening, we're looking for average production in the second half of about 90,000 ounces per quarter, but rebounding in 2015 to about 100,000 to 110,000 ounces per quarter as grades start to pick up again. And from an exploration point of view, as we said, we had some good results at IDR. That's a project we picked up last year, and we started drilling it with a small program last year. We extend that program, given the results last year. We went back at it this year. We finished up the expected drilling earlier this month.
As a result of the strong results, we agreed with our exploration team to continue the program in two phases, and each phase has an estimated cost of about $2.5 million. Within the first couple of weeks of phase one, we already agreed to give them the go-ahead to just continue on with phase two. Not only have we seen good drill results, we're seeing good prospecting in that area, so that will continue to be a major focus from our exploration group, given the results.
I'd like to spend a little bit of time on Canadian Malartic and give you a little bit of color on some of the updates that we provided around the guidance. As you saw from a production standpoint, the guidance that we've put out is [500,000] for 2014, is 510,000 to 530,000 ounces. That's down slightly from the Osisko life-of-mine, which was at around 530,000 ounces.
In 2014, the average tonnage is around 50,000 to 51,000 tonnes per day, which is fairly close and consistent with what was in the Osisko life-of-mine. Clearly, both Yamana and Agnico are looking to optimize the crushing and grinding circuits so that we can improve the throughput levels as we move forward. The grade that we're expecting for 2014 is about one gram per tonne, which is also consistent with what was in the Osisko life of mine.
The cash cost guidance increased to around -- for 2014 to around $700 an ounce, and that includes the 5% NSR. It also includes additional costs related to the acceleration of the [Goldie] pit, which is going to increase our mining flexibility, moving forward. It also includes increased drilling costs in the north part of our pit, which is closest to the town of Malartic, and we're really doing that to reduce the impacts of noise and vibration.
We also had an update on our CapEx. The CapEx, we have indicated, is going to increase this year by about $40 million, while $13 million of that is the Goldie pit. There's the $12 million related to capitalized stripping, and there's $9 million related to additional mining equipment, predominantly two trucks, which will allow us to more efficiently manage the waste rock and a lot of contract work in sort of waste management. So, part of our optimization is focused on trying to eliminate some of the contractors that are on-site.
G&A, as we said in the press release, the initial estimate of annual savings is about $12 million to $15 million a year. We're still looking at this. We're in a transition phase for the latter part of this year, but we'll have some more clarity on that for 2015 and forward with our Q3 update.
The areas that we're focused on, both at Yamana and Agnico, to optimize the operation, as we said, are really to improve and expand the crushing and grinding capacity. That's certainly something we're focused on in the short-term. But, more medium-term, we're looking to expand the capacity of the plant. The life of mine calls for the generation of significant stockpiles, so what we're trying to do is look at a way that we can eliminate the handling costs associated with the stockpiling.
So, what we'd like to do is find a way that we can increase the capacity of the plant and process more of the ore that had originally intended to be stockpiled as it's mined, so we're handling that material less, and that's a big part of the focus.
We're also looking at procurement. Given our large presence in the region and buying power, we think there's a way that not only can we save on some of the costs at Malartic, but we may be able to save some of the costs at Agnico when we combine the buying power of both of the operations.
We're looking at improving the drilling and blasting techniques in the pits to improve the fragmentation. We went through a lot of that at Agnico at Meadowbank, so we've brought some of the Meadowbank people to look at that and see where we can make some improvements. Other areas that both Yamana and Agnico are focused on on optimization are on the maintenance side. We also did have some issues at one point at Meadowbank, which we improved dramatically in terms of equipment availability due to a much better maintenance program. So, we're reviewing all those things, and we'll have more color on a lot of those efforts as we go into our third quarter, with our third quarter results.
I'd just like to quickly mention, on Kirkland Lake, the focus is primarily Upper Beaver. There are two drills still going, but we're reviewing all of the targets and looking for a meaningful budget next year on exploration, focused on Upper Beaver and some on Canadian Kirkland, but we'll provide more details as we go through the balance of this year.
And finally, on Canadian Malartic, both Yamana and Agnico are hosting a site visit on September 30. So, if there's an interest to participate in that site visit, then please contact either Agnico or Yamana and express your interest.
Moving on to Kittila, the quarterly production at Kittila was impacted by a two-week tie-in shutdown to accelerate the mill expansion. There is another tie-in coming later this year, but we also had a decline in recoveries. That's fixable. We're doing some work in the tailings and polishing pond area, so we're generating a little bit more thiocyanate in the recycled water. So, that's something that we can fix, but it did hurt our production on the quarter.
I think, more importantly for us, the mill expansion is six months ahead of schedule, as we said, and our capacity now will be higher than what we thought. It'll be 4,000 tonnes per day rather than 750. That will allow us to increase our output as we go through 2015 and beyond. And the focus over the next five years will be to increase output there, and do it by way of ramp, focusing on the Rimpi zone. As far as the shaft goes, our sense now is we can defer a decision on the shaft for two, possibly three years, and still get an increase in production over the next five years by focusing on the ramp development and taking advantage of the increased capacity of the plant expansion.
From an exploration point of view, we know this deposit extends at depth. We had further evidence of that with a drill hole that came in in the Suuri trend, which actually extends and plunges to the north under Roura, so that will continue to be a focus for us. And essentially this is a long-term asset. It'll be around for several decades. We're continuing to drill it, and our challenge is just to find the right match and the right production rate at Kittila as we grow that deposit.
At Goldex, another, I would say, outstanding result. Good production, excellent cash costs, excellent cost per tonne at $33, which is well below what we had guided and certainly well below our budget.
Our mining rate is ahead of schedule in terms of that ramp-up to get to 6,000 tonnes per day. The plant capacity is actually 8,000 tonnes a day, so that opens up the opportunity as we look at satellite zones, and actually something in the region called Akasaba which we're working on, so we're looking to increase output at Goldex with these additional satellite zones, as we move forward and extend the mine life.
And it certainly helps, as we've said before when we were looking at restarting Goldex, we said the key for Goldex in terms of future investment and being able to extend the mine life and add additional production was going to be the cost profile. And we've proven that we could be well below the CAD40 Canadian, so that's a good sign, and that will help us generate increased returns on the satellite zones as we look at how to optimize Goldex. We do have a long section in the presentation for you to look at.
At Lapa, they're in the last couple years of mine life. They continue to sort of focus on optimizing what they have left. In fact, their cost per tonne performance continues to be good. They came in at CAD107 versus a budget of CAD119, so continued good work there.
At Meliadine, also good drill results, study's progressing. Should have the study completed by the end of this year. We'll be in a position to talk about that likely in February when we put out our updated life of mine and our detailed three-year plan.
Moving on to the southern business, again, good solid contribution from a cash flow generating point of view, low-cost operation. Our quarterly production in the southern business unit was 73,000 ounces, cash costs of $496. We're expecting more output, growth from our Mexican operations in 2015, so that'll be part of our update with our Q3 results.
Looking quickly at Pinos Altos, the quarterly production was above budget, about 17% above budget, and our cash costs at Pinos, at $481, were below budget. So, continued good work there, shaft progressing as expected, and there's no major issues there.
Creston Mascota, the phase three leach pad has now been commissioned, so that's been brought back on line very successfully over the last year in a bit, and performing well. Good, solid production, good, solid cost.
La India ramping up well in terms of ounce output and also cost performance. We've done some modifications on the crushing and stacking circuits, which we expect to complete in the third quarter, and that should help us with our production cost profile at La India as we go forward, so a good position there.
Just wrapping up before we take questions, in terms of production guidance, as we said, now midpoint of the range, 1.35 million ounces for 2014, cash costs in the $650 million to $675 million range. More details will provided in Q3, not only on Canadian Malartic but also on our forecast for 2015 guidance, whereas we said we're seeing the ability to produce more than what we indicated back earlier this year in February for next year at Meadowbank, Goldex, Kittila, and our southern business unit.
We'll continue to focus on exploration. We've seen some good results. We've actually got some more updates coming, given the heightened level of activity at some of these key projects throughout the balance of this year. And we'll continue to assess some of the satellite deposits as we go forward.
Just ending on one slide, which is our growth slide, and we can see that, in quite a short period of time, we've gone from a million ounces, which took the Company over 50 years to get to. We've continually ramped up, and what we'll be in a position to do in Q3 is talk about 2015. And we do see some upside in the number that's posted here, of 1.546 million ounces. And ultimately, when we update in February, that'll likely be reflected in 2016 as well.
So, on that, Operator, we'd like to open the lines and take some questions.
Operator
(Operator Instructions) Andrew Quail, Goldman Sachs.
Andrew Quail - Analyst
Morning, Sean and Tim, thank you very much for taking our question, and just a couple of quick ones. Firstly, on Kittila, obviously tonnage went down, (inaudible) went down. Can you give some guidance, going forward, on if you see that rebounding over the next couple of quarters, and especially say something about recovery into 2015?
Sean Boyd - President and CEO
Well, I think recovery for 2015 in the second half may be a bit challenging. As you've seen in the second quarter, we'll be probably in the low 80s. [Little while], we've had some water management issues and water quality issues, and it's bringing some recovery upsets. We're investigating because we're seeing other areas. But, at this stage, we feel that, by the end of the year, we should be back on track.
As far as the guidance is concerned, with the two tie-ins, the lost production has occurred, but we're going to be advancing that, going forward, with the stronger throughput rate. So, we'll be on the very low end of the guidance that was published earlier in the year.
Unidentified Company Representative
Yeah, for Kittila, Andrew, I think in terms of that specific asset, we're probably down about 10,000 to 13,000 ounces with some of these issues, but that's more than been made up -- more than been made up by the other mines, and that's reflected in the updated guidance number that we put up.
Andrew Quail - Analyst
Yes. Great, thanks. And looking at the southern business, guys, if I look at, I suppose, both Pinos Altos and La India, look, sort of on a CapEx, or sustaining CapEx basis, do you think we can sort of use that run rate that you guys are at in the second quarter to sort of extrapolate out through the end of the year and into 2015, especially coming (inaudible) La India now, you're sort of at more of a steady sort of state. Is that reasonable to assume?
Tim Haldane - SVP of Operations , US and Latin America
Yeah, this is Tim. I think it's reasonable, with the economy out there -- we've got some CapEx that's not sustaining, and I'm not sure how it's broken out there, and we'll have a little CapEx for leach pad expansion next year, and we've got the shaft CapEx at Pinos Altos this year. But, the sustaining, that should be pretty flat.
Andrew Quail - Analyst
Great. And last question is tax-related, guys. Just you know, can you give some guidance around what is best to use going into the second half, and maybe guidance around the full-year for FY 2014, effective tax rate?
David Smith - SVP of Finance and CFO
Hey, Andrew. I think we provided that guidance in the press release, and we are saying 35% to 40% overall. And the reason that that is a little bit lower than it previously was is because a large part of the operating profit so far this year has been at Meadowbank, which is effectively shielded, and so there's not a lot of tax being paid through that Meadowbank profit.
Andrew Quail - Analyst
Okay. Thanks. I'm sorry, it's been pretty busy morning here, as you can imagine. That's all for me guys. Thank you very much.
Sean Boyd - President and CEO
Thank you.
Operator
Please go ahead, Mr. Haughton. Your line is now open.
David Haughton - Analyst
Yes, good morning, and thank you, Sean and team, for the update. Just following on on the Kittila, it's pretty good that you've been able to get the extra throughput out of the mill expansion, getting out to 4,000 tonnes a day, but the challenge there is really whether the mine can match that. What's your expectation of the mine being able to get up to that level?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, I think the plan with the expansion was to process in the next two years the available lower-grade stockpile and service. We've got between 400,000 to 500,000 tonnes accumulated since the beginning, and the expectation this year is for the mine to ramp up to that 3,750 rate by 2016.
David Haughton - Analyst
Okay, that still gives you some extra capacity in that plant. Would you be thinking about improving the underground production rates to be able to fill that level?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, I think by pursuing development in the Rimpi zone down the road, we're also modifying or adapting the mine plan currently to provide more mining [horizon] to increase flexibility in the mine. But, the better flexibility down the road will occur in 2017, 2018, once we start getting into production from the Rimpi zone.
David Haughton - Analyst
All right. Now, at one stage, there was essential to have almost a step change expansion there, but it was contingent upon possibly getting a shaft in. Is that still part of the thinking in the medium- to longer-term at Kittila?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, I think it's still out there, going forward, but I think the next two or three years we've decided to focus on the Rimpi deposit and the access to it, because that will provide more mining flexibility. Having more ramps will provide also more better access. So, the economics of the shaft are not as solid until we get more, I guess, results at depth on the reserve side. And there's actually no rush at this stage to implement the shaft other than to accelerate the exploration strategy, and our exploration ramp is providing that access presently, so it's a good compromise.
Sean Boyd - President and CEO
It's more, David, a capital allocation question at this point, as we look at a number of opportunities that we have. And as Yvon said, it's not essential that that shaft begins now, because we can still see the ability to increase production at Kittila over the next four to five years by accelerated ramp development and getting at the Rimpi zone, which is better grades and some better thicknesses.
David Haughton - Analyst
Yes. Just switching now back to Meadowbank, interested to hear your expectation of 90,000 ounces per quarter for the balance of the year, then 100,000 to 110,000 next year. Would it be right to think that next year is mainly driven by grade?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, next year will be mainly driven by mining in Vault, which is typically lower in the reserve grade, and mostly higher grade by getting some of the pushback ore in the Portage pit in the south side. So, the grades will be coming more strongly next year from the Portage section, and not necessarily from Goose, which will be terminated by the end of the year.
David Haughton - Analyst
All right. So basically, the pushback would get you access to some of the really good material that you got earlier this year, in sequential benches through 2015?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, that's correct, as far as stronger grade at Portage and tonnage throughout the year, but not in comparison to the grades we were getting this year in Goose, so I think that's the correction.
David Haughton - Analyst
Okay, thank you, everyone. Thanks, Sean.
Sean Boyd - President and CEO
Thank you.
Operator
Steve Parsons, National Bank Financial.
Steve Parsons - Analyst
Yes, good morning, thank you. Actually, David asked most of my questions, but just to continue on with the grade -- a look at the grade at Meadowbank, is there potential for that high-grade chute at the Goose pit to extend at (inaudible)? Are you able to push a couple of benches down and get back in there and get that chute?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, I guess on the pit side, the economics of pushing the pit further is no economical. Secondly, we looked at the small underground project and now driving a ramp to try to see if we can make some economics out of the continuity. And unfortunately, the grade is very interesting but the tonnage is not enough to suffice the economics, so we've abandoned that idea for now.
Steve Parsons - Analyst
Okay, very good. That's it for me. Thank you.
Operator
Anita Soni, Credit Suisse.
Anita Soni - Analyst
Hi. Most of my questions have been asked. I just wanted to confirm, were you talking about with the Portage pit grades next year, I think, Sean, that you had mentioned that it was about 100,000 to 110,000 ounces per quarter in 2015 out of Meadowbank. Is that correct?
Sean Boyd - President and CEO
That's correct
Anita Soni - Analyst
All right. And then, also, could you just talk about the labor cost reductions that you've been seeing? I noticed that some of the unit costs were down, and you had said [in] labor costs reductions, and could you just fully elaborate on that?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, I think we went through a rationalization of contractor costs last year, mostly in the fall. I think our costs on the rest have not necessarily gone done, except in certain areas on some smaller benefits package. But, I think the main aspect is we've adopted a more longer-term approach to attrition and try to minimize our level of staffing to its minimum, so I think that's more the results of --from this year, on that aspect.
Anita Soni - Analyst
Right. Maybe just more big-picture, are there any similar types of things on the horizon you can see in terms of unit cost benefits at any of the assets?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, at this stage, we're pretty happy with the initiatives that have been driven at sites from each GM and their teams. They're continuing in that aspect. I think in the last year and a half, two years, they've continued on a cost return basis to continue, and we'll continue to take that long-term approach to that, and we're pretty happy with the performance from the sites in that respect.
Anita Soni - Analyst
All right, thank you.
Operator
Mike Parkin, Desjardins.
Mike Parkin - Analyst
Hi, guys, just a couple of questions. You mentioned in the press release that the seasonal cost at Meadowbank has been deferred to the second half. Can you give an idea of what that means on a per-ounce basis, or millions of dollars?
Yvon Sylvestre - SVP of Operations, Canada and Europe
I don't have the exact number with me, but I think in the past we've budgeted seasonably for some reasons. We budgeted on a yearly basis for now, so I think the seasonal barge season -- and don?t quote me specifically on this, but it's between probably $6 million to $8 million or $9 million.
Mike Parkin - Analyst
Okay, thanks. One other question, just with La Ronda, I guess with our wonderfully cool summer here in Canada, the cooling plant probably hasn't been tested to its maximum level, but how has that been running so far?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, I think the second quarter start-up of the booster fan has been completed, the ventilation network. And presently, we're running not at full capacity on all the compressor systems, so we're quite happy. We're quite happy with the performance of the plant, and, as you've said, the summer's performed better than expected. But, the plant is presently on-stream to deliver the goods for the rest of the deeper development for quite a while.
Mike Parkin - Analyst
Okay. And just last question, with the water issues that were mentioned on Kittila, can you just give a bit more color on what's the biggest issue there that's impacting you?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, there's two or three reasons that are still under investigation, so I'd rather not get into too much details. But, in the past, we've run into difficulties with the re-circulating of waters from the pond and interference of thiocyanates within the oxidation process. So, to the best of our knowledge, that's where we are now, but there are other contributing factors that we're investigating. That's about all I can say at this stage.
Mike Parkin - Analyst
Okay. Well, thanks guys.
Operator
Stephen Walker, RBC Capital Markets.
Stephen Walker - Analyst
Good morning, just a couple of things. First of all, the IDR discovery north of Meadowbank, 50 kilometers, is that as the crow flies? What is the potential infrastructure like to get up there, and at what stage is it at? This is obviously relatively new, but sounds like it's coming together pretty quickly. Can you give us a little more background on -- I guess maybe what I'm asking is when that could potentially be, or if it could potentially be transported to Meadowbank?
Sean Boyd - President and CEO
Well, it's still early, Steve, but things -- I think you're right, things are moving quite quickly, and there's probably another update coming within the next several weeks on that, given some of the things we're seeing. So, we're actually surprised with some of the exploration results.
It would have -- I think the way we've approached it now is our guys are saying that, in order for it to be viable in terms of being able to ship, we probably need to see about a million ounces with grades sort of five gram, so that's still very much possible, although it is early. So, all we've really done is add a $5 million program, allow ourselves to drill likely through the end of September. Certainly by the middle of October you have to be out of there, given the fog and the fact that you're moving everything by helicopter. But, in order to make it work, it would be a road from Meadowbank, but we'd sort of need a rough sort of million ounces at five grams to make it work.
So, it's still early, but things are actually moving quite quickly there. We'll have some samples. There is a trip to Meliadine on August 26. I think there's a couple of spots left. We will be sort of featuring IVR as well, and have core there and some samples that we've collected on surface as well.
Mike Parkin - Analyst
Is there potential for a year-end resource estimate, or is it still too early for that?
Sean Boyd - President and CEO
It's probably still too early, although we've got about 20,000 meters going in this next phase here, so that's a lot of drilling, because these aren't in deep holes. We'll have sections, et cetera, and drill holes plotted on the 26 of August at Meliadine.
Mike Parkin - Analyst
Just to change gears a bit, David, the move to reporting under IFRS, is there a regulatory reason, a tax reason, for that? Is there -- why the decision now, and not previously?
David Smith - SVP of Finance and CFO
It's basically just due to comparability with our peer companies. Everyone's going there eventually, and we didn't see any reason to be the lone one holding on to US GAAP.
Mike Parkin - Analyst
Okay, thank you for that. And maybe Sean, yourself, and again, Danielle if -- wants to add in, when you -- it's been six weeks now since you've basically stepped onto the Canadian Malartic property. What, if any, surprises, positive or negative, has come out of that initial six-week period that you've been on the property?
Sean Boyd - President and CEO
Well, I think from our perspective, we were actually through our due diligence looking at a higher cost per tonne, particularly in the early years than what Osisko was modeling in their life of mine, and so we're essentially seeing that, as we put out our guidance. So, our job now is to use our sort of collective efforts and expertise in certain areas to bring that down, but also to use our efforts on the environmental and permitting side to continue to move the Barnat opportunity forward.
So, the transition's actually gone very well. The teams are working well, and we've been fortunate, from our side, to be able to have some particular expertise at Meadowbank where that team has dealt with some of these issues. And the way we always looked at Canadian Malartic, in terms of a timeline and a progression, is that we saw some of the things that they're dealing with at Meadowbank a couple of years ago. And so, you can see Meadowbank's cost per tonne performance, cost came down from about $100 or more down to the low $70s. So, our focus is certainly on optimization, but cost control, overhead control, but also to help us increase the throughput there, which would make the mine more efficient and also help unit costs.
Mike Parkin - Analyst
Just the current cost of CAD21 a tonne, I guess the -- is it the hardness of the rock? Is it just the awkwardness and having to use the smaller blast hold drills on the north side of the pit? What are the drivers, or what are the main sort of moving parts to that per-tonne cost?
Sean Boyd - President and CEO
Higher strip ratio. Higher strips ratio right now, so that gets better as we go forward. So, the mine, after two or three years, the costs go down just because the strip ratio goes down.
So, I'll turn it over to Christian Provencher, who sort of represents our side on the ground up there, and he can provide a little bit more detail.
Christian Provencher - VP, Canada
Yes, good morning. So, as Danielle mentioned this morning at the Yamana conference call, for sure the costs for year-end are [driven] by mainly Goldie pit that was introduced in the budget this year, (inaudible) budget just to give us, like Sean mentioned earlier, better flexibility on the mining side, so it's a higher strip ratio for this pit. So, it was not budget. For sure, some cyanide costs and fuel costs that we have to add to the budget relate mainly to the Goldie pit addition in the plan for this year.
Mike Parkin - Analyst
Has there been any change in the internal waste in either of the pits, either Goldie or the existing? Has there been any change in the internal dilution increase?
Christian Provencher - VP, Canada
No, there's no change in the number since [the word there], but we're still -- we're looking to do the optimization of the life of mine this fall, so we'll be able to provide some new number this fall.
Mike Parkin - Analyst
Great. Thank you very much for that. That's all my questions.
Operator
Patrick Chidley, HSBC.
Patrick Chidley - Analyst
Good morning, everybody, just a quick question back to Malartic. The cash costs are guided here $695, [something] -- $700 an ounce, and I just wanted to find out what is the all-in sustaining cost on that basis going to be this year?
Sean Boyd - President and CEO
It's probably in the range of about $900 to $1,000, and it depends on sort of a capital. It's gone up a bit because we've added about $40 million to the capital side, so that's probably closer to the $1,000 number.
Patrick Chidley - Analyst
And all that capital that you've talked about this morning, that's going to be operating capital, let's say, that's included in all-in sustaining costs.
Sean Boyd - President and CEO
That's correct.
Patrick Chidley - Analyst
All right, okay. And then, moving forward, do you expect that to come down, or what's the sort of longer-term outlook? Or do you still need to do your analysis?
Sean Boyd - President and CEO
No, that'll be coming down.
Patrick Chidley - Analyst
Okay. And that's because what, because grades are going to go up when you get to the Barnet [side]?
Sean Boyd - President and CEO
On a unit cost basis, less stripping.
Patrick Chidley - Analyst
Okay. Strip ratio's 2.6 to one this year?
Sean Boyd - President and CEO
Yes, going down to about two.
Patrick Chidley - Analyst
In 2015?
Sean Boyd - President and CEO
2.1, over time, over the next two to three years.
Patrick Chidley - Analyst
Okay, good. All right. And just if you could comment on -- there was -- on the Yamana call this morning, someone mentioned that there was a legal dispute about what's known as the [Odyssey] zone, and I'm wondering what your sort of initial impressions on that are.
Sean Boyd - President and CEO
Well, because there is a dispute, there's not much we can say about it.
Patrick Chidley - Analyst
Okay. All right. Well, thanks very much.
Sean Boyd - President and CEO
Okay, thank you.
Operator
Tanya Jakusconek, Scotia Bank.
Tanya Jakusconek - Analyst
Good morning, everybody.
Sean Boyd - President and CEO
Morning.
Tanya Jakusconek - Analyst
Just wanted to ask a question to Yvon and Tim, if I could. Just on Kittila, so that I understand correctly, as we go through next year, that greater 1,000 tonne per day higher rate, is it safe to assume that the previous guidance that we had was assuming just half a year, and then I think we would have assumed a better recovery since we didn't have this water issue. Is that correct?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Yes, that's correct, Tanya. I think the -- in the previous guidance that we put out on the market, we're expecting the full commissioning of that new capacity out in Q3 of 2015. So, we've essentially advanced it almost three-quarters.
Tanya Jakusconek - Analyst
Yes. So, three-quarters, and yet I should then assume, though, a lower recovery because of the water?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, at this stage, I think it's premature to do that as we try to identify what's happening, because some of the issues seem to be seasonal. So, as we know more, we'll provide that information, going forward.
Tanya Jakusconek - Analyst
Okay. And maybe just to finish off on Kittila, just the stockpile that you have, the 400,000 to 500,000 tonnes on the surface, maybe just the grade on that that you're going to be processing over the next two years.
Yvon Sylvestre - SVP of Operations, Canada and Europe
I don't have the exact number with me, but it's probably in the neighborhood of about 3 1/2 grams per tonne.
Tanya Jakusconek - Analyst
Okay. Okay, I think that's on Kittila. Just on Meadowbank, if I could, you mentioned that we're going to be in the Vault and the Portage pit next year, and hence the 100,000 to 110,000 ounces per quarter. Are we going to continue that into 2016, the Portage, or do we phase that out and go just to the Vault in 2016?
Yvon Sylvestre - SVP of Operations, Canada and Europe
Well, we will be mining in Vault and Portage in 2015, 2016, and 2017 as well, but the -- we're going to have a larger proportion of Portage next year, and probably a larger proportion of Vault in 2016.
Tanya Jakusconek - Analyst
Okay. And can you just remind me, because I have the Vault's grade, I just don't have the Portage grade?
Yvon Sylvestre - SVP of Operations, Canada and Europe
I don't have it offhand, but it's above reserve grade in the pushback.
Tanya Jakusconek - Analyst
Oh, okay. It's not the five grams per tonne that we saw in the Goose. Would it be in the four gram range, or -- because life of mine I think is 3.23 -- sorry, the reserve grade.
Yvon Sylvestre - SVP of Operations, Canada and Europe
It will be just -- it will be slightly above reserve grade, Tanya.
Tanya Jakusconek - Analyst
Okay. And Vault's about 2.8?
Yvon Sylvestre - SVP of Operations, Canada and Europe
That's correct.
Tanya Jakusconek - Analyst
Okay. Okay, thank you for that. And maybe if I could ask Tim, I think Sean mentioned that there's upside in the South American unit -- I think it was mentioned Pinos Altos -- when we get the new guidance in Q3. Are we looking at it as Pinos Altos where we're currently mining, or is it the addition of satellites that you're seeing?
Tim Haldane - SVP of Operations , US and Latin America
Hi, Tanya. Yes, our upside in Mexico as compared with our previous guidance is probably going to come from both Pinos Altos and La India, and those are just going to be efficiency -- a little bit more efficiency maybe than we forecast last year, a little bit more throughput at Pinos Altos, Creston Mascota, and La India.
Tanya Jakusconek - Analyst
Okay, so it's not any additional satellites? Because I think there's some upside, too, in satellites.
Tim Haldane - SVP of Operations , US and Latin America
Yes, not yet. I mean, we'll get to the satellites in their order, but not in 2015.
Tanya Jakusconek - Analyst
Okay. All right, good. Well, thank you very much for the clarification.
Sean Boyd - President and CEO
Yes. So, just to follow up on that, Tanya, we haven't provided the mine-by-mine guidance for 2015, so all we've provided on the -- earlier this year was a number of 1,250 pre-Canadian Malartic. So, we'll be able to break that down as we get through our budgeting process.
Tanya Jakusconek - Analyst
Yes. No, I'm just trying to understand myself, Sean, as I look at the news coming out, like, where are we looking for some of these upsides to come from, and just make sure that I understand the grades and where some of these things could come.
Sean Boyd - President and CEO
Yes, okay.
Tanya Jakusconek - Analyst
Thank you for that.
Sean Boyd - President and CEO
Okay.
Operator
(Operator instructions.) And we seem to have no further questions at this time. I'll turn the call back over to management for any closing comments.
Sean Boyd - President and CEO
Thank you, Operator. Thank you, everyone. And just another reminder for upcoming mine trips, so Meliadine, August 26. We'll have an update also on IVR project there. Canadian Malartic with our partners, Yamana, on September 30, and we also have a Kittila trip in November that's tied in with the London Mining Conference of RBC. So, if there's interest in those trips, please let us know.
Thanks again.
Operator
Ladies and gentlemen, that does conclude our conference call for today. We thank you for your participation. You may now disconnect your lines, and have a great day.